CURRICULUM VITAE
PERSONALDETAILS
SURNAME : GLEDIC
NAME : DARKO
CONTACTNo : +27-84-556-****,
E-mails : *****.********@*****.***
DATEOFBIRTH : 7. JUNE 1961
NATIONALITY : SA CITIZEN(PassportNo:M00284683,(15Jan2019-14Jan2029) QUALIFICATIONS : MATRICULATEDASINFORMATIONTECHNICIANGRADUATED AS BSc MECHANICAL ENGINEERING- UNIVERSITY IN ZAGREB- CROATIA-NINESEMESTARS
PROFESSION : PROJECTMANAGER
SENIOR PROJECT CONTROL
MANAGERSENIORRISKMANGER
CHIEF PLANNING ENGINEER
LEAD PROJECT PLENNING ENGINEER
SENIOR PROJECT COSTING ESTIMATING ENGINEER
SNR QA/QC INSPECTION-PROJECTS, PROJECT MANAGER PROJECT ENGINEER DEVELOPMENT TECHNOLOGIST DESIGN ENGINEER
COMPUTERLITERACY : PROFICIENTINTHEFOLLOWING:
LOTUS 1-2-3; WORD PERFECT 5.1 FOR DOS; QUATTRO
(FORDOS);MICROSOFT FOR WORD 97;MICROSOFT FOR
EXCEL;MICROSOFTPROJECT2007;
PRIMAVERA PROJECT PLANNER VERSION 3.1; PRIMAVERA
PROJECTMANAGEMENT-P6-Profession.R8.3.1
PERT MASTER REPORT S AND
ANALYSISPM+,PLANNING
PROGRAM;AUTOCAD14FORWINDOWS
DEMLIN : Project Management Course 6 months-March 2000 –Sept. 2000DAVISANDDEAN : Davis &Dean Project Management Professional Date issued 2012-11-28,Certificate Number 2012203
SPECIALITIES : Provide Project management services : monitoring and Approving Planning, Costing, Estimating and Finance Service to both Project and Corporate for related projects in parallel
(large and multiple intermediate size) from preparation of the conceptual studies stage, project proposal to
commissioning the facility and performing post-completion analysis. Under the general supervision of a Project Director 2
Management for all Proposal and Project activities Monitoring and Controlling projects
Estimating/costing of projects /planning /finance/prepare and review claims
Extracting quantities from drawing sand providing a total Preliminary cost budget for a project
Compiling and/or verification of Bill of Quantities Setting up and completing of price sheet and project Evaluation sheets, Preparing vendor enquiries and adjudication / verification of Offers in order to incorporate customer and design specification Leading with the project team member and sub contractors/Vendors on day to day basis Participating in system optimization for the project Obtaining technical information, flow diagrams and layout drawings from the Engineering Department Monitoring Engineering / basic design and purchasing to Ensure that limit are adhered to for tender purposes Compiling the final project document / offer to customer and Co-ordinate inputs from different departments
Assist contractor’s administrator with the resolution for claims Quality assurance for the fabrication of pressure vessels, Piping systems Operation of computers, as per above subjects Scheduling, updating, reporting look ahead, Analyzing critical path on project
Monitoring-chain critical path the Project
COMPETENCIES : Strong communication skills, Ability to multitask and work under pressure, Ability to work as part of a team or independently when required, Good problem solver and analytical thinker, Analytical and financial reporting skills, Escalate issues timorously with relevant line manager, Technical accuracy, completeness of data and adherence to the task, Strong negotiation skills, High level of accuracy/attention to detail, Strong leadership qualities
SASOLRECOGNITIONS: Growth Projects–Secunda-Best Player on the Year 2008, SASOL RECOGNITIONS: Growth Projects –Secunda - Best Player on the Year 2008,
ERG RECOGNITIONS: Recognition for The Projects with Senet and Worley Parson from Gareth Lawrence -Senior Project Manager ERG duration of the projects -(2017-2019)
,
3
THE COMPANY : ZAMBIA SUGAR-Project Twazabka - Process Plant, DATES : March 2025 –August 2025
POSITION : Owners Team - Bankable Feasibilities- Senior Project Control Specialist Overall purpose : Client Representative with oversight duties on the planning, costing design Progress, finance, procurement, construction, changes on the project Direct and coordinate the efforts of multi-disciplinary teams to achieve the Client’s Objectives consistent with the scope of the services to be provided Preparation of the Schedule for the project
