Summary
There are many different types of mechanical engineering projects that can help solve issues. For example, I worked in one of poer stations projects where we needed to create a basic fundamentals of pre commissioning, commissioning & start up procedures for an industrial facility. We used our mechanical engineering skills to develop and write the scope of work steps which could be mass produced at a lower cost. Experience
Sr. Mechanical Engineer
EPROM- Middle East Oil Refinery (MIDOR)
05/2003 - Present
Present Experience:
-From p2003 to Present, I have worked as a Snr.Mechanical Engineer, (Mechanical Maintenance Department )performing the following tasks:
Waste oil separator skimmer; (Greasing bearings-Alignment-Check for smooth operation Check driving chain). Sulfur solidifier unit (SANDVIK); Check water nozzles-Alignment-Greasing bearing- Check Chain.
Storage tanks Fixed roof/ floating; check bottom plates' thickness -Roof seal. Heat exchangers;cleaning tube bundle-Hydro testing piping system (HDPE /PVC/ metal)
Motor & turbine-driven pumps "Single &Multi stage"(KSB-INGERSOL DRESER); check turning gear-changing oil -check shaft alignment-check mechanical seal components& bearings shaft run out-troubleshooting &over hauling).
Steam turbines (SIEMENS-NUVO PIGONE); check impulse blades-Alignment- check bearings &labyrinth- troubleshooting & over hauling..
Tank mixers (check backlash of gears-check mechanical seal & bearing). Third Mechanical Eng.
Sidi Krir Power Plant Project (West Delta Electricity Production Co.) 04/1999 - 05/2003
Previous Experience:
-Working in Sidi Krir Power Plant Project {April 1999 to May 2003} as a Third Mechanical Eng. (Steam turbines maintenance department), the main tasks included the followings installation and commissioning activities: Steam turbine & generator (SIEMENS); check impulse blades-Alignment- check bearings & labyrinth troubleshooting.
Air centrifugal compressor; cleaning filters & coolers-Changing oil- -Troubleshooting &overhauling . Mechanical traveling screens; greasing &changing bearings- check water sprays Troubleshooting. Motor & turbine-driven pumps; check turning gear -check alignment-check mechanical seal components& bearings- shaft run out- Troubleshooting & overhauling . Air dryers, check operation-Observing silicates-Fixing ball valves. Reciprocating piston compressors (COMPARE); check liners & rider ring-check piston rings-check piston rod packing-check orbit valves-piston rod run out check main bearing of crank shaft). Centrifugal compressor(CENTAC -INGERSOLAND); check & fixing dry gas seal-check the backlash of gear box- cleaning water oil heat exchangers-check &fixing lube oil pumps Changing shaft bearings) Mohamed Mahmoud Fayed
**.***********@*******.*** / +2-010******** / 16 Street No.302, Smoha, Alexandria, Egypt.
- During this period of time, I had dealt with the following companies during that period :
- TECHINT CIMI MONTUBI (Mechanical equipment &piping system).
- SIEMENS (Turbines).
- HITACHI (Sea water desalination plant).
From 04/1999 to 11 /1999, I had been working a Mechanical Operation Eng. (Sea water desalination plan). Education
Mechanical Power engineering
Faculty of Engineering / University of alexandri
06/1997
Trainng corses :
Pipeline Intelligent Pigging .
Mechanical seal failure.
Condensate steam traps.
Visual inspection for N.D.T .
Basic Management Skills ).
Diesel Engine Maintenance &Troubleshooting.).
High Pressure piping "ASME B31.3".
Strategic Negotiation.
Skills
Computer literacy, Microsoft Office, Vsual basic programming, Oracle Database