Post Job Free
Sign in

Construction Estimator / Quantity Surveyor

Location:
Edmonton, AB, Canada
Posted:
April 04, 2026

Contact this candidate

Resume:

Edmundante Bugayong

**** ****** *** **

Edmonton, Alberta, Canada T6W1J4

Cell no. 780-***-****, E-mail: ******.********@*****.***

Position for Construction Estimator/ Site Quantity Surveyor

Experience in large industrial project construction in Gas refineries, Offshore platform fabrication, Refurbishment of Jack-up Oil Rig, Fabrication of modular process plant, Fabrication of floating storage and offloading vessels and Construction of New Marine yard power sub-station in the United Arab Emirates, Trinidad and Canada.

Personal Profile:

A proactive result oriented and multi skilled Construction Estimator/ Site Quantity Surveyor with outstanding technical, organizational and world class credentials. Consistently demonstrates the highest standards of personal and professional integrity and has the credibility and diplomacy to influence at all levels. A creative and inspirational team leader with exceptional communication and interpersonal skills. Proven ability to think and work independently and capable of operating accurately under pressure to deadlines. Exhibit a remarkable depth of knowledge and expertise in various disciplines.

Education:

Bachelor of Science Degree in Electrical Engineering, Philippines-1989

Central Colleges of the Philippines

Canadian World Educational Services (WES) equivalency: Bachelor’s Degree (four years)

Authenticated in the United Arab Emirates: Engineering Bachelor’s Degree

National Electrical Code 1&2 at Northern Alberta Institute of Technology (NAIT)

Electrical Estimating at NAIT

5TH Class Power Engineering at NAIT

Software training & references:

Sound knowledge of computer software in Excel, Word, Power Point, Access, Adobe, and Navis Work

Able to open and red line mark up through Auto Cad.

Knowledge in updating daily score card and J-plus reporting.

Capital cost estimator Aspen Tech (formerly K-Base), In-plant cost estimator (IPM)

Application of RS Means and Richardson estimate contingency references.

Working knowledge of American Bureau of Shipping (ABS) for the refurbishment of jack-up rig.

Well verse in using unit rate base on Marine Construction Standard Estimate-SBUM table.

Organization:

Association for the Advancement of Cost Engineering International (AACEI member)

Work Experience:

Installation and Commissioning/Lead Hand

United Safety Ltd.

Fort Saskatchewan, AB

Feb 2022 to Present

Project-based and project-specific for the turnaround season.

Monitor the health and safety of workers within a confined space.

Project:

●Canadian Natural Resources Ltd (CNRL)- Jackfish Site, AB

●Nova Chemical Heartland-Jeoffre, AB

●Heartland Generation Ltd, Sheerness, AB

●TransAlta Generation- Keephills, AB

●Repsol Energy Company- Edson, AB

Load Out Checker

HWT- Siemens Group

Edmonton, AB, Canada

June 2017 to March 2021

Inspecting of skids being loaded to match picking documents.

Professional representation of the company at the customer site.

Project:

●Exxon Mobil, Edmonton Distribution Center, AB

Site Quantity Surveyor

Technip FMC – external

Trinidad, West Indies

February 2016 to February 2017

Member of project management team and direct reporting to the site project manager.

Review guidelines between subcontractors and owner contract for the derivation of new unit rates.

Work closely with the senior scheduler to monitor schedule performance and cost trends.

Regular site visit and verify actual installed equipment and structures as per contract schedule.

Review Variation Request for contractual entitlement but not limited to structural, piping and E&I discipline.

Review subcontractor’s payment applications were valid including timesheet review and approval.

Attend weekly virtual change order and variation updates; and reporting.

Project:

●British Petroleum Juniper platform EPCI project 5100t, topsides

Construction Estimator

CESSCO Fabrication & Engineering Ltd

Edmonton, AB, Canada

June 2015 to February 2016

Review the scope of work, read specifications, addendum, and comment.

Responsible for detailed quantities piping take-off (MTO) and man-hours as per area work scope.

Prepare MS project schedule and estimate base memorandum.

Prepare price breakdown for the commercial offer for submission

Project:

●Suncor Energy - Fort Hills Cogen Project

●Suncor Energy - Coke conveyor steam heater piping replacement

Cost Estimator

CoSyn Technology – A Business Unit of Worley Parsons Canada.

Edmonton, AB, Canada

October 2008 to March 2015

Participate in review design scope criteria and integrates them into the estimates.

Prepare quantity takeoff when not available from the Discipline Engineering.

Utilized Company Work Breakdown Structure (WBS) in the development of TIC estimates.

Send out budgetary pricing inquiries and regular pricing database record updates.

Provide pricing and man-hour of the estimating template base quotation received as required.

Actively participates in contingency discussions and recommendations (internal & client).