CBE formulation and review,
Implementation in the SAP
Review and prepare approval of work break structure to be in line with schedule, CBE requirements and payments via SAP
Finance-Cash flow plan
Control Changes on the project in line with engineering and design department Manage costs and formulate strategies to control expenditure, approval of the invoicing
Coordination between client, EPCM, site and office Interacted with client on invoicing, scope, progress, quality Manage project resources and expanses
Project integration & hand-over
Preparation of the reports: weekly -monthly
THE COMPANY : ORION MINERALS MINE-CLIENT Representative (Prieska Copper Zinc Mine (PCZM) DATES : October 2024 –Jan 2025
POSITION : Owners Team -Bankable Feasibilities - Senior Project Specialist Overall purpose : Client Representative with oversight duties on the planning, costing design Progress, finance, procurement, construction, changes on the project Direct and coordinate the efforts of multi-disciplinary teams to achieve the Client’s Objectives consistent with the scope of the services to be provided Preparation of the Schedule for the project
CBE formulation and review,
Implementation in the SAP
Review and prepare approval of work break structure to be in line with schedule, CBE requirements and payments via SAP
Finance-Cashflow plan
Control Changes on the project in line with engineering and design department Preparation of the reports: weekly -monthly
Review forecast dates in the POP and make shore that is implemented in the program to review critical path of the project from the scope make shore that all changes are correctly presented and implemented on the project THE COMPANY : IMPALA PLATINUM MINE-MARULA PHASE II PROJECT DATES : October 2022 –July 20204
POSITION : Implats-Phase II Owners Team (IMOT)) - Senior Project Specialist Overall purpose : Client Representative with oversight duties on the planning, costing design progress, finance, procurement, construction, changes on the project Direct and coordinate the efforts of multi-disciplinary teams to achieve the Client’s Objectives consistent with the scope of the services to be provided Preparation of the Schedule for the project
CBE formulation and review,
Implementation in the SAP
Review and prepare approval of work break structure to be in line with schedule, CBE requirements and payments via SAP
Finance-Cashflow plan
4
Control Changes on the project in line with engineering and design department Manage costs and formulate strategies to control expenditure, approval of the invoicing
Coordination between client, EPCM, site and office Interacted with client on invoicing, scope, progress, quality Manage project resources and expanses
Project integration & hand-over
Preparation of the reports: weekly -monthly
Review forecast dates in the POP and make shore that is implemented in the program to review critical path of the project from the scope make shore that all changes are correctly presented and implemented on the project THE COMPANY : United Mining Services (UMS) GROUP
DATES : September 2020 –August 2022-Contract finished POSITION : SENIOR PPROJECT CONTROL MANAGER
Overall purpose : Work with clients and stakeholders to define project goals and Overall success criteria for projects to align with client overall business objectives Manage internal costs and formulate strategies to control expenditure to ensure project profitability
Review planning update, cost update, changes of the scope, weeklyfor the project team to effectively communicate if any risks, opportunities and decisions establish simple yet effective project governance guidelines Create and review strategies to maintain project communication including the creation and management of project documents.
Managed relationships with project stakeholders, contractors and the project team On every project in the company identify skills shortfalls and ensure training is conducted to ensure required skills are maintained and developed Ensure all client (project) objectives are met and that projects are delivered on time, within budget and to the required quality.
