CURICULUM VITAE
Name : Salis Nadir
Permanent Address : Jl. Delima No 40 Kaumrejo Ngantang Malang
Present Address : Bukit cemara tujuh GG 11 Malang Indonesia Date& place of Birth : 06.04.1973, Malang
Status : Married, with 2 children
Education : Diploma-3 in electrical engineering from Polytechnic Brawijaya University Malang
Jawa Timur Indonesia.
Telephone : +628**********
Email : **********@*****.***
Experience
1. March 2023 to present
Joint with Brunei Fertilizer Industries as Electrical shift supervisor with responsible for Maintenance. Trouble shooting & operations of STG. EDG, GIS switch gear, Transformer, Motor. Ups. VSD.
Commissioning new GIS switch gears & transformer for new 66 KV incoming.
Participate Major shutdown ammonia, urea & utility plant
Revamping new RMU for BFI non plant area
2. December 2020 to march 2023
Transfer to Qg south Train 1,2,6,7 & helium plant with main duty:
-. Carried Isolation, de isolation, load maneuvering for VSD, UPS, Batteries charger, switch gears at 400 V, 6.6 KV & 33 KV.
-. Carried day to day electrical maintenance activity & corrective maintenance for Train 1, 2.6.7 & helium plant (UPS, MOV, Switchgears, transformer & motor)
-. Carried PM Mega VSD at train 6 & 7
-. Participation of major shutdown train 1.2.5, AKG & train 6 2.june 2017 to December 2020
joint with Qatar gas as senior electrical technician-. Carried day to day electrical maintenance activity for RLTO:
-. Carried Isolation, de isolation, load maneuvering Procedure for UPS, Batteries charger, switch gears at 400 V, 6.6 KV & 33 KV.
-. Carried day to day electrical maintenance activity & corrective maintenance for tank farm area, CLPG area(UPS, MOV, Switchgears, transformer & motor).
-. Record all Activity (PM & CM) at SAP software.
3. June 2012 to June 2017
Joint with ADCO (Abu Dhabi on shore company) joint operations of ADNOC & TOTAL, as electrical foreman with responsible:
-. Carried day to day electrical maintenance activity for oil plant RDS (remote degassing system) &CDS (central degassing system), well head, ESP skid & oil station pump, gas lift well stations & gas flare system.
-. Revamping & Commissioning LV switch gear for remote degassing stations
-. Assist contractor to commission new freshwater tank, new UPS, ESP skid & new manifold stations.
-. Upgrade control system for emergency diesel generator at remote degassing system.
-. Prepare critical material list & checked of availability at system 4. February 2011 to may 2012
Joint with PT Kaltim nitrate Indonesia (subsidiary of ORICA mining service Australia) as Electrical reliability senior tech, with responsible:
-. Review all constructions job as per safety procedure.
-. Developed standard operations procedure & work instructions for ABB 11KV Switch gear, 690V & 400 V siemens SIVACON MCC, ABB variable speed Drive, Emergency diesel, UPS, transformers & emergency lighting.
-. Support commissioning time during project.
-. Prepare inventory for 2 years spare part.
5. From 2002 to January 2011.
Joint with QAFCO (a subsidiary Qatar petroleum) as Electrical technician, with main jobs carry on maintenance 7 x 11 Mw Avon Gas generator, 1 x 35 MW GE MS 6001 B, 66KV ZX 1 & LMK -1,11 KV, 3,3 KV Switch Gear ABB, 415 V MCC, Various Transformer from 0,75 MVA until 125 MVA, Battery Charger, Emergency Diesel 2 x 3 MVA Wartsila 3,3 KV, And 11 KV motor. Some of the major & shutdown projects associated are:
*. Upgrading Transformer And 415 V Switch Board electro chlorination
& nitrogen plant
*. Shutdown & Major Overhaul GE frame 6 Gas Turbine.
*. Modification Control system for Avon Gas generator.
*. Revamping 11 KV switch Gear from oil circuit breaker to VCB
*. Erection & commissioning 11 KV QAFAC CO 2 compressor.
*. Upgrade control MS 6001 B from mark V to Mark 6 i
*. Revamp transformer distributions at QAFCO 1 & 2
*. Revamp 3,3 KV switch gears from contactor to VCB 6. From 1996 to 2002
Fresh graduate training at electrical section PT. Polysindo Eka Perkasa Karawang (Petrochemical Company)
From 1996 to 1997
junior supervisor at PT Polysindo Eka Perkasa Karawang, with responsible at PTA(pure terephthalic acid) Plant Project & commissioning Motors 400 V, 3,3 KV11 KV, Heat tracing system, MCC panels, Normal and Emergency illumination system.
From 1997 to 1998
Transferred to Power station & Utility electrical section with respond: commissioning wash waste Treatment project, Maintenance for Chiller plant, Gas generator ABB GT 10 & Mitsubishi MF 111, Heat recovery steam Generator
(HRSG), Demin plant, cooling water plant, Compressor, 20 KV Alstom switch gear, 11 KV & 3,3 KV fluar 200 MG, 420 V Siemens MCC, PMCC & PCC, Battery Charger, Transformer, Motor, Lighting system, Emergency diesel Generator.
Course & Training :
*. Management supervisory training.
*. Nelson heat tracing, installation and maintenance trouble Shooting course.
*. Merlin Gerin 11 KV and 3,3 KV maintenance and trouble Shooting course.
*. Siemens MCC & PCC 415 V maintenance and trouble Shooting course.
*. ABB GT 10 operations, maintenance and trouble
Shooting course.
*. Siemens PCS 7 dcs operations training course.
*. Advance first aid course by industrial consultant service
*. Confine space entry course by industrial consultant service
(Pt IKS)
*. Emergency renspon team by PT industrialindo consultant Service.
*. Sertifikasi teknisi listrik dari DESNAKER.
*. PPM procedure picture map by TALSICO
*. Caterpillar Acert 32 operation & maintenance diesel generator.
*. Root cost analysis training course.
*. Gas test course
*. Medium voltage, variable speed drive & generator
*. Motor signature analysis
*. Basic first aider