Prepare Estimate Base Memorandum patterned to Engineering Work Packages (EWP).

Conduct estimate peer review and development of benchmarking data.

Prepare monthly key quantity tracking update between Front End Engineering Design.

Support other estimators performing detail quantity take-off and man-hours.

Support the project control department monitoring the manpower status update.

Projects:

●Froth Pipeline Replacement Project, Order of Magnitude Estimate, nine (9) options

●Tailing Transfer to South West in Pit Pond, Stg 4, TIC: $70m

●Plant 37 VDU Bottom Quench, Stg 3, TIC: $30m

●Tailing Relocation to North Mine South Pit West, Stg 3, $598m

●Mildred Lake Replacement of Bunkhouses, Stg 2, TIC: $118m

Senior E&I Quantity Surveyor

Jay Ray McDermott Middle East Inc.

United Arab Emirates

January 2007 to August 2008

Member of the project management group assigned for preparation of E&I variation request submittal.

Perform the cost estimating analysis & control activities and liaise directly with the client for change order preparation.

Prepare tabulation and calculation for additional unit rates for client approval.

Responsible for proposal provisions related to cost engineering and supporting data for the contract.

Review time sheets related to Time & Material change order.

Project:

●Saudi Aramco Long Term Agreement (LTA); Location: Berri, Marian, Zuluf, Karan and Safaniyah Oil Fields, Off-shore, Saudi Arabia; Scope includes jackets, decks, pipelines and cables.

●Fabrication, transportation and installation of production platform (maintain potential facilities, 16 decks); Location: Safaniya, Marian, Zuluf and Berri Oil fields, Off-shore, Saudi Arabia; Company: Saudi Aramco; Scope includes jackets, decks, pipelines and cables

Senior Construction Engineer / E&I Est/QS

Maritime Industrial Services (MIS)

United Arab Emirates

March 2001 to January 2007

Supervise/ coordinate E&I work activities with assigned staff.

Work package submittal, review fabrication drawings, specification, and addendum.

Review P&ID, cause, and effect, plan and elevation, single line, cable schedule, specification and vendor drawing.

Prepare estimate and submittal for Navigation Aid, Fire Alarm, CCTV, PA/GA, and Telephone system.

Site survey and prepare an estimate for the gas plant refurbishment.

Project:

●Refurbishment of jack-up rig Alborz- Maersk

●Inlet compression project- Margham Dubai Establishment

●Floating storage & offloading barge -Single Buoy Mooring Inc./ Petronas

●Maritime Industrial Services fabrication yard gantry cranes

●New Maritime Industrial Services marine yard power substation no. 26

MEP Quantity Surveyor

Sept. 1999 to Jan. 2001

Drake & Scull International (DSI)

Tourist Club, Abu Dhabi, UAE

Prepare monthly billing applications and invoices as per the progress tracking system.

Measure and record man-hours incurred for construction work.

Review major construction costs at critical stages including sub-contractor selection,

price negotiations, and claims resolution.

Site visit/ re-measure work scope.

Responsible for personnel safety and safe working practices.

Project:

●Ruwais Housing Complex Infrastructure

●HVAC ducting contractor in the Abu Dhabi Area.

Estimator – Material Take Off

Sept. 1994 to Mar. 1999

J. Ray McDermott Middle East Inc.

Dubai, UAE

Responsible for the detailed quantity take-off (MTO) & labor man-hour for the electrical and instrumentation cables and cable ladder/tray.

Responsible for the MTO and labor rate for the erection of control valves, field instruments, mounting supports, and tubing.

Responsible for the detailed MTO and erection man-hours for heat tracing tubing/cable.

Responsible for the detailed MTO for Fire and Gas System, Telecommunication System, Navigational Aid System, Cathodic protection and Earthing system.

Responsible for the detailed MTO and labor man-hours of piping shop fabrication, field installed, offshore installed spools, erection of control valves, bolt-up, pipe supports, the total number of joints required, stress relief, pre-heat & hydro testing

Support the procurement group and proposals function to solicit accurate and timely proposals from material suppliers, equipment vendors, and sub-contractors.

Project:

Qatar Gas Offshore Platform

Iranian Offshore Oil Company Offshore Platform

Saudi Aramco Post Drilling Module

Hook-Up Electrician

Jan 1992 to Sept 1994

J. Ray McDermott Middle East Inc.

Dubai, UAE

Assigned for cable installation, glanding and termination.

Assigned for the installation of Distribution board, cable tray and support.

Responsible for loop checking and red line mark-up.

Clear-up punch list items.

Project:

Offshore Complex projects

Safety Training:

CSO, CSTS-2020, WHMIS 2015 & H2SALIVE, Confine Space Entry & Monitor, First Aid & CPR/AED & Defensive Driving

SOLAS, Banksman, Fall protection & Portable Extinguisher



Contact this candidate