Post Job Free
Sign in

Maintenance Technician Technical Support

Location:
Monterrey, Nuevo Leon, Mexico
Posted:
October 23, 2025

Contact this candidate

Resume:

JORGE CESAR RODRIGUEZ RAMIREZ

Mobile: +1-334-***-**** (USA), +52-81-124*-**** (Mexico) E-mail: ********@*****.***, *********@*******.***

Kansas City, Missouri. USA.

Work experience:

TN VISA

Work experience:

Magna (05/2023-01/2025) Automotive Industry

Responsibilities (Controls and Robotics Engineer)

• PLC Programming and Troubleshooting.

• Allan Bradley and Siemens PLC’s.

• Electrical, Electronics, Mechanical, Pneumatics and Hydraulics Troubleshooting.

• Maintenance Technician Support.

• Robots. Programming and Troubleshooting.

• Die Casting.

• Welding.

• Instrumentation. • Hands-On Position. • Electrical and Electronics troubleshooting. • Continuous improvement Projects. • Reduce Down Time. • Ecoat Treatment.

• Vision System.

• Finish Good Assembly Lines.

• Electro-Hydraulics, Mechanical, Electro-Pneumatics, Electrical and Electronics Systems.

Nemak (12/2022 - 04 /2023) Automotive Industry (Die Casting and Finish Good) (Alabama)

Responsibilities (Controls Engineer)

• PLC Programming and Troubleshooting.

• Die Casting Equipment.

• Laser Cutting Cell.

• Allan Bradley and Siemens PLC’s.

• Maintenance Technician Support.

• Robots. • Hands-On Position. • Electrical and Electronics troubleshooting.

• Electro-Hydraulics, Mechanical, Electro-Pneumatics, Electrical and Electronics Systems.

Hwasaung Automotive Alabama– (02/2021.- 12/2023) Automotive Company. (Enterprise, Alabama. USA).

Responsibilities: (Process Engineer)

• Control Process (Flow Charts, Work Instructions, Process Control Parameters, Operator Training, etc.).

• Maintenance PLC programing and troubleshooting equipment, electrical, electronics, pneumatics and mechanics.

• Technical Support for Maintenance Technicians.

• Hands On position.

• Hydraulics, Mechanical, Pneumatics, Electrical and Electronics Systems.

Aceros y Laminados Leal Operartions Manager – (01/2020 – 05/202) Steel Company. (Juarez, Chihuahua).

Responsibilities: (Operations Manager)

• Siemens PLC programming and troubleshooting.

• Production Plan.

• Maintenance and Facilities.

• Security

• Electrical Installations.

• Mechanical, Electrical and Electronic Troubleshooting.

• Hands On.

• HR.

• Spare Parts.

• Hydraulics, Mechanical, Pneumatics, Electrical and Electronics Systems.

Consultant Free Lance – (05/2019 – 01/2020 )

• Allen Bradley PLC programming and troubleshooting. (Studio 5000, RSLogix 500).

• Siemes PLC programming and troubleshooting. (Tia Portal and Simatic Manager).

• Electrical Installations.

• Electrical and Electronic Troubleshooting.

• Hands On.

• Launching Steel Plant (Guadalajara).

• Hydraulics, Mechanical, Pneumatics, Electrical and Electronics Systems.

• Hydraulics, Mechanical, Pneumatics, Electrical and Electronics Systems.

Huntington Project Automation Manager – (01/2019—05/2019) (Monterrey, NL)

Responsibilities: (Project Automation Manager)

• Corporative Support.

• Allen Bradley PLC programming and trouble shooting.

• Siemens PLC programming and troubleshooting. (Tia Portal Simatic Manager).

• HMI’s.

• Scada software. (Ignition)

• Electrical Installations.

• Electrical and Electronic Trouble shooting.

• Hands On.

• Budget Control.

• Hydraulic, Mechanics, Electrical and Electronics Systems.

Consultant Free Lance – (11/2017 –01/2019)

• Allen Bradley PLC programming and trouble shooting.

• Electrical Installations.

• Electrical and Electronic Trouble shooting.

• Hands On

• Hydraulics, Mechanical, Pneumatics, Electrical and Electronics Systems.

ATC Automation ATC Automation specializes in assembly and test systems for a variety of industries.

(Cookville, Tennesse). (05/2015 – 06/2017)

Position: Field Service Engineer

Reporting directly to: Service Team Leader Responsibilities:

•Assembly Production Lines Installations.

•PLC programming. (Siemens, Allen Bradley, Omron, etc).

•Training.

•Equipment upgrades.

•Guaranties.

•Robot drives and servo Programming.

•Troubleshooting.

•Technical Support.

•Hands On

• Hydraulics, Mechanical, Pneumatics, Electrical and Electronics Systems.

Main achievements:

•Launch Assembly lines

Luvata Ramos – ElectroFin® E-Coat treatment corrosion durability protection for fin and tube heat exchangers. (Ramos Arizpe, Coahuila).

Position: Facilities and Maintenance Manager (02/2013 – 05/2015).

Reporting directly to: Plant Mgr,

Plant Manager Responsibilities:

•Start Up Plant.

•PM program Launch.

