RESUME
NAME : C. NAGARAJ.
PERMANENT ADDRESS : New No.13 Old No.33
Sixteenth Cross Street
New Colony Chromepet
CHENNAI- 600 044
E-mail-1: *********@*******.***
E-mail-2: *********@*****.***
1. DATE OF BIRTH & AGE : 2nd March 1969 & 56 Years 2. SEX : Male
3. MARITAL STATUS : Married
4. NATIONALITY / RELIGION : Indian / Hindu
5. PASSPORT PARTICULARS : W0988394
6. FATHER’S NAME : L. Chellappan.
7. EDUCATIONAL QUALIFICATIONS:
Examination University or Board Marks and Grade Year of Passing B.E. (Civil
Engineering.)
Madras University – Chennai
Tamilnadu
60.79% I Class April 1990
HSC Board For Higher Secondary Education
Tamilnadu
69.50% I Class April 1986
SSLC Board For Secondary Education
Tamilnadu
73.00% I Class April 1984
· Job Responsibilities are as under :
a. Baseline schedule preparation for tender submission b. Detailed program schedule involving itemisation breakdown of the contract scope of work into basic measurable quantities on the basis of user defined Work Breakdown Structure c. Reviewing sub-contractors construction schedule d. Monitoring resources schedule and Cash Flow Curve e. Preparation of progress reports (weekly and monthly) for client and senior management f. Preparation, review and updation of Project Planning and Deployment of Equipment, Construction material and Manpower at Project-sites. g. Monitoring the Project progress and updation of the same with the aid of project monitoring tool Primavera Project Planner Version 5.0 under Windows Operating System. h. Planning for new projects, Preparing resource schedule, time schedule and manpower planning. i. Checking Sub-contractors works to eliminate mistakes and abortive works
· Project Planning includes.
a. Detailed method statement relating to the design/drawing, execution of work, timecycle for critical activities such as casting/placing of precast elements, piling involving conventional piling rig as well as rotary drilling rig.
b. Mobilisation of equipment, deployment of personnel, utilisation for equipment and machinery deployed.
c. Resource planning for construction material and bought out items like bollards, fenders in marine works, crash barriers, street lighting, fencing etc. d. Cash flow calculation, Earned Value analysis and Resource forecast linked with CPM. Page 3 of 6
e. General installation plan for site installations like location of batching plant, location and size of casting bed, fabrication yard, crushing plant, hotmix plant, wetmix plant (in case of road projects) diesel generating set location and other office installation. 8. EXPERIENCE : 34 Years
Interise Project Management – Operation and maintenance of NHAI projects in AP, MH and Bihar, monitoring Major maintenance programme.
Adani – Six laning of Kagal Satara 65 km road project involving, Flexible and Rigid pavement, 6 km elevated segmental box girder flyover in Maharashtra Arvind Technocrat - Project planning for 4 km Viaduct construction involving pile foundation, Precast I girders for Visakhapatnam port connectivity NHAI project. Company Designation Period Major Responsibilities
Interise Project
Management Private Ltd.
General
Manager
Sep-24 to
April-25
Operation and Maintenance of NHAI projects, 4
projects in AP, MH and Bihar
Adani Road – Kagal
Satara 6 laning Project
DGM Aug-23 to
Sep-24
Project Planning and monitoring for 6 laning of 68 km Kagal Satara road project in Maharashtra
Arvind Technocrat Delhi DGM May 2023 to
Aug 2023
Elevated viaduct for Visakhapatnam Port Road
construction
NCC Limited Bangalore DGM Feb 2022 to
Feb 2023
11km Bangalore Metro Viaduct with U girder
construction from KR Puram to Nagwara.
Afcons Infrastructure
Limited Mumbai
Assistant
General
Manager
Planning
July 2019 to
Mar 2021
Project planning and construction of Island
Breakwater, Four laning of Darkhar to Sarail in
Bangladesh
L&T Infrastructure
Development Projects Ltd
Chennai
Assistant
General
Manager
Planning
Aug 2007 to
June 2019
Project planning and Implementation for BOT 4/6
Lane highway projects
GMR Pochanpalli
Expressways Pvt. Ltd.
Bangalore 25
Planning
Manager
Oct 2005 to
Aug 2007
Project Planning, for Ambala Chandigarh 4 lane
expressway 36 KM BOT Project
Hyd- Bangalore AP Project (120 Km 2 packages)
AFCONS
INFRASTRUCTURE
LIMITED
MUMBAI- 53.
