ENGR. JAMIL AHMED
Cell +966*********/009***********
E-mail: **************@*****.***
Iqama: Transferable with KSA valid driving license As a Professional Senior Mechanical Engineer, I have served in KSA for 17 years of construction experience in various infrastructure and oil gas construction work with diverse types of mega projects such as Highway Roads Pumping stations, Power & Water transmission line systems, water storage tanks, wastewater treatment plants (STP), Potable line & drainage distribution lines, irrigation lines, Seawater Desalination plant process & power plant, High rise building, heat & ventilation Airconditioning work (HVAC), Firefighting pipeline work, & infrastructure projects PMC/CM work in Saudi Arabia. Project’s summary
• Senior Mechanical Engineer in (Infrastructure works) in DSQ project Riyadh in AECOM ARABIA
• Site Field Mechanical commissioning Engineer in Mining & Metals Gold Project as PMC role in Bechtel engineering company
Saudi Arabia
• I worked as a site Mechanical Engineer in a Desalination plant in Jeddah's western region area in Jizan with SWCC with a capacity of 850000m3/day at Furazan Island with Dar Engineering Company
• I have worked as a Site Mechanical Engineer at al-Khatib & Alemi Saudi Consolidated Engineering Company, Saudi Arabia for SWCC Strategic reservoirs projects in Makkah.
• I have worked as a Site Mechanical Engineer in NKY Consultant Architecture Contracting Company in King Abdullah Project –KAP2 (Ministry of Interior – Military & forces Project) for high-rise buildings in Riyadh & Al Baha areas
• I have worked as a Site Mechanical Engineer for 380KV/132KV substation work in Saudi service Electromechanical Works Company (SSEM), Saudi Arabia (Al-Rashid Group) all over K.S.A
• I Have Worked as a Mechanical Engineer in Aramco Projects in Saudi Arabia at Abdul Ali Construction Company Dammam, Abqaiq, Al Shuaiba
• I have worked as a Mechanical Engineer with SIEMENS (Pakistan) Engineering Company Ltd, at Bhat Gas Filed Project Sindh, Pakistan
• Ambitious, motivated Mechanical commissioning Engineer/ Inspection Engineer Searching for a middle-level position in a leading, national/multinational engineering company.
• Expertise: Pumping installation Piping Fabrication, Steel Structure Steel, Planning, Execution, Tank fabrication, Maintenance, Project Management, HVAC, irrigation network firefighting, water supply and drainage network design and supervision Rotary & static equipment installation, Health and Safety Champion in each project,
•
• Senior Mechanical Engineer Saudi Arabia 11/07/223—Continue. Review the engineering support during construction performed by contractors including. reviewing technical submittals and shop drawings, responding to contractor queries,
• During the site visit Monitoring and safeguarding site Health and Safety performance procedures at the site working area.
STRENGTHS:
•
Work towards enhancing the Management Quality.
• · Problem-Solving monitoring the Progress Percentage schedule as compared to the .
• Checking the daily and weekly progress reports Review the Primavera Planning Schedule Diagnose and resolve technical issues related to compression/power systems to minimize downtime. Prepare, manage, and optimize maintenance budgets, ensuring cost-effective practices while meeting operational project requirements. Career Summary
Career Path
Customer: Diriyah Gate Development Construction & Supervision Project Riyadh
• prepared by the contractor and checking the status as per the standard with covering holidays for project and resource major overhauls of Turbine engines and compressors, including spare parts and vendor colander monitoring the Progress Percentage schedule as compared to the physical percentage of work completed. Coordinate and supervise the work of all mechanical activities and operations.
• Ensure that necessary measures are taken for the preventive and breakdown maintenance of the gas flow measurement stations to minimize downtime and ensure smooth and uninterrupted operations.
• Ensure effective utilization of the manpower and material resources to achieve the departmental objectives.
• Provide technical support to the other regions to ensure that common departmental objectives of accurate gas measurement are met.
• Manage and ensure that calibration of metering instruments at the Point of Delivery and check Metering Station is being carried out by the team to ensure metering accuracy and reliability.
• Manage the routine verification and calibration of pressure and temperature transmitters carried out throughout the region. Supervise maintenance projects to ensure they meet quality and safety standards.