•Spare Parts Requisitions.

•Fire System Test, Log, and Records.

•Fire Extinguishers and Fire System Log and Records.

•Emergency Electric Generator Logs and Test.

•Air Compressors Records.

•Security Cameras.

•Weekly Safety Audits.

•Recycle and 5’s Programs

•Safety and security Risk detection.

•Budget Control.

•KPI s.

•Process Audits.

•Customer complaints.

•Operators and Technicians training.

•Contractors supervisión.

•Data collections for Predictive maintenance implementation.

•PM program for production equipment and facilities Equipment (Chillers, compressors a/c, main electric transformer, etc.)..

•Customer Audits.

•Hands On.

•TPM.

Main achievements:

•Plant Launch

•Customer Audits Pass successfully.

•Develop PM Software

•Change of the Technology for Process Control.

Halliburton – (08/2012 – 02/2013) – Providers of products and Services to the Oil energy industry. (Villahermosa, Tabasco).

Position: Property Manager

Facilities Maintenance:

• La Choca Headquarters Offices, Five Level Building, Two Elevators, and Four Level Parking Lot.

• Gregorio Mendez Latin American Training Center.

• File Warehouse.

• Launch Fire System.

• Zero Accident and Incidents for Employees and Contractors.

• Accomplish all the Global Risk Requirements.

• Budget Control.

• Building Expansions.

• Dairy Safety Meeting for contractors and employees.

• Keep Fire System Records.

• Monthly Safety Audits.

• Monthly Safety Revisions.

• In charge of Security Contractors. (Guards).

Main achievements:

• Rig Pass Certification

• Complete all Legal Documentation For the main Building and two Services Locations.

• Finish and Launch the File Building.

• Implement Recycle and 5’s Programs.

• Maintenance cost reduction (15%).

• Implementation Facility Risk, Fire, electrical, and Security.

Magna Power Train – Automotive Industry. (Apodaca, Nuevo Leon). (12/2002-07/2012).

Position: Automation Coordinator

Reporting directly to: Maintenance Manager Responsibilities:

•Trouble shouting Servo Motors and Drives.

•TPM.

•KPI s.

•Data Collection and Analysis for Predictive Maintenance.

•Hands-on and administrator engineer.

•Kaizen Workshop for Line Process Improvement.

•Preventive Maintenance to Peripheral Equipment (Chillers, Hydraulics Pumps, Air Dryers, etc).

•5’s.

•Troubleshooting Test Equipment. (SIEMENS and OMRON)

•Assembly Line for Oil Pump (PLC Omron, line installation, Debugging, Leak Test Equipment and Troubleshooting).

•Upgrade Test Equipment.

•Lean Manufacturing.

•ISO 9000.

•TS 16949.

•Plastic Injection.

•Process and Quality Auditor.

•PFMA.

•Programming PM’s for Technicians.

•Data collection and analysis for predictive

•Maintenance Implementation.

•Programming and troubleshooting Siemens & Allen Bradley PLC s (Profibus, Ethernet and DeviceNet).

•Troubleshooting CNC Equipment.

•Instrumentation: Pressure transducer, LVDT,s, Flow transducer, LVDT transducers, etc.

•Programming and trouble shouting ABB Robots.

•Hydraulics, Pneumatic and Mechanical Equipment PM.

•Preventive Maintenance to Peripheral Equipment (Chillers, Hydraulics Pumps, Air Dryers, etc)

•Programming and troubleshooting HMI s (Panel view, Ethernet).

•Manufacturing Improvement ( Process and Equipment)

Siemens Automotive – World Class Automotive Industry manufacturing automotive sensor and valves for emission controls for Ford, Chrysler, GM, Honda, Nissan and V.W. (Juarez, Chihuahua). (01/1994-06/2002).

Position: Maintenance Manager

Reporting directly to: Operations Director

Responsibilities:

•Tool Room and Tool Crib. (Spare Parts).

•Support Equipment Maintenance (Air Compressor, Vacuum Pump, A/C, Lighting, Chiller, etc.).

•Facilities and Equipment Maintenance.

•Lead Transfer of assembly lines from Canada to Juarez

•Coordinate Layout changes.

•PM Program Implementation.

•Construction.

•Reduce Down Time.

•Siemens and Direct PLC Programming.

•KPI’s

•FPY.

Main achievements:

•Reduced investment in spare parts for $60,000.00 usd

•Managed warehouse expansion 800 m2 of construction.

•Automatic Dust Control (Link with Weather Station).

•Alarm system for emergency doors implementation.

•Automatic Fire Alarm System for production and warehouse implementation.

•Automatic Light Control for Production Areas implementation, annual savings of $19,000 USD.

•Design New Equipment getting annual savings for $50,000 USD.

•Reduced the Down Time from 6 hour to 20 minutes at day.

•Implement a Data Collection System for Productions Lines. Monitoring System of 17 automatic/semiautomatic stations getting scrap, downtime, production rates, and FPY.

•TPM implementation.

Academic history

UANL (Universidad Autonoma de Nuevo Leon, Mx

•ICC (Cumputer and Control Eng).

•IEC (Communications and Electronics Eng),



Contact this candidate