Essam M Kamalbrahem Telephone: Cell:832-***-****
Sr. Project/Process Chemical Engineer home:832-***-****
**** ******* *-****: ************@*****.***
Ave,Apt.#19Rochester,NY,14618
Summary of qualifications
Experienced Sr. Project/Process Chemical engineer professional, with over
19 years in Chemical Engineering and Project Management, experience and
high knowledge in:
. Chemical, Petrochemical, Refineries and Powder industries.
. Reviewing basic engineering design and setting up the detail
engineering design.
. Computer skills including: Windows, MS Office Professional, MS Access,
MS Project, PowerPoint, Outlook, Primavera, 3D molding Pro-Engineer,
AutoCAD LT 2008&2010&2011, Bentley Auto plan, Caesar II,SAP, PARADIGM
II,NWA(Northwest Analytical),Exceed,S7 System Tools & Troubleshooting.
. Familiar with Siemens and Allen-Bradley's PLC, HMI,SCADA system, SQL
Database and reporting software.
. Projects management, Using Microsoft Project for planning and tracking
daily all resource requirements, scheduling &planning, capital budgets
control, estimation and implementation.
. Familiar with CPPD(Concurrent Product and Process
Design),APQP(Advanced Product Quality Planning),C&E Matrix(Cause and
Effect) and FEMA Matrix(Failure Modes and Effects Analysis),complete
Green Belt Six Sigma training and currently Green Belt project leader
with cost saving expected to be around +0.5M.
. Specifications and codes such as ASME Sections (II, IX, VIII, B16.5,
B31.3, etc...), API STD, ACI 351.1R-99, etc...
. Site construction execution skills including process improvement,
Piping system, Mechanical, Pipe rack Steel Structural, Electrical and
Civil works.
. Provide support to plant during, start-up, optimizing operations,
troubleshooting, shut-down &maintenance.
. OSHA, Supports compliance with Process Safety Management including
Management of Change, Provides support as necessary to sustain
environmental compliance and improvements, Familiar with U.S. Army's
Corps of Engineers Safety and Health (Manual-EM 385-1-1).
. Expert in general Arabic linguistic, Middle East's cultural support,
translator &interpreter.
Professional experience
April 2011 to Nov. 2012
Project manager Ferro Corporation
Inc, Penn Yan, NY, 14527
Ferro Corporation Inc. of Penn Yan, NY designs manufactures and markets
chemicals, Report to Engineering Manager.
Responsibilities Include:
. Leading the projects management for current/new capital projects in
all activities such as coordination meetings when needed with company
management, all company's departments involve with the project,
suppliers & contractors, reviews, estimates the capital budgets and
approves change orders and notifies company management and other
affected personnel of all changes.
. Providing engineering and project management supports to the major
capital projects in progress; identify opportunities and initiate
capital fund appropriation requests (ARs), initiate MOC and other
essential documentation, deliver results by meeting established
metrics while being safe and using cost control.
. Setting up the detail engineering design of process documents &
drawings including preparation and remodeling of P&ID's),PFD's, Piping
isometric drawings, energy and materials balances, plot plan equipment
layouts, data sheet calculations, pipe lines sizing, fire and safety
equipment layouts, HAZOP study, piping &cables rack support, steel
structure platform, civil foundation. PLC and data logging.
. Create notifications, purchase requisitions which included estimation
and preparation of the bill of materials with the suitable
specifications and codes, initiate and manage contracts w/ outside
contractors/suppliers/customers, coordination and prepare accordingly
permits required, plan and format of deliveries.
. Maintain OSHA safety policies and programs at the job site, supports
compliance with Process Safety Management including Management of
Change, improve Safety culture by reducing the recordable accident
rate.
. Ensures that the processes are running according to approved
procedures and standards. Plans and executes process improvements on
assigned projects/processes.
. Plans and executes projects which reduce variability, increase yields,
optimize raw materials, reduce labor, reduce cycle times, reduce
energy consumption and reduce waste streams. Using Microsoft Project
for planning and tracking daily all resource requirements.