• Manage the installation and commissioning of new metering installations and/or upgrades of existing setups in the region.
• Ensure field activity/maintenance activity reports are duly filled out, signed, and submitted by the team, and documentation records are maintained.
• Ensure that joint meter check activity with the distribution department is carried out in a timely manner for the gas volume recorded at sales metering stations in the region.
• Provide technical expertise and guidance to the team and coordinate field activities related to the installation, startup, and operation of equipment.
• Keep a close check and perform analysis of the data through a remote monitoring system for the identification of problems and ensure that necessary corrective measures are taken in a timely manner.
• requiring design feedback will be directed to the Designer for response. Review responses for overseeing maintenance activities to ensure the reliability and Integrity of compression stations.
• adequacy. Local authorities and ministerial agencies have jurisdiction over the project. Review the Contractor’s mechanical change order proposals.
• Prepare recommendations for the Resident Engineer for review. If warranted, assist in negotiations with contractors regarding changes in contract value. Or project duration. Review contractors’ claims related to mechanical works.
• Prepare recommendations for claims approval or rejection. For review and approval of mechanical submittals, including plumbing pumps and piping systems (drain waste & vent, domestic water), fire protection (pumps, piping, sprinkler heads), HVAC systems (VAV boxes, ductwork, process piping, chiller systems, controls, building management system).
• Monitors construction contractor mechanical installation and testing activities, including piping, leak tests, ductwork & insulation, pumps, building management system, HVAC controls, domestic water systems, foundation de-watering system, etc.
• Ensuring the correct installation of piping, pipe supports valves, and other in-line equipment to the drawings, specifications, and standards. Manage leakage, sewage water, how to reduce non-renewable water, water conservation, Ensure the maintenance of the necessary cleanliness of piping systems and the use of dry air purges here necessary bubbler, water network distribution at all areas of buildings & water utilities in consumption’s area huge quantity.
• As a Field Mechanical Engineer, my core responsibilities are to Coordinate and supervise the work of all Mechanical related activities and operations.
• Receive / Action Request(s) for Information (RFIs) that apply to mechanical works.
• RFIs requiring design feedback will be directed to the Designer for response. Review responses for adequacy
• Take the role of Preparation of Concept Design and undertake technical reviews of complete Mechanical systems for water transmission and distribution systems including reservoirs, pumps and pumping stations, piping, valves, chemical dosing systems, surge protection systems, compressed air systems, fire water systems, irrigation systems, and HVAC systems.
• I Check the Mechanical Engineering support for operational and construction sites/projects.
• Develop a complete scope of Mechanical works, prepare specifications, and quantify related requirements.
• Participate in the procurement of Mechanical devices, equipment, and accessories Rotatory & Static
• Implementing the latest applicable design and engineering Codes & Standards for all Assets of the Project
• I Manage, inspect, test, commission, and document the construction of Mechanical equipment systems
• To Participate in the innovation and implementation of new technologies, particularly water networks & distribution networks
• Bechtel Saudi Arabian Company K.S.A
• Customer: MA’ADEN GOLD AND BASE METALS (MA’ADEN)- PMC Project Mansoura Massa rah Gold Project 01/01/2021 continues.
• As field Mechanical engineer Maintaining and improving Health and Safety practices at site construction work
• As an engineer I can prepare a complete scope of Mechanical works including a detailed design narrative of the works, design drawings, as-builts, specifications, and related quantities documents & make a report.
• Evaluate technical proposals from bidders for related design services or construction works. Planning and scheduling of Mechanical engineering design and design reviews for operational, construction and commissioning activities
• Supervise, inspect, identify, and resolve any related non-conformity in Mechanical engineering design, construction and commissioning activities coming at the site or changes in design.
• Review the engineering support during construction performed by contractors including reviewing technical submittals and shop drawings, responding to contractor queries, evaluating change requests, a n d resolving field issues.
• Ability to utilize the BIM Technology and models in t h e design, construction, and commissioning of the related works.
• During the site visit Monitoring and safeguarding site Health and Safety performance procedures at the site working area
• Assisting in the operation and optimization of the water supply network at the site to the rout wise condition
• As field Engineer, I Review the Contractor’s Mechanical change order proposals during the construction changes.
