Post Job Free
Sign in

Boiler Operator

Location:
Mangaluru, Karnataka, India
Salary:
As per my skills
Posted:
February 13, 2026

Contact this candidate

Resume:

Resume

Name: Mahesh S. Bhosale

Mob. No.727-***-****

Email ID: ***.********@*****.***

Designation: Utilities Supervisor-First Class

Boiler Attendant

I have almost 15 years of Experience in Boiler & Utilities Operation & Maintenance as a 1st Class Boiler Attendant (Supervisor)

Name : Mahesh Bhosale

Father’s Name : Shahaji Bhosale

Date of Birth : 09/02/1987

Native Place : Akluj, Yeshwant Nagar, Tal. Malshiras, Dist. Solapur. State : India Maharashtra – 413118

Gender : Male

Marital Status : Married

Language Known : English, Marathi, Hindi, and Gujarati Degree Board Year of Passing Percentage

Diploma In

Mechanical

Engineering

National Institute of

Technical and Management

Studies

(NITMS Nagpur)

2019 Passed

A Grade

First Class Boiler

Attendant

Govt. Of Maharashtra

Mumbai Board

2023 Passed

Second Class

Boiler Attendant

Govt. Of Maharashtra

Mumbai Board

2014 Passed

I.T.I Govt. Of Maharashtra

Mumbai Board

2006 70%

S.S.C M.S.M.P. School, Pune Board 2004 54.13%

Company Name Type of Boiler Working Pressure Load Capacity Thermax Smoke Tube

(Piped Natural Gas Fired)

10.54 Kg/cm2 3.0 Ton/Hr.

Thermax Smoke Tube

(Briquette Fired)

10.54 Kg/cm2 6.0 Ton/Hr.

Siller (IAEC) Smoke Tube

(Furnace Oil Fired)

10.54 Kg/cm2 10.0 Ton/Hr.

I.B.L. Ltd. Water Tube F.B.C.

(Coal Fired)

10.54 Kg/cm2 14.0 Ton/Hr.

Objective:

Personal Details:

Academic Qualification:

Work Experience:

Currently Working:

Catasynth Specialty Chemicals Pvt Ltd. (Anthea Group) Mangalore as a Supervisor [Utility] Thermax Boiler 10.0 Ton/Hr. & Forbes Marshal 4.0 Ton/Hr. HFO/PNG Fired Boiler, & Thermic Excel (TFH) 15 Lac kcal/hr. with Voltas-Brine chiller & water chiller, Air Compressor, Cooling Tower, & plant condensate recovery system operation & maintenance. Job Profile:

Piped Natural Gas Fired 3.0 Ton/Hr. Boiler Operation and Maintenance.

Briquette Fired – 6.0 Ton/Hr. Boiler Operation and Maintenance.

Furnace Oil Fired – 10.0 Ton/Hr. Boiler Operation and Maintenance.

FBC Coal Fired (Lignite) 14.0 Ton/Hr. Boiler Operation and Maintenance.

CFBC Coal Fired 260 Ton/Hr. Boiler Operation and Maintenance.

Water Softener Plant 10 M3/Hr. Operation.

Chilling Plants (Water & Brine) Compressor Voltas & Blue Star Make Operation.

Vapor Compression Cycle Chiller System Including,

1) -25 Dec. – 100 TR Systems, System and Component.

2) -10 Dec. – 40 TR System, system and component

Air Compressors (Reciprocating & Screw type) Having cap.477 CFM to MAKE; - ATLAS COPCO.

Nitrogen Generation plants Having cap.275 Normal Cubic Meter/ hr.

Cooling towers & Heat Exchangers.

Water System – Water Pre-treatment & RO System.

Cipla Pharmaceutical Ltd.: Thermax & Forbs Marshal Boiler – 3.0 Ton/Hr. Gas Fired (PNG) Combipack-8 Ton/Hr. Boiler at Mumbai Sr. Executive Boiler Operation & Maintenance from 25/06/2020 to 19/08/2025.

Emcure Pharma Ltd.: Forbes Marshalls Boiler – 1.5 Ton/Hr. Furnace Oil Fired Boiler Pune Technical Assistant Boiler Operation

& Maintenance from 25/12/2017 to 29/01/2020.

Wockhardt Pharma Ltd.: Thermax Briquette Fired 6.0 Ton Boiler & Furnace Oil Fired Boiler 10.0 Ton/Hr. Aurangabad from 17/12/2015 to 15/12/2017 and Jr. Assistant Boiler Operation & Maintenance.

Asian Paints Limited: Shrivel Pune Thermax 3.0 Ton/Hr. Smoke Tube Diesel Fired Boiler Operation & Maintenance from 15/06/2015 to 15/12/2015 as Sr. Technician.

Sanghi Industries Ltd.: FBC Boiler – Coal Fired Boiler Capacity 14 Ton/Hr Steam Pressure: 10.54 Kg/cm2, Steam Temp: 186*C. Feed Water Temp: 95*C, Make: IBL Vapi Gujarat

Type: CFBC Boiler Coal fired 1*63 mw 260 TPH Thermal Power Plant, Boiler Operation & Maintenance from 01/11/2011 to 06/05/2015 I hereby state that the above information provided by me in the resume is true and authentic to the best of my knowledge.

Thanks,

Mahesh Bhosale

Previous Experience:



Contact this candidate