. Provide support to plant during commissioning, start-up, optimizing
operations, troubleshooting, shut-down &maintenance.
. Complete Green Belt Six Sigma training and currently Green Belt
project leader with cost saving expected to be around +0.5M.
. Identify, manage and execute equipment continuous improvement. Lean
manufacturing techniques to identify and reduce cost and working
capital. Provide manufacturing capacity, and cost, and lead time
analysis, and drive production project management.
Accomplishments Include:
. Effectively managed and implementation multi projects at the planning
schedule and budget.
. Finish KUKA Robotic System project for improving the operation
procedure and materials handling.
. Finish Improvement of Formulation process area project.
. Finish Formulation products packaging area Project included
implementation of new bottling & pails packaging machines.
April 2008 to June 2009
Site Manager H2Gen Innovation
Inc., Alexandria, VA, 22304
H2Gen Innovation Inc., of Alexandria, VA, designs, manufactures and markets
cost efficient on-site hydrogen generators and gas purification plants.
Site manager for H2 Purification project built in Kingdom Of Saudi Arabia
for a client called TASNEE (SPC SAUDI POLYOLEFINS COMPANY), Report to
Engineering Manager.
Responsibilities Include:
. Acts as the project manager's deputy in activities such as attended
all site construction coordination meetings with the client company
management when needed and with the design teams & contractors,
issuing and approves change orders for the job site activities.
. Involve with preparation and issuing final revisions of the basic
engineering design, providing support for setting up the detail
engineering design of process documents & drawings including
preparation and remodeling of P&ID's,BFD's,PFD's, UFD's,piping
isometric drawings, energy and materials balances, equipment layouts,
equipment data sheet calculations for typical unit operations and for
different plant's equipment (Heat exchangers, pumps, pressure vessels,
compressor, filters, etc.),valves calculation, pipe lines sizing,
Fire and safety equipment layouts, HAZOP study, piping &cables rack
support and civil foundation .
. Create notifications, purchase requisitions which included estimation
and preparation of the bill of materials with the suitable
specifications and codes, initiate and manage contracts w/ outside
contractors/suppliers/customers, coordination and prepare accordingly
permits required, plan and format of deliveries.
. Using Microsoft Project for planning and tracking daily all resource
requirements.
. Provide support to plant during commissioning, start-up, optimizing
operations, troubleshooting, shut-down &maintenance.
. Maintain OSHA safety policies and programs at the job site, Supports
compliance with Process Safety Management including Management of
Change, Comply with U.S. Army's Corps of Engineers Safety and Health
(Manual-EM 385-1-1).
. Keep up to date on the gas purification technology advances that
affect the client's facility.
Accomplishments Include:
. Effectively managed and implementation all project activities with
efficiently and profitable finishing under budget and turn over the
plant to the client and grew client satisfaction of quality of work
being produced.
June 2005 to July 2007
Deputy Program Manager
BERGER/URS, Baghdad, Iraq
Berger/URS joint venture both specialized in Management, Deputy Program
manager helping managing program of overall budget around $700M, Report to
Program Manager.
Responsibilities Include:
. Acts as the Program Manager in activities such as attended all
coordination meetings when needed, Develops, schedule and implements
the projects from feasibility analysis develop the statement of work,
estimates the capital budgets for the assigned project elements
,approves change orders and notifies project management and other
affected personnel of all changes, expedites distribution of action
items following discussion, monitoring progress to maintain those
schedules and budgets
. Prepares technical reports and documentation of project activities, to
Issue the ITB (Invitation to Bid), Create Notifications, Purchase
Requisitions which included Estimation and Preparation of the bill of
materials with the suitable Specifications and Codes, Initiate and
Manage Contracts w/ outside contractors/suppliers/customers,
Negotiation with vendors then sign the contracts, Coordination and
prepare accordingly permits required, plan and format of deliveries.
. Using Microsoft Project planning and tracking daily all resource
requirements.