• I Prepared reports weekly, monthly, and progressive recommendations for the Resident Engineer for review.
• I Prepare recommendations for claims approval or rejection. For review and approval of mechanical submittals, including plumbing pumps and piping systems (drain waste & vent, domestic water), fire protection (pumps, piping, sprinkler heads), HVAC systems (VAV boxes, ductwork, process piping, chiller systems, controls, building management system)
• Monitor’s construction contractor mechanical installation and testing activities, including piping, leak tests, ductwork & insulation, pumps, building management system, HVAC controls, domestic water systems, foundation de-watering system, etc.
• Ensuring the correct installation of piping, pipe supports valves, and other in-line equipment in accordance with the drawings, specifications, and standards.
• During the construction to manage the leakage, sewage water, how to reduce non-renewable water, water conservation,
• Ensuring the maintenance of the necessary cleanliness of piping systems and the use of dry air purges were necessary bubbler, water network distribution at all areas of buildings & water utilities in consumption’s area huge quantity in the Processing plant following work to be followed up.
• Reviewing and checking designs, drawings, and data by other engineers or by suppliers
• Preparation or review of engineering studies and reports
• Preparation or review of material quantity estimates
• Uses engineering computer-aided design/computer-aided engineering (CAD/CAE) tools
• Prepares letters for replies to vendor correspondence.
• Monitors project controls within the discipline.
• Review design documents of equipment manufacturers or subcontractors of a moderate degree of complexity and prepares comments and recommendations.
• To Assist in the preparation of forecasts, quantity take-offs, and change orders
• I Participate in a work environment that is based on openness, trust, communication, teamwork, empowerment, innovation, and satisfaction.
DAR Engineering Company K.S.A
• As Site Mechanical Engineer Company (SWCC/ Jeddah) Saudi Arabia -(1/1/20- 1/1/21)
• Previous work in a Satellite Desalination plant West Coast of Jizan Furazan Island & Qunfudah site 230000M3/day with SWCC Project working on Intake tower offshore grp pipeline, Gravity filter, Back wash tank, Air scour blower, Ro Pass-1, RO pass-11, Permeate water tank, limestone filter, product water tank, permeate water co2 storage tank & dosing system, CIP system, chemical dosing system, Neutralization system, sludge settling system, Firefighting tank and Disinfection & PH correction system which includes Pum Wash pump, RO pass pump pressure & High- p r e s s u r e pump, product water pump, CO2 pump, flushing pump, potable pump, service & intake pump worked at checked flow & steel structure supporting & pipel ine lying work construction of tank capacity of 1700000m3 for water storage & work on transmission line from Desalination plant existing tank SWCC plant purpose pipe Día (600mm to 1200mm). Review, all pipe Día HDPE, GIS, SS, GRP, PVC, UPVE ETC approve and process all mechanical technical submittals on shore & offshore work in Farzan Island & Qunfudah in Jizan.
• Lead and Provide e technical support for t he implementation of the SWRO desalination projects, Working as the consultant on owner engineering mission with a specific focus on the site construction supervision of the SWRO desalination Project
• Review the EPC Contractor / OEM's site construction program of the SWRO plant and comments on the practically of implementation.
• Review the method statement of the SWRO Process related equipment and verify its compliance with reference to the project specification, applicable codes and standards, and good industry practice.
• carry out site inspections for the SWRO process equipment as per the ITPs method state montane advice Observation, non-conformity, and punch Points.
• Verify whether adequate supervision from the OEMs is available for all major and critical equipment of the SWRO process.
• Verify whether the interface construction with the Client interfaces other sub – contractor interfaces is constructed in accordance with the drawings and method statements.
• Verify the mechanical completion of the SWRO Plant
• Review the EPC Contractor / OEM documentation on the pre-commissioning, commissioning plants, Procedures, start-up and acceptance tests performance tests, and reliability test procedures.
• Witness the pre-commissioning, commissioning, start-up, and acceptance test for the SWRP Process equipment.