Develop project organization charts and project management execution plan, to establish lines of accountability and reporting per disciplines. Responsibility: Mentoring and coaching of staff; resourcing of projects as well as reporting and budgeting, planning, costing, procurement, finance, control changes on the projects in line with engineering and design departments. Prepare and maintain documents as per company standards: planning schedule, costing reports, cashflow report, review forecast dates in the POP and make shore that is implemented in the program to review critical path of the project from the scope make shore that all changes are correctly presented and implemented on the project, prepare overall reports-dashboards per project for monthlyreport presentation.
THE COMPANY : EPCM HOLDINGS
DATES : May2020–August 2021
POSITION : SENIOR PROJECT MANGER
2 X Projects -EPC – Solar PV Plant Projects in Somalia Overall purpose : Work with clients and stakeholders to define project goal sand overall success criteria for project to align with client over all business objectives
Manage internal cost sand formulate strategies to control expenditure in order to ensure project profitability
Create an environment conducive to open communication for the project 5
team to effectively communicate risks, opportunities and decisions Establish simple yet effective project governed guide lines Create strategies to maintain project communication including the creation and management of project documents
Prepare communications and report to stake holders at various levels of management
Managed relationships with project stake holders, contractor sand the project team
Identify and manage risks project risks as well as risks to the project Identify skills shortfalls and ensure training is conducted to ensure required skills are maintained and developed
Ensure all client (project) objectives are met and that projects are delivered on time, within budget and to the required quality or Develop project organization charts to establish lines of accountability and reporting
Advise on project resourcing requirements
Responsible for the development of inputs into project cost estimates, scheduling, procurement, finance, workforce estimates, monitoring, and controls
Project integration & hand-over (to operations)
Commissioning coordination between end user and EPC Team building
THE COMPANY : ERG Africa (Eurasian Resources Group)-CLIENT DATES : Oct. 2016–Feb.2020
POSITION : SENOR MANAGER PROJECT CONTROLS
RISK CONTROL MANAGEMENT ONTHEPROJECTS
Comide Minein DR
6
PROJECT MANAGER DRC Based Explorations
(Project November Feb 2019-Feb 2020
Exploration Project RTR Metalkol Mine,in DRC
Overall purpose : Capital Projects duties:
From Desktop Studies, Studies, Pre-Feasibilities,
Bankable Feasibilities to EPCM, or EPC
Underground and open pit mines with a focus in copper base metals in DRC Capital Control, CAPEX and OPEX budget forecasting, direct reporting to Capital Project Director to improve accountability and cash flow Overall leadership of Project Controls/Services
Managers and implement action of controls systems
The Project Controls/Services Manager responsibility for central control of Project Services per training to multiple projects for a single client– “Services”, Controls manager of the project services to major Client, Analyst Specialist-supporting growth, sustaining and improvement project for the Company, Studies, work with multidisciplinary study teams to deliver opportunity assessments for project with investment value from 100Mil $ to 3 Bill $, strong organization skills, with availability to manage multiple task and support a number of projects simultaneously, engage effectively with execution of the project and other project stakeholders. Practice Lead Function/Key Task Headings and Responsibilities: 1. Project Office Set-up and management
2. Monthly, Bi-Weekly and weekly Reporting (Schedule and Cost) 3. Credit Management
4. Statistical Analysis on projects and profitability 5. Cost Management and Cost Engineers Management
6. Budget, Payment and contract Reconciliations
7. Project Scheduling and Schedulers Management
8. Leadership and guidance of Project Controls
/Services Managers – through knowledge share,
training and communication.
9. Service Project Managers directly and
indirectly through Project Controls/Services
Managers
10. Successfully role our Contractin to organization beyond current Client ENRC.
Project Controls/Services Manager function:
Cost control functions: Project costing, reporting, forecasting using the Cost repackage
Construction, review and adjudication of BOQ-Compilation of bills of 7
Quantity and measurement on site.