. Maintain OSHA safety policies and programs, Comply with U.S. Army's
Corps of Engineers Safety and Health (Manual-EM 385-1-1).
Accomplishments Include:
. Effectively managed and implementation over 7 project codes activities
under budget and time &Turn over the projects to the clients and grew
client satisfaction of quality of work being produced.
June 2004 to June 2005
Deputy Safety Manager
Parsons, Baghdad, Iraq
Parsons specialized in Constructions, Deputy Safety manager helping
managing safety program for around 160 job sites, Report to Safety Manager.
Responsibilities Include:
. Maintain OSHA safety policies and programs at the job site. Supports
compliance with Process Safety Management including Management of
Change, Provides support as necessary to sustain environmental
compliance and improvements.
. Apply U.S. Army's Corps of Engineers Safety and Health (Manual-EM 385-
1-1) at the construction sites
. Determines appropriate Personal Protective Equipment (PPE) for all
hazardous environments.
. Monitor the effectiveness of the job accident investigation process,
and periodically prepares an audit report.
. Tracking daily the safety deficiency and completing job hazard
analysis at the construction site.
Accomplishments Include:
. Effectively managed around 160 job sites and maintain safe and health
environmental at the construction sites.
. Meet the company goal of reducing the recordable incidents to below 1
per year.
Oct. 1989 to June 2004 Project/Process Chemical
Engineer Ministry Of Industry-SIDCCO, TECHCORP Baghdad, Iraq
Work for the Ministry of Industry for its own companies SIDCCO & TECHCORP
which both specialized in chemical, Petrochemical and refineries projects.
Project/Process Chemical Engineer for Polyethylene (LLDPE & HDPE), Butene-
1, Refineries, Methanol, Renovations, Maintenance and rebuilt several
existing damaged plants and refineries, Report to Engineering Manager.
Responsibilities Include:
. Acts as the Project Manager's Deputy in activities such as attended
all site construction coordination meetings when needed with design
teams & contractors, reviews, estimates for capital budgets and
approves change orders and notifies project management and other
affected personnel of all changes.
. Worked closely with the licenser companies to receive the Final
Revisions of the Basic Engineering, Expert setting up the Detail
Engineering Design of Process Documents & Drawings including
preparation and remodeling of (P&ID's), (BFD's),(PFD's),
(UFD's),Piping Isometric Drawings, Energy and Materials Balances,
Preliminary Equipment Layouts, Equipment Data Sheet calculations for
typical unit operations and for different plant's Equipment (Heat
Exchangers, Pumps, Pressure Vessels, Compressor, Filters,
etc.),Valves calculation, Pipe lines seizing, Fire and Safety
Equipment Layouts, HAZOP, Piping &Cables Rack Support and Civil
Foundation .
. Create Notifications, Purchase Requisitions which included Estimation
and Preparation of the bill of materials with the suitable
Specifications and Codes, Initiate and Manage Contracts w/ outside
contractors/suppliers/customers, Coordination and prepare accordingly
permits required, plan and format of deliveries.
. Using Microsoft Project for planning and tracking daily all resource
requirements and Provide support to plant During Commissioning, Start-
Up, Optimizing Operations, Troubleshooting, Shut-Down &Maintenance.
. Maintain OSHA safety policies and programs at the job site, Supports
compliance with Process Safety Management including Management of
Change.
. Keep up to date on the Petrochemical & refining process technology
advances that affect the client's facility.
Accomplishments Include:
. Effectively managed and implementation multi projects at the planning
schedule and budget.
. Finish implements 3 refineries with capacity of 10,000 Barrel/Day.
. Finish implements Methanol plant with capacity of 40,000 Ton/Year.
education
Bachelor Degree in Chemical Engineering, University of Technology/Baghdad-
Iraq
Others:
. Language: Arabic. Iraqi(Native), English (Fluent)
. Driving License: - Holding American Driving License issued from NY
State with clean driving records.
. Currently Green Card Holder issued 08/29/2007; already start
Application for US Citizenship.