ROLLY LEONCITO
MIEAust, PMP, CE, ME*
Address: P.O. Box 31282 Doha, Qatar
Contact No.: +974-********
E-mail: ***********@*****.***
Linkedin: linkedin.com/in/rollyleoncito
Professional Summary:
A dedicated and goal-oriented Engineer with over 19 years of experience in the construction and oil & gas industry, encompassing all phases of engineering operations. Possesses extensive commercial and technical expertise, with a proven track record of delivering cost-effective solutions and managing complex projects within tight deadlines. Highly professional, resourceful, and disciplined, with strong team collaboration skills and the ability to excel in fast- paced, dynamic environments.
Skills and Attributes:
• Project Management
• Estimation & Tendering
• Cost Management & Claims
• Quantity Surveying
• Procurement & Subcontract
• Complex Problem Solver
• Attention to detail
• Defining & leading assignments
• Contract Management
• Negotiation
• Microsoft office proficiency
• AutoCAD & Primavera
• Infrastructure
• Building Construction
Professional Work Experience:
Designation: Lead Civil Engineer – Senior Quantity Surveyor Company: Builders Advanced Engineering and Construction Employment Date: June 2010 to Present
Location: Doha, Qatar
Projects: - NFPS Onshore Building and Infrastructure Compression Project (COMP9)
- Civil Works for NFPS Desalination Plant and Remineralization Project
- QVC PVC Plant Project – QAPCO (Civil & Building Works)
- Zero Liquid Discharge Plant – QAFCO (Civil Works)
- Development of Doha Airbase – SC Pac 1&5 (DDAB)
- RLTO Expansion & Offplot Facilities for NFE EPC3 project
- QAPCO Dual HRSG Project – Civil & Building Works
- Refurbishment of Doha West Sewage Treatment Works (Civil Works)
- Proposed Warehouse Buildings in Extended MPCL Complex
- Reconstruction in Phases of the Lycee Bonaparte School Project
- Construction of East Industrial Road P17 (Bridge & Underpass)
- EPIC for Mesaieed (MIC) Hazardous Waste Treatment Center
- Road & Infrastructure in Wakrah West MMUP (Storm Tank & Pump Station)
- RAF A3 Seawater Reverse Osmosis Project (Plant, Intake Pump Station, Tank)
- RAF A2 Desalination Project - Construction of Potable Storage Tank
- Rehabilitation of Six (6) Well Field Station GTC 499
- Construction of New Factory for Hepworth PME
- Construction of Wood and Interior Finishes Factory
- Construction of Aluminum and Glass Factory
- Construction of Precast and GRC Factory
- Construction of Advanced Pipes and Precast Factory Project
- Northeast Underground Car Park
- Doha West Transfer Station Project
Duties and Responsibilities:
• Lead and manage tender projects, including preparation of both commercial and technical proposals.
• Prepare accurate and detailed cost estimates and quantity take-offs, covering both direct and indirect costs.
• Analyze and interpret tender and contract documents, identify key requirements, and develop comprehensive pricing and bid packages.
• Head the Tendering Department: oversee resource allocation, task assignments, and provide mentorship and guidance to team members.
• Compile and present proposal reports for management review and lead final proposal discussions.
• Develop value engineering options and alternative proposals for client evaluation.
• Prepare execution plans, manpower and equipment histograms, and baseline project schedules in line with contract requirements.
• Prepare project budgets, develop cash flow forecasts, and implement project control plans and procedures.
• Monitor and control project budgets, track expenditures, and perform detailed cost analysis to ensure financial compliance and efficiency.
• Perform risk assessments and develop effective mitigation strategies.
• Evaluate technical requirements and provide recommendations for material selection.
• Manage procurement for civil and architectural items: prepare RFQs, evaluate vendor proposals, negotiate terms, and finalize purchase orders.
• Handle subcontracting process: prepare subcontract packages, evaluate bids, negotiate terms, draft subcontract agreements, inspect work progress, and validate invoices and claims.
• Develop and maintain a Material Tracking System to effectively monitor the procurement process and ensure timely delivery.
• Review drawings (IFR, IFA, IFC, AFC) and ensure alignment with contract requirements.
• Prepare method statements, material submittals, shop drawings, and Inspection & Test Plans (ITPs).
• Conduct site inspections and coordinate with site teams and stakeholders.
• Prepare claims and change orders in compliance with contract terms and liaise with clients for approval.
• Resolve technical and contractual issues effectively and promptly.
• Develop and monitor Progress Measurement Systems for Engineering, Procurement, Construction, and Testing & Commissioning.
• Prepare monthly progress invoices and final account.
• Gather and analyze productivity data to support future planning and decision-making.
• Provide continuous technical and commercial support to Project Managers and cross- functional teams.
Designation: Senior Quantity Surveyor
Company: DDT Konstract Inc.
Employment Date: November 2009 to June 2010
Location: Mandaluyong, Philippines
Projects: - Construction of Light Residences Project Duties and Responsibilities:
• Managed and prepared comprehensive tender proposals.
• Prepared accurate and detailed cost estimates and quantity take-offs for both direct and indirect project components.
• Reviewed and interpreted tender documents, identified key requirements, and developed precise pricing and bid packages.
• Developed project execution plans, including manpower and equipment histograms aligned with project timelines.
• Conducted regular site inspections and coordinated with site teams to ensure compliance with design and schedule.
• Prepared and submitted changed orders in accordance with contract requirements and liaised with clients for approvals.
• Prepared monthly progress invoices and final accounts.
• Managed procurement and subcontracting processes, including preparation of RFQs, solicitation, evaluation, negotiation, and finalization of proposals from suppliers and subcontractors.
• Prepared technical submittals such as method statements, material submittals, and ensured compliance with project specifications.
Designation: Assistant Quantity Surveyor
Company: Aldar Laing O’Rourke Construction LLC
Employment Date: March 2008 to September 2009
Location: Abu Dhabi, United Arab Emirates
Projects: - Al Raha Beach Project (Mussafah Workforce Community) Duties and Responsibilities:
• Prepared and submitted monthly progress invoices in alignment with project milestones and contractual terms.
• Conducted regular site inspections and coordinated with site teams for progress.
• Carried out quantity take-offs and cost analysis for claims and variation orders; liaised with client representatives for review and approval.
• Managed subcontract orders, including preparation of RFQ documents, evaluation and negotiation of subcontractor pricing, inspection of work progress, and validation of subcontractor invoices and claims.
• Maintained and updated the Early Warning Notices and Risk Register to proactively identify and manage project risks.
• Updated monthly liabilities and forecasted final subcontractor accounts, ensuring accurate reporting within the Causeway Project Accounting (CPA) system.
• Prepared monthly contract review reports using data extracted from the Causeway system.
• Executed cost and budget transfers to support effective cost control and allocation tracking.
• Monitored and forecasted labor, equipment, and material usage to support project planning and resource optimization.
Designation: Civil Engineer
Company: Toyo Construction Co. Ltd.
Employment Date: June 2006 to February 2008
Location: Makati, Philippines
Projects: - Urgent Bridges Construction Project for Rural Development
(PACKAGED III) with 64 Bridges and Roads
Duties and Responsibilities:
• Prepared and submitted monthly accomplishment reports for review and approval by the Project Director.
• Conducted regular site inspections and coordinated with construction teams to ensure smooth project execution.
• Monitored project accomplishments and progress; chaired daily and monthly coordination meetings with site teams and stakeholders.
• Performed quantity take-offs based on tender, as-staked, and as-built drawings to support accurate cost and billing.
• Prepared and submitted monthly progress invoices in accordance with work completed and contractual milestones.
• Compiled Pile Driving Records for various pile types (precast concrete, steel pipe, H- steel beams, and steel sheet piles) and submitted them for client approval.
• Developed and maintained daily and monthly work schedules to support site planning and progress tracking.
Professional Licenses/Certificates:
• Professional Engineer (MIEAust) from Engineers Australia (EA ID 9544004)
• Certified Project Management Professional PMP®, number 3018395
• Licensed as Civil Engineer-Grade A by the Ministry of Municipality and Environment - UPDA (Qatar) - (Reg. # 9709)
• Licensed as Civil Engineer by the Professional Regulation Commission (Philippines) -
(Reg. # 0103982)
• Accredited as Materials Engineer 2 by the Department of Public Works & Highways
(Philippines) (Reg. # 2912)
Seminars & Training Attended:
• PMI Authorized PMP exam preparation (14-Mar-2021 to 14-Apr-2021).
• Project Planning & Control using Primavera P6 ver.8.2 (June 19 to 21, 2013)
• Causeway Project Accounting (CPA), Vision Excel, Aconex & Primavera Contract Management PCM (April - May 2008)
Education:
• Bachelor of Science in Civil Engineering at University of Santo Tomas – Legazpi (June 2000 to April 2005)