• Witness the performance test of the SWRO Plant, and verify whether the performance guarantees as per
• Witness the reliability run test of the SWRO Plant and advice any major issues noticed in operation of the SWRO key process equipment & chemicals (Ferric Chloride, SBS, Coagulant, Caustics soda, Antiscalant, sodium hypochlorite, polyelectrolyte, CO2, chlorine dioxide, HCL, Naocl2) to use all chemicals to brings better quality of treatment water & equipment safer position manner maintained the water quality process checked SDI & the water quality every day to improve continuity of water supply, increasing environmental compliance.
• Support the OE Construction Manager to verify the functional guarantees and completion of the SWRO plant are met.
• Review the punch list of the SWRO equipment.
• Review the as-built documentation for the SWRO equipment. As Site Mechanical Engineer (SWCC Reservoirs Phase-11 Makkah-Taif Project) Saudi Arabia- (03/03/2019 – 1/01/20)
• Review material acquisitions
• RFIs, submittals, and ensure contract performance measures are met per the position discipline, Raising NCR to maintain Quality.
Evaluate the project construction to ensure compliance with standards for mechanical systems Installation of plant piping and design review according to ASTM, ASME, API 650, 620,510, 570, AWS D 1.1, NFPA, AWWA standards To check the material (Supplied) incoming of the tanks in the light of the packing list and drawing & to report to my chief about any missed items or incorrect material such as: checking the shell course sheets; thickness; quantities; its dimensions.
• Implementation & development of Commissioning plans & procedures
• Assists in engineering design drawing reviews.
• Interacts with contractors and interprets design and specifications.
• Deals with clients and tries to resolve problems within the scope of the design.
• Conducts site observation surveys and prepares field reports on the status of projects and completion of projects with
• respect to compliance with the plans and specifications.
• Prepares punch list reports and determines corrective measures for on-site problems.
• Familiarizes oneself with codes, local project regulations, construction practices, and the latest equipment functional concepts.
• Familiarizes oneself and obeys all the project's safety requirements including specific on-site regulations.
• Communicates all project safety concerns to employees involved in projects.
• Performs routine calculations.
• Applies and reinforces education programs.
Khatib & Alemi Saudi Consolidated Engineering Company K.S.A
• Participates in professional trade associations and societies.
• Acts as project coordinator with other field engineers, coordinating printing, presentation, and administration
• Procedures, Review shop drawings and submittals, Develop MEP test procedures.
• Develop MEP operating procedures, Responds to RFI's when requested by PM Team
• Monitor’s performance of contractors, performs various administrative duties, Performs other duties as assigned. NKY CONSULTANT ARCHITECTS & ENGINEERING COMPANY LIMITED SITE MECHANICAL ENGINEER AL BAHA (11/01/2016- 03/03/2019)
(HOUSING EMERGENCY FORCES BUILDINGS TRAINING PROJECT MINISTRY OF INTERIOR) My duties included:
• The successful execution of the overall high-rise building
• Fuel filling stations petrol/Diesel stations Ventilation, potable, Nonportable, Sports complex, Petrol pumps, Irrigation Plantation system piping, Spuming pool Administration blocks, Training classes, shopping malls, Central kitchen, laundry rooms, Security force main offices, HAVC duct
• Firefighting pipeline, exhaust fan, sewage treatment plant, sewage pipeline, manhole chambers installation scope including supports, painting, testing, and insulation for allocated areas of the site by the project schedule, cost, and other KPIs
• Ensuring the correct installation of piping, pipe supports valves, and other in-line equipment in accordance with the drawings, specifications, and standards.
• Manage leakage, sewage water, how to reduce non-renewable water, water conservation,
• Ensuring the maintenance of the necessary cleanliness of piping systems and the use of dry air purges were necessary bubbler, water network distribution at all areas of buildings & water utilities in consumption’s area huge quantity.
• Ensure that painting is applied correctly to surfaces that have been correctly prepared. Ensure that adequate QC checks are made to ensure the correct coat dry film thickness and adhesion.
• Ensure adequate safety distances during pneumatic testing.
• Organized disciplined, able to perform under pressure and manage multiple priorities and parallel tasks in Saudi Arabia working experience, Make all installation checks before pre-commissioning activities
• Make pre- and post-commissioning checks for all mechanical installations
• Completing checklists provided by the immediate supervisor
• Preparing site reports (related to the progress of testing and commissioning activities)
• Understand the requirement for performance testing of systems/equipment and ensure that the performances are matching project documents
• Understand testing and commissioning method statements.