Financial modeling
Work Breakdown Structure Building and maintenance
Software Requirements Analysis i.e. Costrac, MSP
Integration of controls department
Contract administration : Administration of contract and Employer contracts, inclusive of control of contract document action and application of contractual instruments.
Procurement function from Purchase Order
Requisition to order placement.
This will extend to expediting of orders and the associated quality control. Exploration Project, Project November, in DRC
ManageinternalcostsandformulatestrategiestocontrolExpenditurei norder to ensure project profitability
Createanenvironmentconducivetoopencommunicationfortheprojecttea m to effectively communicate risks, opportunities and decisionsCreate strategies to maintain project communication including the creation and management of project documents
Managed relationships with projects take holders, contract or sand the project team
Identify and manage risks project risks as well as risks to the project Accountability and reporting
Advise on project resourcing requirements
Responsible for the development of inputs into project cost estimates, scheduling, procurement, finance, work force estimates, monitoring, and controls
THE COMPANY : YEM-YEMTECHNOLOGIES-HOLDINGS South Africa DATES : May2016-October2016
POSITION : SENIOR PROJECT MANAGER
Transnet Capital Projects
Proposal Tender No: 3125740-N1MT-4-T010
Design Manufacturing, Supply, Installation and
Commissioning of the Material Handling Equipment of the NGQURA Manganese 16Million Ton Per Annum
(MTPA)Export Terminal Project
Overall leadership of Project Management Services
Managers and implementation of systems for EPCM
Project, strong organization skills, with availability to manage multiple task and support
a number of projects simultaneously, engage effectively with execution of the project and other project stakeholders,preparing final cost and budge of the overall project
8
THE COMPANY : PM CONSULT-South Africa
DATES : Feb2016-May2016
POSITION : PROJECT MANAGER-Proposal Tender
THE MATLA MINE 1 RELOCATION PROJECT
Overall purpose of PCM function:Petrochemical-Plants Projects Mining Projects
Bulk Material Handling
Proposals
Overall leadership of Project Services
Managers and implementation of control ssystem
THE COMPANY : Worley Parsons-South Africa
DATES : August-2012-Jan2016
POSITION : PROJECTCONTROL MANAGER-Styldrift Project
(Anglo- Royalbafokeng,
Rustenburg) Overall purpose of
PCM function:
Petrochemical- Plants Projects
Mining Projects
Bulk Material Handling
Overall leadership of
Project
Controls/Services:
Managers and implementation of controls systems
The Project Controls/Services Manager will be responsible for central control of Project Services per taiming to multiple projects for a single client–“Services”
Controls manager of the project services to major Client Practice Lead Function/Key Task Heading and Responsibilities: Project Controls Office Set-up and management
Monthly, Bi-Weekly and weekly Reporting (Schedule and Cost)Work Breakdown Structure Building and maintenance Software Requirements Analysis i.e. Costrac, MSP
Integration of controls department
Contract administration: Administration of contractor and Employer contracts, inclusive of control of contact documentation and application of contractual instrument.
Procurement functions from Purchase Order Requisition to order placement. This will extend to expediting of orders and the associate and quality control.
(Worley Parsons& client sub-vendors
9
THE COMPANY : FOSTERWHEELER SOUTHARICA
DATES : March2006-August2012
POSITION : PROJECT CONTROL
MANAGERCHIEFPLANNINGEN
GINEER
SUPERVISES : PLANNING ENGINEERS,
COSTING ENGINEERS
PROCUREMNT,
ESTIMATIENGINEERS
QA/QC DELIVERABLE
SCONSTRUCTION
ProjectFTWax–Phase1andPhase2–EPCm-Sasolburg
Projects Sasol-Secunda and Sasol-Sasolburg EPCm to 2018 Growth- Sasol Secunda
Senmin Project Sasolburg-EPCm
Project- Pande Project SASOL-
International-EPCm Mozambique
Project-Natref –Alky-Sasolburg-EPCm
Project-Feasibility Study Project-Secunda SASOL
Project-AAA–Sasolburg-SASOL
Project- Songo- Songo Tanzania
Project-FTDR–Sasolburg-EPCm SASOL
Project -AFROX Projects : Richards Bay, Cape
Town, Durban, Johannesburg, Sasolburg, Secunda,
Project-Petronet–EPCmTarlton
Project -NG183-Mozambique-Sasol-
EPCmProject-STS4-CompressorHouse
THE COMPANY : Halliburton-KBR
DATES : September2003-March2006
POSITION : Senior Planning Engineer
Senior Costing and Estimating Engineer
Project- Super-flex-Turbo Project SASOL- Secunda
Project-PVC –Sasolburg
Project-Bitumen plant Durban
JOBDESCRIPTION : Responsible and Accountable for the following accomplishments:
Scheduling and Reporting to Houston
Fluor-KBR Interface Scheduling Updating
of Weekly and Monthly Reports
Familiarity with contract documents, general
conditions, Special conditions, scope of work,
contractual drawings, etc. Monitoring of
weekly/monthly reports and progress charts by
weighing quantities and construction man hours
Monitoring of Contractors progress and analyzing on weekly basis and report any deviations and items of concern Familiarity with Site Health, safety and Environmental policies and procedures
Monitoring delays work priorities at weekly bases
Evaluate engineering and procurement delay and analyses 10
the effects on the overall schedule and construction schedule Propose methods to accelerate construction and to make up for lost time
Monitoring actual number of the contractor trades manpower on a monthly basis from LMS and report any deviations Maintain a summary manpower chart of the total trade in the area
Thorough monthly review and analysis of schedule of work to complete and WBS
Attend all meetings, with could affect the schedule System prepared from the project procedures Ensure and maintain a climate trust, confidence and team spirit Analyze and evaluate extension of time and time compression Claims from Contractors Resolve technical problems
THE COMPANY : BHPBILLITON-SNCLAVALIN-MURRAY&ROBERTS DATES : February 2001-August 2003
POSITION : Lead Planning Engineer
Senior Costing and Estimating Engineer
Project: Aluminum Smelter - Hillside 3 Expansion Project in Richards Bay South Africa (Basic Eng. and EPCM Phase) JOBDESCRIPTION : Responsible and Accountable for the Following accomplishments:
Familiarity with contract documents, general conditions, Special conditions, scope of work, contractual drawings, etc. Monitoring of weekly/monthly reports and progress charts by weighing quantities and construction man-hours
Monitoring of Contractors progress and analyzing on weekly basis and report any deviations and items of concern Familiarity with Site Health, safety and Environmental policies and procedures
Monitoring delays work priorities at weekly bases
Evaluate engineering and procurement delay and analyses the effects on the overall schedule and construction schedule Propose methods to accelerate construction and to make up for lost time
Monitoring actual number of the contractor trades manpower on a monthly basis from LMS and report any deviations Maintain a summary manpower chart of the total trades engaged in the area
Thorough monthly review and analysis of schedule of work to complete and WBS
Attend all meetings, with could affect the schedule Adapt the filing system prepared from the project procedures Ensure and maintain a climate trust, confidence and team spirit Analyst and evaluate extension of time and time compression Claims from Contractors
Resolve technical problems
THE COMPANY : ETS CONSULTING-Exclusive Tech.Services DATES : February 1998-January 2001
POSITION : Project Control Manager responsible for Planning, Costing, Finances, Estimating,
11
Procurement,
Fabrication and delivery to Site
Various projects
Project joint venture-Bateman- TWP-Anglo-
American-platinum main Mandashook Project –
Witbank
JOBDESCRIPTION : Responsible and accountable for the following Accomplishments: Estimating/ Costing Projects
