Resume
Name: Mahesh S. Bhosale
Mob. No.727-***-****
Email ID: ***.********@*****.***
Designation: Utilities Supervisor-First Class
Boiler Attendant
I have almost 15 years of Experience in Boiler & Utilities Operation & Maintenance as a 1st Class Boiler Attendant (Supervisor)
Name : Mahesh Bhosale
Father’s Name : Shahaji Bhosale
Date of Birth : 09/02/1987
Native Place : Akluj, Yeshwant Nagar, Tal. Malshiras, Dist. Solapur. State : India Maharashtra – 413118
Gender : Male
Marital Status : Married
Language Known : English, Marathi, Hindi, and Gujarati Degree Board Year of Passing Percentage
Diploma In
Mechanical
Engineering
National Institute of
Technical and Management
Studies
(NITMS Nagpur)
2019 Passed
A Grade
First Class Boiler
Attendant
Govt. Of Maharashtra
Mumbai Board
2023 Passed
Second Class
Boiler Attendant
Govt. Of Maharashtra
Mumbai Board
2014 Passed
I.T.I Govt. Of Maharashtra
Mumbai Board
2006 70%
S.S.C M.S.M.P. School, Pune Board 2004 54.13%
Company Name Type of Boiler Working Pressure Load Capacity Thermax Smoke Tube
(Piped Natural Gas Fired)
10.54 Kg/cm2 3.0 Ton/Hr.
Thermax Smoke Tube
(Briquette Fired)
10.54 Kg/cm2 6.0 Ton/Hr.
Siller (IAEC) Smoke Tube
(Furnace Oil Fired)
10.54 Kg/cm2 10.0 Ton/Hr.
I.B.L. Ltd. Water Tube F.B.C.
(Coal Fired)
10.54 Kg/cm2 14.0 Ton/Hr.
Objective:
Personal Details:
Academic Qualification:
Work Experience:
Currently Working:
Catasynth Specialty Chemicals Pvt Ltd. (Anthea Group) Mangalore as a Supervisor [Utility] Thermax Boiler 10.0 Ton/Hr. & Forbes Marshal 4.0 Ton/Hr. HFO/PNG Fired Boiler, & Thermic Excel (TFH) 15 Lac kcal/hr. with Voltas-Brine chiller & water chiller, Air Compressor, Cooling Tower, & plant condensate recovery system operation & maintenance. Job Profile:
Piped Natural Gas Fired 3.0 Ton/Hr. Boiler Operation and Maintenance.
Briquette Fired – 6.0 Ton/Hr. Boiler Operation and Maintenance.
Furnace Oil Fired – 10.0 Ton/Hr. Boiler Operation and Maintenance.
FBC Coal Fired (Lignite) 14.0 Ton/Hr. Boiler Operation and Maintenance.
CFBC Coal Fired 260 Ton/Hr. Boiler Operation and Maintenance.
Water Softener Plant 10 M3/Hr. Operation.
Chilling Plants (Water & Brine) Compressor Voltas & Blue Star Make Operation.
Vapor Compression Cycle Chiller System Including,
1) -25 Dec. – 100 TR Systems, System and Component.
2) -10 Dec. – 40 TR System, system and component
Air Compressors (Reciprocating & Screw type) Having cap.477 CFM to MAKE; - ATLAS COPCO.
Nitrogen Generation plants Having cap.275 Normal Cubic Meter/ hr.
Cooling towers & Heat Exchangers.
Water System – Water Pre-treatment & RO System.
Cipla Pharmaceutical Ltd.: Thermax & Forbs Marshal Boiler – 3.0 Ton/Hr. Gas Fired (PNG) Combipack-8 Ton/Hr. Boiler at Mumbai Sr. Executive Boiler Operation & Maintenance from 25/06/2020 to 19/08/2025.
Emcure Pharma Ltd.: Forbes Marshalls Boiler – 1.5 Ton/Hr. Furnace Oil Fired Boiler Pune Technical Assistant Boiler Operation
& Maintenance from 25/12/2017 to 29/01/2020.
Wockhardt Pharma Ltd.: Thermax Briquette Fired 6.0 Ton Boiler & Furnace Oil Fired Boiler 10.0 Ton/Hr. Aurangabad from 17/12/2015 to 15/12/2017 and Jr. Assistant Boiler Operation & Maintenance.
Asian Paints Limited: Shrivel Pune Thermax 3.0 Ton/Hr. Smoke Tube Diesel Fired Boiler Operation & Maintenance from 15/06/2015 to 15/12/2015 as Sr. Technician.
Sanghi Industries Ltd.: FBC Boiler – Coal Fired Boiler Capacity 14 Ton/Hr Steam Pressure: 10.54 Kg/cm2, Steam Temp: 186*C. Feed Water Temp: 95*C, Make: IBL Vapi Gujarat
Type: CFBC Boiler Coal fired 1*63 mw 260 TPH Thermal Power Plant, Boiler Operation & Maintenance from 01/11/2011 to 06/05/2015 I hereby state that the above information provided by me in the resume is true and authentic to the best of my knowledge.
Thanks,
Mahesh Bhosale
Previous Experience: