Post Job Free
Sign in

Mechanical Engineer Project & Maintenance Specialist

Location:
Singapore, Central Singapore Community Development
Posted:
December 07, 2025

Contact this candidate

Resume:

S. VELPANDI

BLK ***

#**-*** ****** **** ****** *2,

Singapore-640 524

Email : *********@*****.***

Mobile :+65 8489 6939

CAREER OBJECTIVE

To complement Company’s effort in achieving its goals and objectives at all times in striving to provide outstanding works results by applying the knowledge, experience and discipline I have gained in the field of Mechanical Engineering. WORK EXPERIENCE

ENGINEER (Project & Maintenance) – Jan 2024 to At Present ADDCEL ENGINEERING PTE LTD

Projects Involved:

Project: SIMEX Upgrading Project & TAR4 (Shutdown)Works

(Piping & Structure)

Client: Evonik Methionine SEA Pte Ltd (Jan 24 to June 24) Project: Plant Maintenance Works (Equipment Replacement, Piping, WWTP Modification works, EAV system, etc)

Client: Banyan Cavern Storage Services (May 24 to at present) Project: Plant Shutdownd works ( Reactor Coil repaire / replacement) & Exhaust Air Duct modification works.

Client: BASF Singapore Pte Ltd (Sep 24 to Oct 24)

Project: NESTE SGX150 HOT OIL HEATER project & Shutdown Works

(Piping & Structure)

Client: NESTE Oil Singapore Pte Ltd (Nov 24 to at present) Duties and Responsibilities:

Part of Project management team reporting to Project Manager.

Arrange the relevant Training for the work crew (SIC, Inhouse Training)

To review the SOW and Contractual documents and tender clarification of the project

Conduct the KOM and prepare the presentation for construction studies for the each critical works to client.

Conduct regular meetings and receive / record MOM from package vendor

To assist to costing team for budget preparing based on Tender costing breakdown.

Evaluation with different vendor for them scope of work and work completion.

Preparation of Method Statements & Risk Assessments for various installation works.

Preparation of Lifting Plan, Rescue Plan and other project deliverables.

Coordinate with QC and safety team to share the work scope and work together.

Conduct Material Take off (MTO) and management of list of Materials, to follow up the procurement to deliver.

Materials Purchase as per the project requirement, and Ensure Materials availability at site.

Preparation, Implementation and follow up the Project Execution schedule and report.

Monitoring the progress of Engineering Drawing & project fabrication works

Monitoring and assist of site construction team for installation, Testing, Commissioning works.

Identify Engineering problems and ensure solution are implemented.

Project, Co-ordinate with Clients, Procurement, Engineering and Sub – Contractor.

Follow up the Schedule, coordinate and Monitor, practices QA/QC policies, performance standards and specification.

Organizes documents required to pull out the spool from fabrication shop to paint shop and arrange the painting inspection coordinate with client.

Arrange the site walk and attend the weekly progress meeting with client and Quality personnel review the report get feedback from them and improve the progress/work accordingly.

To prepare the Test package and Tie in list for commissioning.

To plan the hydro test and prepare the required fittings and equipment’s are readily available on time at site.

To arrange the pre-PSSR and final walkdown for the package and Handover to client.

Preparation of Variation order and quotation if the job is in out of scope.

To attend the tender sites walk, to understand the works scope and report to Project Manager for prepare cost for Quote submission.

Prepare the Budgetary quote for new tender and submit to PM for review.

Co-ordinate with third party to get the quote for other trade work & Equipment cost, for tender submission.

Liaise with third party contractors to ensure all equipment is fit for use (like LEW, Rental services, Machinery monthly inspection) PROJECT ENGINEER – December 2019 to Dec 2023

HAILECK ENGINEERING PTE LTD

Projects Involved:

Project: SO2 Piping Management Project (Piping & Tankage) Storage Tank (T88) Rejuvenation Projects (Dec 19 – Mar 21) Client: SEPL at Pulau Bukom.

Project: FEB – Wave 1 & WAVE 2 project (Apr 21 – June 22)

(Piping & Tankage -9 Tanks)

Client: COPL at Jurong Island.

Project: Evolutive Vaccine Facility Project (May 22 - Dec 22) Client: Sanofi & Pfizer at Tuas

(Storage Tanks Fabrication @Shop & Site Installation 8.6Dia/28T - Tank Maneuvering via Road for installation ) Project: Storage Tank Rehabilitation works (Tank Cleaning & Repair works)

(Aug 22 – Dec 23)

Client: Chevron Singapore Pte Ltd @ 210 Jalan Buroh.

(Piping, Structure, Storage Tank and CM works)

Project: FEB – Wave 3 project (Apr 23 – Jul 23)

(Piping & Tankage -3 Tanks)

Client: COPL at Jurong Island.

Project Postponed _Engineering Works only done***) Duties and Responsibilities:

Part of Project management team reporting to Project Manager

Understand project requirements / milestones / schedule / scope / overall project contract

To manage packages / vendor for their scope and delivery schedule and resolve conflicts if any

To review the SOW and Contractual documents and tender clarification of the project.

Conduct the KOM and prepare the presentation for construction studies for the each critical works t client.

Conduct regular meetings and receive / record MOM from package vendor

To assist to costing team for budget preparing based on Tender costing breakdown.

