Post Job Free
Sign in

Material Handler A Team

Location:
Houston, TX
Posted:
October 06, 2025

Contact this candidate

Resume:

JAMES FRANKLIN JR.

SKILLS

• Repair services

• Boiler equipment

• Inspection preparations

• Structural fittings

• Parts and components fabrication

Mechanical troubleshooting and

diagnostics

•

• System tests

• Cleaning and maintenance

• Analysis of defects

• Blueprint Interpretation

CERTIFICATIONS

TWIC card Basic Industrial Hygiene

Certification Construction Site Safety

Supervisor Certification Field Safety

Certification Job & Proactive Safety

Certification Lead Exposure Awareness

Training Certification NCCER for

Boilmaker Certification Occupational

Ergonomics Certification Safety

Technology Certification Safety Training

Certificate

Dedicated Boilermaker with a background in coordinating jobs and selecting appropriate equipment. Knowledgeable in safe rigging, crane hand signals and effective communication with other employees. Offering a successful career history comprising more than 15 years. PREVIOUS EMPLOYMENT

February 2024 - April 2025

Material Handler Optimized Process Designs LLC, OPD, Vidor, TX April 2023 - January 2024

Material Handler Zachary Industrial, La Porte, TX

September 2022 - April 2023

Material Handler Optimized Process Designs LLC, OPD, Mont Belvieu, TX

May 2022 - May 2022

Boilermaker Journeyman Rus Industerial

Performed inventory management, ensuring accurate tracking of stock levels and locations.

•

Collaborated with team to optimize workflow processes, reducing material handling times.

•

Maintained cleanliness and organization of work area, adhering to safety protocols.

•

Read production orders, work orders, shipping orders and requisitions to determine items to be moved, gathered, or distributed.

•

Managed inventory levels through accurate tracking and reporting of material usage.

•

Ensured compliance with safety regulations while handling hazardous materials and equipment.

•

Coordinated with production teams to streamline workflow and minimize downtime during material transitions.

•

• Packed items into appropriate containers for shipment. Maintained a safe work environment by following proper safety protocols and conducting regular inspections.

•

• Transported inventory items to appropriate locations. Kept storage areas organized, clean, and secure to fully protect company assets.

•

Listened closely during team meetings to gain complete understanding of duties required for each shift, completing priority tasks first.

•

• Packed items into appropriate containers for shipment. Read production orders, work orders, shipping orders and requisitions to determine items to be moved, gathered, or distributed.

•

Unloaded incoming shipments to verify accuracy of deliveries and check possible damages.

•

• Studied designs, blueprints and drawings to create templates of boilers.

• Inspected equipment and structures to determine scope of work (SOW). CONTACT

Houston, TX 77049

713-***-****

************@*****.***

November 2020 - April 2022

Millwright Helper/Material Handler Kewitt

August 2017 - March 2020

Millwright Helper/Material Handler McDermott

May 2016 - June 2017

Boilermaker Foreman Starcon International

January 2016 - February 2016

Boilermaker Journeyman Ohmstede Industrial Services October 2015 - November 2015

Boilermaker Journeyman CCC Group

March 2014 - June 2015

Boilermaker Journeyman Bechtel Construction Company November 2013 - March 2014

Boilermaker TURNER INDUSTRIES GROUP LLC

• Tightened or replaced bolts and gaskets to repair leaks. Inspected and lubricated valves; removed, replaced or installed components to correct operating deficiencies.

•

Operated machine tools to fabricate parts during overhaul, maintenance or setup of machineries.

•

Kept detailed and accurate maintenance reports and documentation of progress.

•

• Adhered to all workplace safety policies, regulations and compliances. Inspected and examined all machinery and equipment to detect malfunctions or irregularities.

•

Disassembled machinery parts and categorized properly before moving to storage.

•

Kept detailed and accurate maintenance reports and documentation of progress.

•

• Studied designs, blueprints and drawings to create templates of boilers.

• Coordinated movement of materials and equipment to job sites. Dismantled equipment or devices to gain access and remove defective parts or components.

•

Marked reference points for columns or plates on foundations using master straightedge.

•

Removed boiler casings, grades, handrails, manhole and hole covers to facilitate access to boilers or other vessels for repair.

•

• Studied designs, blueprints and drawings to create templates of boilers. Inspected and lubricated valves; removed, replaced or installed components to correct operating deficiencies.

•

Inspected and lubricated valves; removed, replaced or installed components to correct operating deficiencies.

•

Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.

•

• Tightened or replaced bolts and gaskets to repair leaks. Removed boiler casings, grades, handrails, manhole and hole covers to facilitate access to boilers or other vessels for repair.

•

• Assembled and analyzed boilers for defects.

Inspected equipment, structures and materials to identify cause of errors.

•

January 2013 - November 2013

BOILMAKER/PERFORMANCE CONTRACTORS

September 2012 - January 2013

BOILMAKER/AUSTIN INDUSTIAL

January 2010 - September 2012

BOILMAKER/TURNER INDUSTRIES GROUP, LLC

April 2009 - January 2010

Boilermaker Zachary Construction

Built and repaired process tanks, storage tanks and water treatment tanks.

•

Used hand signals to notify crane operator to lift components to specific positions.

•

• Unbolting and bolting up piping systems, vessels

• Blinding and deblinding, hydro-testing piping systems, and vessels

• Rebuilding exchangers, removing valves and installing valves.

• Bolting and unbolting up piping systems and vessels

• Blinding and hydro-testing piping systems and vessels. Worked various shutdown projects doing blinding and hydro-testing piping systems, installed valves and controls

•

• Restored exchangers, opened and closed towers.

Removed boiler casings, grades, handrails, manhole and hole covers to facilitate access to boilers or other vessels for repair.

•

Dismantled equipment or devices to gain access and remove defective parts or components.

•

Inspected and lubricated valves; removed, replaced or installed components to correct operating deficiencies.

•

EDUCATION

May 1979

High School Diploma

Ball High School, Galveston, TX



Contact this candidate