Planning
Manager
May 2004
Oct 2005
Project Planning, for DMRC viaduct Construction
at Dwarka 5.39 km Length, consisting, Open
foundation, Pile foundation, Pier and Box Girders. Wade Adams Middle East
– Gulf Consolidated
Contractors-JV. STATE
OF QATAR.
Planning
Engineer
April 2003 to
May 2004
(1 year)
Project planning and Monitoring using Primavera
ver. 3.0 for a 25 Km 2 lane dual carriageway
between Dukhan and Umm Bab for Qatar
Petroleum.
HOCHTIEF (INDIA)
PRIVATE LIMITED.
CHENNAI- 6.
Planning
Engineer
August 1999
April 2003
(4 years)
Project Planning using Primavera Project Planner
version 2.0b including Reportsmith 2.5 and
Drafting using Autocad 2000 for Breakwater
construction, Container terminal.
AFCONS
INFRASTRUCTURE
LIMITED
MUMBAI- 53.
Senior
Engineer
March 1994
August 1999
(5 years)
Project Planning, Scheduling and Updation Using
Primavera Project Planner Ver 2.0 under
Windows 95 Operating System for Jetties
Wharves, Diaphragm walls, Flyover and Road
construction.
NATIONAL ASPHALT
PRODUCTS AND
CONST. COMPANY
CHENNAI - 35.
Site
Engineer
May 1990 to
March 1994
(4 years)
Engaged in the construction of Parallel Taxi Track and Delta Taxi Track at Madras International
Airport for International Airport Authority of
India.
Page 4 of 6
NCC – Project planning for 11 km Bangalore metro viaduct construction involving pile foundation, Precast pier cap, U girder of 40 m span and composite structures from KR puram to Nagwara. Afcons Infrastructure – Project Planning for 27 km Darkhar Sarail 4 laning project in Bangladesh. Project planning for the construction of 4153 m Island Breakwater involving core armour and Accropodes of 16m3 and 8 m3 at Chhara Gujarat for SP infra L&T – IDPL – Larsen and Toubro – Infrastructure Development Projects Limited Chenai is engaged in Roads and Bridges Construction and Maintenance on BOT – PPP model, with NHAI. Projects Include, Vadodora Bharuch 6 Laning of 83km, Palanpur Swraupgunj 4 laning of 76 km., Chennai Tada 6 laning of 43 km Highway projects and Narmada River Bridge, 4 laning Beawer Pali Pindwara 244km, 6 laning of Gandhidham Samkhiali. GMR Group Bangalore: Construction of Ambala Chandigarh 4 lane expressway 36 Km including Major bridges, Flyover and underpass as BOT Project, AP – Farukh Nagar to Jadcherla and Adloor Yellareddy to Kalkala totalling about 120 Km 4 laning projects of NHAI. Achievement: Quantity calculation, Resource adequateness / Timecycle checking, Timely Completion in releasing sub contractors programme schedule, Roads sector management manual completed successfully.
AFCONS Infrastructure Limited Mumbai - Construction of Elevated viaduct of 5.39 km long involving prestressed precast concrete box girders, open foundation and pile foundation sub structure for DMRC Delhi Metro Rail Corporation at Dwarka Sub city Delhi. Achievement: Timely Completion, Steel reinforcement wastage contained at 6%, ISO re-certification audit completed successfully.
Wade Adams Middle East Ltd. – Gulf Consolidated Contractors JV, were engaged in the Engineering Procurement and Construction of two lane dual carriageway of length 25 km including 4 nos. interchange, 5 nos. underpasses and 3 nos animal underpass between Umm Bab and Dukhan in Qatar. Project estimate QR162 Million. The project planning was carried out in Primavera project planner Ver 3.0. and Reportsmith for making the analytical progress report involving weightage factor.
Achievement: Impact schedule / revised programme schedule prepared and approved by clients, Precast I girder production and precast arch production for interchanges and underpasses Timely Completion inspite of late start.
HOCHTIEF (INDIA) Private Limited is a leading construction company based in Germany. Their Indian operations include providing technical services and construction of marine structure
(breakwater) at Karwar Karnataka. Participated in the global bidding process for Bangalore International Airport The project planning was done in P3 Ver 2.0b including Reportsmith 2.5 for the above mentioned projects.
Achievement: Taiwan High Speed Railway SEM/CSD drawings peak production of 300 drawings achieved in one month, Steel reinforcement drawings checking completed, Programme Schedule prepared for Bangalore International Airport for Global bidding. Major Projects Include:
Ministry of Defence (Navy) Project -Seabird Breakwater Construction at Karwar Karnataka India
The breakwater of length of 3200 m which included quarried material of 24 million cum. Dredging the basin, approach channel, land reclamation, access roads for off road dumpers and work harbour construction.