Evaluation with different vendor for them scope of work and work completion.

Coordinate with QC and safety team to share scope.

Preparation of Method Statements & Risk Assessments for various installation works.

Conduct Material Take off (MTO) and management of list of Materials & Ensure Materials availability at site.

Preparation, Implementation and follow up the Project Execution schedule and report.

Plan monthly work Schedule and Set productivity to be achieved.

Monitoring the progress of Engineering Drawing & project fabrication works.

Monitoring and assist of site construction team for installation, Testing, Commissioning works.

Identify Engineering problems and ensure solution are implemented.

Raise up the Technical Query to the response person from client and propose the Solution as per approved standard (API / ASME).

Project Co-ordinate with Clients, Procurement, Engineering and Sub – Contractor.

Initiate and undertake action to prevent the occurrence of non –conformity.

Ensure timely provision of information from suppliers to satisfy interface requirements and allow timely completion of overall engineering and procurement process

Follow up with vendor on Interface management and Technical Data requirements

Instruct to vendor package in alignment with Project management team and Owner / Client instruction

Follow up the Schedule, coordinate and Monitor, practices QA/QC policies, performance standards and specification.

Provides Delivery order of the spool to Painting and ensure to follow as per the client requirements.

To involve the Valve replacement and Mixer / Actuator replacement activities within the time period.

Follow up the Valve and other equipment for servicing / calibration by different vendors.

Arrange the site walk and attend the weekly progress meeting with client and Quality personnel review the report get feedback from them and improve the progress/work accordingly.

Supported production and construction team in checking and resolving on site issues.

To prepare the Test package and Tie in list for commissioning.

To plan the hydro test and prepare the required fittings and equipment’s are readily available on time at site.

To arrange the pre-PSSR and final walkdown for the package and Handover to client.

Instruct to vendor package in alignment with Project management team and Owner / Client instruction for special equipment’s (EH, Level Indicator, etc)

Interact daily with the clients to interpret their needs and requirements and represent them in the field.

Preparation of Variation order and quotation if the job is in out of scope.

Tender sites walk, to understand the works scope report to Project Manager for prepare cost for Quote submission.

Liaise with third party contractors to ensure all equipment is fit for use (like LEW, Machinery monthly checking)

PROJECT ENGINEER – April 2019 to August 2019

YSB Construction & Trading Pte Ltd

Project: Jetty gangway structure Replacement @Sebarok Project : Fencing works around terminal @Sebarok

Project: Roof Water proofing works @Sebarok

Project: Tank Upgrading Project at Vopak & SPC @Sebarok

(Fire Water Line Replacement & Tank Repair works)

Duties and Responsibilities:

Directly reporting and working under supervision of the project/site manager.

Conducts line checking for evaluation of progress in site piping erection and fabrication.

Develop method of statements and test packages prior to construction.

Coordinates with Quality Control Group for inspection of finished Test Packages and relays the documented comments/punch list to the site supervisor handling the Test packages involved.

Documentation of piping reports, Request for Inspection, and Test Packages.

Relays documents such as Request for Clarification, Revised Isometric Drawings to the site manager.

Making As-built drawings.

SITE COORDINATOR (Works & Materials) – July 2017 to March 2019 Kaoson Integrated Engineering (Pte) Ltd (AEDGE Group) Duties and Responsibilities:

Directly reporting and working under supervision of the project/site manager.

Coordinate with various client for site visit for scope alignment and update to manager.

Arrange the meeting with different works supervisors (Scaffolding & Insulation) and finalize the work schedule and MTO Preparation.

Coordinate with Store supervisor, all the materials are readily available.

Arranging the delivery to site required Materials & Equipment on right time.

Evaluate the progress completion at site and assist to costing team for claiming.

Involve the site admin activities for various sites.

Attend the Monthly HSE meeting with Management and cascade the information and sharing to site team.

Arranging inspection for Electrical Equipment’s.

Maintain the Inspection record for lifting Gears and other accessories and ensure all are valid and arranging for Calibration / Recertification, if required. ASSISTANT ENGINEER(India) – June 2013 to May 2017

Balaji Industrial Pvt Ltd

Wind Care India Pvt Ltd (GE Power &Energy_ Contract) TRAINING/SEMINARS ATTENDED

• Manage Work Place Safety and Health in Construction Sites (CSCPM)

• Project Safety Management Course for SP Group sites

• Basic Project Management in Oracle Primavera V20

• Assess Confined Space for safe Entry and Work

• WSQ-Supervise Work in Confined Space Operation

• Personal Fall Prevention Equipment Inspector

• Managing Work -At -Height

• WSQ-Develop a Risk Management Implementation Plan

• WSQ-Supervise Safe Lifting Operations

• WSQ-Supervise Workplace Safety & Health in Process Plant

• WSQ-Supervise Construction Work for WSH

• Valid Singapore Driving License – Class 3C

KEY SKILLS

• MS Word

• MS Excel

• MS Power Point

• Primavera P6

• Outlook

• Aconex (Project Doc. Management _Lendlease)

DECLARATION:

I here declare that all the details furnished true to the best of my knowledge. Thanking you.

Yours sincerely

Date: 15-Jun-2025

Place: Singapore VELPANDI S

Mobile No: +65 8489 6939



Contact this candidate