• Understand the test and commissioning plans
• Insist on testing calibration of testing and commissioning equipment
• To handle and understand the testing and commissioning equipment
• Should know how to take readings from measuring instruments
• Should know to understand the performance requirements of systems/equipment from Project Documents and ask for clarifications
• •Coordinating with Contractors/testing and commissioning agencies
• Noncompromising with the performance Develop the Preferred Supplier List for Lifts (local and international suppliers) Saudi Service Electromechanical Works Company
Position: Site Mechanical Engineer Saudi Arabia (23/12/2012 – 15/09/2015)
• Overall years of Experience in Construction (execution, installation Development of Work instruction, job descriptions, lists & relevant forms in accordance
• Conduction of self and internal audits
• Performing root causes analysis of Non-Conformance Report (NCR)
• In the Knowledge of HVAC Equipment such as Package Units, AHUs, Fans, Pumps, HVAC Ductwork, and Pipework Preventive Maintenance and Schedules, Daily, Monthly, and Annual Checklists, and Record keeping according to ISO-9001 Requirements/ Formats
• Workout and prepare work breakdown (activity list) for new projects
• Provide Technical Assistance to the construction team as needed. Review material acquisitions, RFIs, and submittals, Duties and Responsibilities:
Planning, Scheduling, and Procurement on Power Plant Workshop and ensure contract performance measures are met per the position discipline. Raising NCR to maintain Quality Evaluate the project construction to ensure compliance with standards for mechanical systems Installation of plant piping and design review according to standard, ASTM, ASME
• Working experience on Different Standards. (API 650, 620,510, 570 GB standard, ASME, ASTM, AWS D 1.1). NFPA, AWWA
• Supervisor, for tank erection for in al Qassim power plant & SWC water transmission distribution
• To check the material (Supplied) incoming of the tanks in the light of the packing list and drawing & to report to my chief about any missed items or incorrect material such as: checking the shell course sheets; their thickness; quantities; and dimension
Abdul Ali Alajmi Company Saudi Arabia
Mechanical Engineer Highway Roads and Asphalt Plant over all KSA (07/2010- 12/2012)
• Understanding of Isometrics, P&IDs, General Arrangement Drawings (GAD), Isometrics marking, cutting plans, BOQ and Welding calculations
• Extraction of BOQ/Material Take Off from isometrics,
• Inspection of all incoming material including pipes, fittings, consumables, and valves
• Responsible for all activity’s QA/QC regarding Piping
• Discussion with the client regarding any piping modification
• Maintain the piping fabrication & installation record
• Raise the Corrective Action Request if observing any Violation of QC procedure
• Inspection of the welding including Gas tungsten Arc Welding (GTAW), Shielded Metal
• Discussion with the client regarding any piping modification
• Ensure full compliance with company safety regulations and HSE management systems
• Provide prompt supervision and technical Oversight during the installation of the Firewater Network Line for Refinery Up gradation project
• Joint inspection of underground pipelines and preparation of Dossier to hand over to the Client
• Complete refurbishment of the Storage tank and replacement of foam lines
• Fabrication welding and installation of piping system of pumps
• Re-routing of above and underground pipelines during Site clearance of the Refinery Up gradation project
• Construction of new storage tanks along with its associated piping Siemens Engineering Construction Company Ltd, Karachi Pakistan As Site Mechanical Engineer Eni Gas Filed Project Sindh Pakistan -(05/2008 – 06/2010)
• Problem-Solving monitoring the Progress Percentage schedule as compared to the
• physical percentage of work completed knowledge in turbo machinery, Gas Turbines, gas compressors, Gas Generators, and Auxiliaries such as vibration and oil analysis.
• Checking the daily and weekly progress reports Review the Primavera Planning Schedule Diagnose and resolve technical issues related to compression/power systems to minimize downtime. Prepare, manage, and optimize maintenance budgets, ensuring cost-effective practices while meeting operational project requirements.
• prepared by the contractor and checking the status as per the standard with covering holidays for project and resource major overhauls of Turbine engines and compressors, including spare parts and vendor colander monitoring the Progress Percentage schedule as compared to the physical percentage of work completed. Coordinate and supervise the work of all mechanical activities and operations.