compiling and/or verification of Bill of Quantities Setting up and completing price sheets and projects evaluation sheets
Familiarity with contract documents, general conditions, Special conditions, scope of work, contractual drawings, etc. Monitoring of weekly/monthly reports and progress charts by weighing quantities and construction man-hours
Monitoring delays work priorities at weekly bases
Evaluate engineering and procurement delay and analyses the effects on the overall schedule and construction schedule Propose methods to accelerate construction and to make up for lost time
Maintain a summary manpower chart of the total trade in the area Attend all meetings, with could affect the schedule Adapt the filing system prepared from the project procedures Ensure and maintain in a climate trust, confidence and team spirit Analyses and evaluate extension of time and time compression Claims from Contractors
Resolve technical problems
THE COMPANY : WETBACK CONTRACTORS(PTY)LIMITED
DATE : June 1997-January 1998
POSITION : Project Manager
JOBDESCRIPTION : Cost estimating of projects on various contracts Controlling of cost on the projects Document control compiling the final documentation for projects Extracting Components and quantities from drawings and providing a total preliminary cost budget for a project Compiling and/or verifying of bill of quantities
Setting up and completing of price sheets and project evaluation Sheets Issuing of day work
Setting up and maintaining filing system for a project Obtaining technical information, flow diagrams and layout drawings from the engineering department
With assistance of the technical department supply flowdiagrams, technical information and calculations
Compiling the final project document/offer to customer and coordinating inputs from different departments
Assist contract administrator with the resolution of claims THE COMPANY : UHDE ENGINEERING (PTY)LIMITED-Project DATES : May 1996 to November 1997
POSITION : Site QA/QC Representative
12
Polyline PVC Plant Midland – Sasolburg, Petro-chemical industry JOBDESCRIPTION: Hot, cold and sound isolation and corrosion protection on pressure vessels, piping and heat exchangers, painting Preparation of quality control related documentation Preparation of back-up information for project hand over to the Client
Monitoring the Process Plant construction according to The specifications
THE COMPANY : SYDCOR ENGNEERING (PTY)
DATES : April 1994 to May 1996
POSITION : Developing Engineer /Field Engineer
Aluminum Smelter –Hillside, RichardsBay
JOBDESCRIPTION : Estimating cost of projects for project support R50Million - Material and documentation control for mechanical and piping installation, Coordination of transport and logistics activities Preparation of quality control related documentation Liaison with sub-contractors
Scheduling Costing, estimating for mechanical, piping, structural steel, insulation and pipe supports, commissioning activity THE COMPANY : IKOMMINTIND.OFNON–FERROSMETALS
DATES : January 1992 to March 1994
POSITION : Project Engineer
Various projects
JOBDESCRIPTION : Design o f tools and jigs for various fabrication Processes (pressing, punch pressing, deep
traction and extrusion)
Design and development of new Products
Development of the technological procedure and work instructions
Cost analyst
Optimization
Preparation of quality control related document action Liaison with the sub-contractors, Drawing office supervision Upgrading and standardizing fabrication procedures Coordination of the workshops activities
THE COMPANY : SAVAMANUFACTURINGCOMPANY
DATES : August 1990 to January 1992
POSITION : Design, Development Technologist (in theHead Office) JOBDESCRIPTION : Design and preparation of pressure vessels, heat exchangers and steelwork/plate work fabrication
Supervision of mechanical and steelwork creation
handling of design modifications, Liaising with
client, Project Management
References:
13
_
Maphoto Mariri - Mine Manager
Phone: +27-66-485-****
Leslie Lambani - Senior Project Engineer
Phone: +27-61-165-****
Conly Levele - Senior Project Control Manager
Phone: +27-76-714-****
James Keir - Principal Consultant
Phone: +27-83-654-****
Jonathan Borthwick - Senior Civil Project Engineer Phone: +27-83-297-****
Gareth Lawrence - Senior Project Manager
Phone: +27-82-369-****
Barry Venter - (Project Manager
Phone: +277********
Pramod Mitha - Senior Project Control Manager
Phone:+278*-*******