Taiwan High Speed Railway Project: Responsible Engineer for a team to prepare, check and submit Structural Electrical Mechanical and Combined Services Design Interface Design Drawings which include indicating all the interface systems along the length of the track (approx. 45 km in length) and detailed sectional view drawings for the interface system. The time schedule was met with a peak production achievement of 300 drawings in a month. Page 5 of 6
Responsible Engineer for a team to prepare, check and submit the reinforcement detail drawings complying to ACI code for the Taiwan High Speed Rail project involving all way side facilities like, Signalling station, Signal Power room, Transformer station, Base sub station and other ancillary buildings.
LNG Petronet Limited. Breakwater Project For LNG Terminal at Dahej Gujarat India. A breakwater of length 670-m consisting of quarried material as the core and protected by accropode as the armour was planned in the open sea at a depth of 17-22 metres required to protect the mooring vessels. Project involved quarried material of 2 Million cum and Accropode of 2.50 cum (10 Ton) numbering to about 19500 and dredging quantity of 200,000 cum. Container Terminal Itapoa Santa Catarina Brazil.
Container terminal at Brazil to handle 1960 TEU full container. The project planning included a jetty consisting of a loading platform 360 metres long and 34 metes wide, 207 metres long and 14 metres wide access bridge, installation of rail mounted gantry crane, tyre mounted gantry crane, storage yard for containers, containers with hazardous goods, reefer containers, sewer drainage network, electrical and telecom services, street lighting and flexible pavement works. Bangalore International Airport at Karnataka India Global Tender Bidding for the above included project planning of all Land side and Air side buildings except the Passenger Main Terminal Building and Control Tower Building. Expressway at Belfast
Quantity Estimation for a 17 km long six lane express highway involving rotaries, underpass and emergency crossover.
AFCONS Infrastructure Limited is one among the leading construction companies in India engaged in the business of executing infrastructure projects such as Highways, Bridges and Marine structures. Many of which are financed by international funding agencies such as World Bank and Asian Development Bank.
Achievement: Project planning for Road projects,Standardisation of procedures for ISO implementation. Database developed and implemented for Inventory system, material control and Movement of Personnel.
Major Projects Include, Chennai Coal Wharf at Ennore, Paradip Coal wharf, East Coast Road work Tamilnadu, Karimnagar Siddipet Road work, Reliance RoRo LoLo jetty, Tank pads for fuel farm at Jamnagar, Pipavav Jetty I and II, Airoli bridge New-Bombay. National Asphalt Products and Construction Company is a leading company in Chennai engaged in the construction of Airport pavement and Road works including National Highways. Major Project Include, Construction of Delta taxi track and Parallel taxi track at Madras International Airport for International Airport Authority of India involving Pavement Quality Concrete for rigid pavement using Batching plant, transit mixers and asphaltic concrete for flexible pavement using pavers and vibratory rollers.
Achievement: Delta Taxi track and Parallel taxi track executed in operational area within the stipulated period without any safety or security lapse. COMPUTER AWARENESS:
Proficiency in Windows operating systems, Packages include Microsoft Office 2000, Microsoft Access, Microsoft Outlook, AutoCAD 2000 and Primavera Project Planner – Enterprise Project Management.
1. Developed & Implemented Inventory Control and Planning system for Equipment, Shuttering Material and Personnel Movement in Foxpro Version 2.6a. Page 6 of 6
2. Manpower Planning & Deployment. Training programme for personnel with various training agencies (To schedule participation of personnel with that of training agency’s schedule and budgeting of funds for the required training programme) in Foxpro Version 2.6a. 3. Developed payroll, Stationery control and Timechart to track hours spent by Engineers with Microsoft Access97.
ADDITIONAL INFORMATION:
1. Undergone training on Breakwater Construction, Seminar and Workshop conducted by Indian Institute of Technology Ocean Engineering Chennai. 2. Undergone training on “Primavera Project planner” organised by KLG Systel Mumbai. 3. Undergone training on Enterprise Project Structure of Primavera Version 5.0 by KLG Systel. 4. Undergone three months training on “AutoCAD 2000” conducted by USA Memory Systems Chennai.
5. Received a certificate of appreciation for following Kaizen Principles. 6. Bureau Veritas Quality International Certified Internal Auditor for ISO 9001-2000. 7. Undergone Road construction technique training programme conducted by IR Rasta Bangalore Date: Place: Chennai (C. Nagaraj)