• Receive / Action Request(s) for Information (RFIs) that apply to mechanical works. RFIs Manage and ensure safe, reliable, and efficient operations of natural gas flow measuring equipment installed and operated in the region Gas Bhit Eni Plant manage Revenue and Capital budgets for maintenance activities
• Ensure that all insulation materials are correctly applied. To ensure that cryogenic pipe insulation is applied with the correct vapors barriers and that cladding does not use screws that penetrate the vapors barrie Ensure that testing is carried out using the correct medium i.e., pneumatic on all systems unless they contain water or steam.
• Ensure adequate safety distances during pneumatic testing.
• Ensure that all oxygen closing welds are inspected and signed off and that records are adequately kept of these inspections!
• Ensure all necessary QC checks are carried out and weld quality processes are maintained. Ensure that all documentation is compiled as construction progresses and that this is checked and completed.
• Provision of emergency overflow to off-spec ponds and construction of off-spec storage facilities.
• Final effluent storage, sludge treatment, and intermediate storage and auxiliary systems; All buildings, tanks, civil, mechanical, and electrical works included in the FEED design.
• Ensuring the correct installation of piping, pipe supports valves, and other in-line equipment to the drawings, specifications, and standards.
PAINTING & INSULATION:
Duties and Responsibilities:
Major Jobs Executed:
Painting: I have also worked as an Engineer in the Painting of piping & equipment (Anti- anti-corrosive coatings). Responsibilities:
Responsible for carrying and verifying the work at various construction points Such as Ensuring surface preparation.
• Surface preparation performing
• Monitoring of weather conditions
• Evaluation of compressor (Air cleanliness) and surface preparation equipment.
• Ensuring availability of arrived painting material as per approved project specifications.
• Managing witnessing & Inspection of painting mixing.
• Determination of Dry Film Thickness using a DFT meter before the inspection Project Management Related Activities.
Monitors Contractor's submittals to local authorities and ensures that they are carried out promptly by the contract document.
Got three times the “Performance of Excellent Demonstration” letter from My Directorate.
• Analyze and communicate complex ideas clearly and concisely.
• Self-motivated and enthusiastic with proven teamwork
• Excellent verbal communication and planning skills
• User-level computer skills like Internet, Office applications
• Ability to work unattended in long shifts without losing concentration.
• Well organized and able to plan and prioritize accordingly.
• Microsoft CAM
• Microsoft Office Applications
• AutoCAD-2010 for Drawing
• Bachelor of Engineering in Mechanical Engineering May 2008 AFFILIATED WITH PAKISTAN ENGINEERING COUNCIL
PEC REGISTERED NO ME /21189
AFFILIATED WITH SAUDI ENGINEERING COUNCIL
SEC-REGISTERED NO ME -127402
AFFILIATED WITH THE HIGHER EDUCATION COMMISSION OF PAKISTAN HEC REGISTERED NO ME- /1773/04ME72
HEALTH & SAFETY ENGINEERING COURSES UK
1 FIRE FIGHTING COURSE REGISTERED IN UK
(URS)
2 IOSH Safety Management Course.
3 SCAFFOLDING SAFETY
4 CONFINED SPACE SAFETY.
5 HAZARDS COMMUNICATION,
From Karachi Safety International Trends Institute. PMI Project Management Professional Member ID: 956264 Project Management Professional (PMP)® ID 9562640
Risk Management Professional (PMI-RMP)® PMI ID: 9562640 APPROVED
2. APPROVED FROM MOI (MINISTRY OF INTERIOR) SAUDI ARABIA. 3. APPROVED FROM SEC (SAUDI ELECTRICITY COMPANY). K.S.A 4. ARAMCO PLANT ERRECTION SECTION ENGINEER
5. APPROVED AS MECHANICAL ENGINEER SWCC PROJECT KSA Exceptional command over written and spoken- (English, Urdu, Sindhi, Arabic) QUALITY IS MORE IMPORTANT THAN QUANTITY
AWARDS & ACHIEVEMENTS
KEY SKILLS
COMPUTER SKILLS
EDUCATION
PROFESSIONAL CERTIFICATIONS