Personal Information:
Name: Yan Han Gender: Male
Birth Date: January 29th, 1982 Marital Status Married
Mobile: 151******** Email: **********@***.***
Education:
Time Period:2000/9--2004/7
School: Huazhong University of Science and Technology
Major: Chemical Engineering and Technology
Degree: Bachelor
PROCESS EXPERIENCE:
2024/3- Present BASF Integrated Site(Guangdong) Co.Ltd
2024/3- Present Solution Integration Operations Manager
Collect user cases from operation, site development team, etc for Verbund simulation and optimization
Transparency project
1.Coordinate PM operation and site digitalization for operation dashboard
2.Design and coordinate for site KPI transparency
3.Develop site material overview PI Vision graphics for CSMT team
2.Develop Metering Dispute Dashboard with Power BI for transparency
Update and utilize BASF SiteMod model for difference scenarios simulation to predict site commissioning mass balance
2012/08- 2024/3 Dow Zhangjiagang (Dow Performance Silicon)
2021/11 – 2024/3 Me2Vi Expansion Project ManRep (2/20/2023 – 2024/3 IVF Run Plant Engineer meanwhile)
As Me2Vi Expansion Project ManRep -
Work with TES team to ensure the MET and TechCenter technology are implemented in the project;
1.Weekly meeting with TechCenter and TES process engineer to review and discuss the MET and process design;
2.Weekly meeting and catchup as needed with TES disciplined engineers to ensure the design;
Work with CDI to ensure the design meet TechCenter and Production expectation.
1.Clarify the design to CDI;
2.Involved in 30%/60%/90% model review to ensure it meet operation and maintenance needs;
Collect feedback from operation and forward to design team.
As IVF Run Plant Engineer –
1.Involved in/Lead RCI, daily trouble shooting, support daily production and maintenance;
2.Lead a 10 cst project;
2017/09 – 2021/10/31 Sr. Improvement Engineer
1. Analyze unplanned losses to identify opportunities for improvement.
2. Work with Run Plant Engineer to set reliability and productivity goals for Phoenix/TCS/Grinder processes
3. Manage PSTP project portfolio and keep it up-to date to ensure projects are well communicated with stakeholders.
4. As Project Manager & Man Rep to implement the following projects:
Phoenix reactor blowdown line upgrade, 1104 Bucket Elevator improvement, ZJG MCDS Feed Capacity Upgrade, Grinder Ball mill seal improvement, MCDS OVHD re-distillation project (TC & WRAP Award), SIS logic solver redundancy, PA+ project, etc.
5. Provide timely support on trouble shooting and work as back up to RPEs if needed.
6. Work with RPE to run TCS with high reliability to meet HDK demand.
7. Facilitate Monthly Process Improvement meeting.
2016/10 – 2017/09 Plant Process Control Coordinator
Involved in automation PCRs and trouble shooting
2014/10 – 2016/09 Process Engineer
Team member “Me-Me2 column debottleneck project” - Use Aspen plus to simulate Me/Me2 column
Lead Engineer “Olefin & Chlorocarbon reduction in pure Me3 project” - Collect and analyze history data, find the root cause and solution, and update the SOP.
Lead Engineer “Long-term process equipment performance monitoring project” - Collect VOC(Voice of customer), design and build the monitoring interface in PI system
Lead Engineer “TCS 7020 life extend to 24-month project” - Collect and analyze history data, find the root cause with brain storming, update SOP
Lead Engineer of “PAC blending project” - Estimate the financial benefit; Equipment specification; Design control scheme; Update P&ID; Organize HAZOP study; Write commissioning SOP, and lead commissioning.
Lead Engineer “TCS DPR co-quench project” - Estimate the financial benefit; Work with EHSS engineer and lab; Equipment specification; Design control scheme; Update P&ID.
2012/08 – 2014/09 Simulation Engineer
Use Arena to find the plant bottleneck based on reliability probability distributions, unit operation logics, etc.
Use Aspen Plus to find the optimized operation condition.
2007/03- 2012/08 Honeywell Advanced Solutions, GES Chongqing, China
Project Experience:
As lead engineer, Build the Dynamic UniSim Design model for PLL LNG Unit in India, and link the model to FOD station. Conduct MAT/FAT/SAT with customer
As lead engineer, Build Steady state and dynamic UniSim Design model for Ningxia Coal ASU unit, translate EPKS R310 database, and link the model to the DCS system for Ningxia Coal ASU project, EPKS database debug, interface graphic update.
As lead engineer, Translate the TPS database, modify the UniSim Design process model. Link the model to USO R310 with database’s output file. Build updated logic similar as TPS for furnace control and ESD for Showa Yokkaichi SRU project.
As modelling consultant, participate in the KOC Booster Station 131 Project. Build parts of the dynamic UniSim Design model.
As integration consultant, Translate EPKS R310 and Triconex ESD database, link the EPKS R310 to the model for Ningxia Coal Gas OTS project, EPKS database debug, interface graphic update.
As application engineer, assist the leader engineer to update the UniSim Design process model for FAT for Shanghai LNG terminal OTS project.
As application Engineer, Link the model to EPKS R310 with SM for GTL OTS project
As application engineer, Assist project leader engineer to prepare new DCS database and update the relevant process model of EOEG, LOP and BDE unit accordingly for CSPC update OTS project.
As application engineer, Participate in development of steady state of UniSim Design dynamic model of ASU Unit; link the model to the Honeywell TPS system for Datang OTS project.
PRIOR EXPERIENCE:
2004-2006 PetroChina Dalian petrochemical company, Dalian, China
Assistant Engineer (KHDS Unit):
Participate in develop RTG for Dalian KHDS OTS project, and try to build KHDS steady state model and dynamic model with UniSim Design
Be familiar with CDU, KHDS, SRU process and participate in the start-up of CDU
Be familiar with FCC unit, do the field operation
SKILLS:
Good command of english both in oral and written (CET-6)
Japanese level 2, fluent in oral communication, reading and writing
Be familiar with Word/Excel/PowerPoint