Post Job Free
Sign in

Project Management Mechanical Engineer

Location:
Al Khobar, Eastern, Saudi Arabia
Posted:
October 20, 2025

Contact this candidate

Resume:

NAME: Sheshu Kumar Pitani

POSITION:

Contact: +966********* ********@**********.***

KEY SKILLS

Collaboration, Teamwork

Communication

Time Management, Leadership, Problem solving, Critical thinking

Adaptability,

ORACLE, SAP-MM,

YEARS OF EXPERIENCE

27 Years

EDUCATION

Bachelors of Technology (B-Tech)

REGISTRATIONS/CERTIFICATIONS

Diploma in MEPP

Diploma in Mechanical Engineering

PMP,

ISO 9001-2008 (Lead Auditor),

ISO 9001-2015 QMS (Lead Auditor)

ISO 450***-**** (OHS0)

ISO IEC 27001-2022

PROFESSIONALaAFFILIATIONS

SCE (Saudi Consul)

PMI (Project Management Institute)

TRAINING

Required On Job Trainings and courses of AECOM University and

SAUDI ARAMCO, PETRORABIGH.

LANGUAGE SKILLS

Arabic, English, Telugu, Tamil, Hindi, Malayalam,

DATE OF BIRTH

29-09-1974

NATIONALITY

Indian

Candidate Summary

Bachelor of Engineer (B-Tech) from India having expertise Around 28 years (20+ Years in KSA) in multi-disciplined Mainstream industry particularly in the Infrastructure, Oil and Gas Refining, Petrochemicals, Process, Power plants, and experienced in Project Management of large-scale multi discipline projects, CAPEX&OPEX execution, Operation & Maintenance.

Professional History: -

Summary: I possess strong expertise in site organization, schedule management, resource management, and the ability to navigate critical situations effectively. My knowledge spans across EPC project management, contractor oversight, project planning, cost control, and the implementation of product targets and total quality management systems. I excel at resolving technical and commercial issues, supervising the fabrication and installation of piping and equipment erection, and ensuring construction safety through risk assessments and job safety analyses.

I strive to ensure projects are completed according to design criteria, within the allocated time, budget, and safety targets, thereby achieving profit objectives in a cost-effective manner.

Detailed Experiences: -

SEP 2021 – Present

(AECOM ARABIA)

Position: Construction Specialist / QAQC Specialist

Project Name

NEOM Gulf of Aqaba (Magna Projects) Involved in the projects of Gulf Of Aqaba (MAGNA Projects) from the start of area.

Access roads, laydowns, NEOM Office buildings installation and commissioning, Storm water channels (UG), Culverts, Fire Water/ Firefighting System installation& commissioning, and Early works of Iconic Gas Station (EPICON), Mountains Rock Stabilization works, Tunnel works at Cube Marina Project, and enabling works of Beaches and Hotel buildings resorts in the marine area

Responsibilities:

Lead and coordinate daily site operations, ensuring alignment with project schedules and safety protocols. Supervise subcontractor performance, ensuring quality and compliance with NEOM Project specifications.

Act as the primary site interface for the Client, supporting routine project activities and resolving field-level issues.

Monitor and report progress, risks, and deviations, using

structured tracking tools. Promote a strong safety culture and ensure adherence to HSE policies.

Collaborate with engineering and procurement teams to ensure timely delivery of materials and resources, and with subcontractor procurement activities.

Develop, review, and implement detailed construction plans and schedules, ensuring that milestones and deadlines are

met. Oversee the daily operations on-site, ensuring the project progresses according to the construction plan. Monitor work progress and adjust plans as necessary to mitigate delays or cost overruns.

Ensure the availability of all necessary resources, including manpower, materials, and equipment of contractors to meet project goals.

Provide leadership and mentorship, fostering a positive and productive work environment.

As a NEOM Secondee responsible to oversee the Construction activities of EPCs, Implement and process Quality Assurance and Quality Control at projects to ensure the construction meets its minimum requirements and standards.

Review and approve the Quality Procedures (Sch-Q, PQP) Method statements, ITPs.

Measure & Monitor the project deliverables, track the submittals, and maintain the PQI to reach its targets.

Supervise Quality Inspection Team of consultant and contractors, maintain the WIRs, MAR/MIRs IFC/SHDs, prepare weekly reports and discuss in the weekly progress meetings.

Conduct/Involve in the training sessions to the contractor Quality Personnel.

Conduct Quality meetings weekly and monthly in order to resolve the issues and concerns and to maintain smooth transitions between stakeholders and contractors.

Involve in internal and external audits, review KPIs & Quality dashboards,

Assure the project and NEOM Requirements are met and to make smooth completion and handover of projects.

June 2016 - Sep 2021

Employer: Petrorabigh

Position: Plant Coordination Engineer

Project Name : A world biggest Mega Refining & Petrochemical Complex JV of SAUDI ARAMCO and SUMITOMO Japan, for the LDPE/EVA Plant, Polymer-II Department.

Responsibilities:

Maintenance planning

Plant shut down planning

Coordinate Operation Dept. and Maintenance Dept.

Quality Management

Emergency Work

July 2010– June 2016

Employer: Petrorabigh

Position: Sr. Project Execution Engineer

Project Name

Project Execution Section, Project Management Department. (Utilities, Steam generation Boilers, Substations, Sea Water Intake, Desalination Plants, Firefighting Networks, Refining plant, Polymer Plants, Monomer Plants of Phase 1&2 (MEG, POX, HOFCC and Ethane Cracker Plants)

Responsibilities

Responsibilities includes the overall projects planning & scheduling, hazard analysis (JSA), review of MOCs, design, procurement and construction in compliance of minimum safety requirements and balancing the budgets allocated for each project.

