Post Job Free
Sign in

Electrical Engineer Engineering

Location:
Rawalpindi, Punjab, Pakistan
Posted:
November 06, 2025

Contact this candidate

Resume:

AYAZ KHAN

Mobile/whtsapp (PAK): +923*********

Mobile (PAK): +923*********

Email: *********@*****.***

Objective

An engineering position in an organization that offers the opportunity to utilize my expertise in designing and implementation of different electrical systems to the required quality standards.

Knowledge / Experience

Professional success in the field of electrical engineering whereby fast track professional success in designing and installation of Solar Energy Production Plants, development of technology strategies and policies.

Electrical vehicles (buses, cars, cuties), Diverse background includes knowledge of standard Specifications, Codes (NFPA, NES, NEMA, ANSI / IEEE, IEC, UL etc).

Mostly building & industrial equipment, low / medium voltage systems, low current systems, power electronics equipment (variable speed drives, UPS, converters etc), and seamless integration of emerging technologies in a large user community.

Knowledge Control and operational of L.T and H.T panels, ACBs, MCCBs, VCBs, MCBs, Main distribution system, KIOSK substation, AMF panel, Air field Lighting System, Current Controlled Reactors, Road Lighting Control panel with Timer setting.

17 Years of experience in electrical power source and Generation line/equipment, Solar System designing / planning and installation.

Duties and Responsibilities in Unique Green Solutions (Pvt) Ltd

(01-08- 2021 to 30-09-2024) 3 years

Provide full time consultancy with Eura Buses (Germany Buses) Project under Unique Green Solutions Company in Pakistan

All equipment of Buses including lithium batteries’ motors compressor air condition BMS (batteries managing system) signal box Completely removed, reassembled and setup.

Review concept, shop, co-ordination on buses efficiency

Daily checkup of Electric Buses, spare parts etc

Progress report of buses running

Meeting with official who award to our company contract

Review of progress percentage of mechanical, technical, repair, consumption of electric energy

Review of progress Lithium Batteries consumption use in Buses.

Integrated Well Service Solution oil well service International company (IWSS) Islamabad Pakistan (01-02-2014 to 30-07-2021) 8 years

Quale Tubing/Cementing Units

Re-condition of Expulsion proof (Zone II) AC electric Wiring for on C pump Combu Unite Nitrogen Pump Bach 50 mixer plants Power Pack Generator sets up to 250kva.

Re-condition of Expulsion proof (Zone II) DC electric Wiring on C pump Combu Unite Nitrogen Pump Bach 50mixer plants Power Pack Generator sets up to 250kva Daily checkup of Electric Buses, spare parts etc

Progress report of the above equipment and machines.

Meeting with Operation Manager Engineer and Operators how to remove faults during the Job.

Controlled fuel consumption of engine and their progress percentage of mechanical, technical, repair,

Review progress of the tools which improve Job Quality

Duties and Responsibilities in Contract International Construction Company

(01-02-2008 to 01-01-2014) 6 years

Detail design of Medium voltage (MV) / Low voltage (LV) Underground system for Melting Furnace, Quenching Furnace and Vacuum Arc Furnace. & Industrial infrastructure (voltage level from 11 KV – 0.415 KV)

Control and operational of L.T and H.T panels, ACBs, MCCBs, VCBs, MCBs, Main distribution system, KIOSK substation, AMF panel, Air field Lighting System, Current Controlled Reactors, Road Lighting Control panel with Timer setting.

Detail design of indoor and outdoor illumination, conceptual level design, review of schematics and shop drawings submitted to consultant for fire alarm and detection system, communication system (convential PABX & IP-PABX), CCTV system, cable TV system etc.

Preparation of Tender document, Bill of Quantities, Cost estimates & Unit rate analysis.

Architecture layouts for residential, commercial & industrial buildings

Complete checking of the shop drawings before implementation at site.

Coordination with the suppliers for the quotations.

Co-ordination of electrical design with HVAC, plumbing, structures and complete installation of the electrical systems right from the laying of the conduits inside the roof slab till its termination.

Testing commissioning of switchgear and panels

Testing of cable using MAGGER devices

Installation of Generator sets at BTS and BSC sites up 300kva

Coordination with deferent team of engineers at sites

Earthing and lightning arrester protection device of masts

The systems under my scope are: -

Lighting conduits, wiring and fixtures

Power conduits under the floor slab and it’s wiring

Telephone conduits and its wiring

Data conduits and wiring

CCTV system

Fire Alarm System

Fire Smoke Deduction System

Security sincere System

Public Address System

Main Galvanized Cables trays Installation

Generators and transformers

Building Management System (B.M.S)

Total load calculation

Responsible for the execution of all electrical works at Project

Responsibilities

Processing the field inspection requite and hence its approval from consultant

Making shop drawing as well as built drawing where required

Complete coordination with all other departments for pushing electrical works

Arranging technical worker, skilled labors, material in order to achieve the required tasks

Weekly meeting with Project Manager regarding site issue

Arranging monthly invoice for the subcontractors

Daily meeting with consultants regarding electrical works at site

Load calculation of daily electrical consumption energy

Computer Skills

AutoCAD

MS Office (word Power point Project, Excel etc.)

Internet Browsing

Electronic work bench

Education

Master of Electrical Engineering

Bachelor of Technology in Electrical Engineering (Power) from University of Engineering and Technology Peshawar Pakistan.

Professional Affiliation

Member of Pakistan Technology council (Elect /NTC-34472)



Contact this candidate