Manage all the stages of construction until commissioning including monitoring and witnessing the hydro test of pipelines, static & stationary equipment. Interface with the proponent departments for better output of the project and coordinate with the Safety and Quality departments to maintain and meet all project requirements as per the approved scopes of projects to a safe and successful project completion and handover the same to the proponent including financial closing of each given project in a timely manner.

Determine CAPEX & OPEX projects based on each plants and systems operational requirements of Shut down, Non-Shutdown and Overall Complex T&I. Plan for plant shutdown projects, T&I Projects, prepare materials long lead and shelf items including surplus items, Provide Scopes and Service Orders to the Contractors, and prepare the JSAs and required documentation and clearances from the proponent plant Heads.

July 2009 to July 2010

Employer: Petrorabigh

Position: Technical Coordination Engineer

Project Name: Project Engineering & Support Unit of Engineering Department.

Responsibilities

Coordinate within the Engineering department, and other departments of the complex (Refinery and Petro Chemical Complex) Coordinate the Engineering Work Requests (budgeted and capital projects) in the design, estimates and IFCs as well as the as-built drawings after the construction. Confirmation of construction and its stages of the delivered projects as per the design and scope of the Engineering Dept.

Review of TSR, MOC and Technical Queries of each proposed CAPEX by the manufacturing Dept.

Coordinate with the General Engineering Services Contractors for the Engineering Work Orders in order to manage all the stages of projects up to the complete documentation and close out.

Feb. 2007 to July 2009

Employer: Petrorabigh

Position: Construction Specialist

Project Name: Joint Venture Directorate Office, in the Hybrid team of Technical Advisory & Commissioning CSTF (Commissioning & Start-up Team

Responsibilities:

To monitor the complex wide Commissioning and Start-up activities. As a member of the Commissioning & Start up Task Force (CSTF) team, responsible to oversee the Sub Taskforce Teams (STT), involves in construction, Pre-commissioning, Commissioning and Start up activities with all of PMT/EPC’s packages of Refinery & Process plants like HOFCC, Polymer, Monomer and Utilities including Tankage Etc.

Also responsible as a frontline Handover Lead to involve in the Mechanical Completions, Punch Item Closeouts, participate in the PSSR (Pre-Start up Safety Review) oversee smooth handover and close out of each Plant/System with Manufacturing Departments.

May 2003 to Feb 2007

Employer: MR Al Khathlan Est

Position: Project Manager

Project Name: Saudi Aramco Rabigh Refinery for the Offsite Utilities Project. A major RTR & Utility pipeline project and Demolition of old Boiler and installation of Foster Wheeler Packaged type Boiler,Private Projects of MRK Est Head Office, Dammam, MRK Qatif Guest House, MRK Half Moon Project, Khobar, SCECO Project, Mohammadia, Jeddah, KAA Airport HAJJ Terminal Substation, Jeddah

Responsibilities:

Identifying client’s contractual requirements with an understanding of client’s specifications and standards. Preparation of comprehensive construction Plan and implementation of QA/QC procedures. Further to highlight the deficiencies if any for rectifications. Establish, schedule and conducting the internal audit program to cover all work phases in conformance to the desired requirements. Periodical review of internal audit reports to recommend the required corrective actions.

Maintaining healthy interfaces with the equipment/material suppliers and vendors in order to ensure required quality standards of clients and the manufacturer.

Experience in India

October 1997 - March 2000

Employer: NCS GAYATRI SUGARS AND CHEMICALS LIMITED, HYDERABAD, INDIA.

Position: Site Manager

Project Name: Construction of 3500TCD Sugar Plant with 80T Co Generation Power plant.

Responsibilities:

Worked for the construction site of The KCP Limited supplied Self-setting mills, Centrifugal machines, and Co- generation power plant of 6MW turbine with alternator including 80 Ton water tube boiler, piping & equipment erection and commissioning

July 1994 – October 1997

Employer: THE KCP LIMITED. MADRAS, INDIA

Position: Quality Control Supervisor

Project Name: Prudential Mouli Sugars and Industries with Co Gen Power Plant, Andhra Pradesh, India,

Sivasakthi AMSSK Ltd, Khamgaon, Maharashtra, India

NCS Gayatri Sugars and Chemicals Limited, Hyderabad Andhra Pradesh

Ganpathy Sugar and Industries Limited with Co Gen Power Plant. Andhra Pradesh, India

Responsibilities:

Review of inspection test plan, material verification and all stages of inspections, review of radiography, final visual dimensional and welding inspections and review of final Dossiers prior to acceptance of the product

Conduct inspections for the mechanical activities for the Rotating and static equipment, fabrication & erection of piping, etc

April 1993 – June 1994

Employer: TASHPA CONSTRUCTIONS PVT. LIMITED, MADRAS, INDIA

Position: MECHANICAL SUPERVISOR

Project Name: Machine Division. Manufacturers of Circular Saw Type Granite cutting machines with the collaboration of Spiegel Co, Germany.

Responsibilities: Supervise the shop manufacturing of parts like vertical & horizontal columns, bearing housings installation, Assembling and test run of machines, fabrication of bridge and trailer with rails, installation of complete set in the customer’s plants and commissioning of machine unit.



Contact this candidate