Post Job Free
Sign in

Senior Engineer Project Management

Location:
Mysore, Karnataka, India
Salary:
9 lakhs/Annum
Posted:
August 19, 2025

Contact this candidate

Resume:

An enthusiastic Senior Engineer eager to contribute to the organization's success through diligence, innovations and analytical skills. Motivated to learn, grow and excel in cross-functional roles involving analytical and strategic challenges.

Year

Course

College/University

Percentage/CGPA

2004-2008

B.E-Electrical & Electronics Engineering

Golden Valley Institute of Engineering (GVIT)

68.8%

2001-2003

12th (PUC)

Sharada Vilas College

62.4%

2000-2001

10th (SSLC)

BEML High School

72.77%

EDUCATION

WORK EXPERIENCE

Duration

Organization

Title

April/2023-To-Till date

Bhoruka Extrusions Private Ltd, Mysuru

S Senior Engineer (Utility & Shift Maintenance)

Jan/2022-Mar/2023

Siderforgerrossi India Private Limited, Mysuru

Asst. Manager

Dec/2020-Feb/2022

GRS Engineering Private Limited, Mysuru

Senior Engineer

Aug/2017-Dec/2020

Carlsberg India Private Limited, Mysuru

Executive-Electrical (Utility Maintenance)

June/2011-Aug/2017

JK Tyres and Industries, Mysuru

Electrical & Electronics -Shift Maintenance

Aug/2008-June/2011

BMM Ispat Limited, Hospete

Utility & Planning Engineer

PROFILE SUMMARY

Performance-driven professional with over 15 years of rich & extensive experience in Strategic Electrical Maintenance Engineer Involved in Electrical Installation, Utility Management, Manufacturing, Project Management, Client Engagement, Budgeting, People Management, Technical Support for Business Management.

• Led productive cross-functional teams and coordinating with Project Management using interactive and motivational leadership that spurs people to willingly give excellent results.

• Planning and Priorities to develop maximum number of projects which is aligned and completing within time durations.

• Skilled in planning and effectuating preventive & predictive maintaining schedules of various equipment/ to increase machine uptime and equipment reliability

• Swiftly Executed Greenfield projects with competent cross-functional skills and ensuring on time deliverables within pre-set cost parameters.

• Preparation of technical document for Contractor deployed at site.

• Excels in monitoring & tracking area wise power consumptions on daily basis also Implemented EMS for Continuous Monitoring of Power Consumptions at different Process areas.

• Hands-on experience in periodical Inspection of Electrical Installation Equipment (Observation done by Government officials like CESC and BESCOM), which relate to Safety and electric supply within the due date time and submitting Form-G monthly of Both 1010 KVA and 750 KVA DG Sets and KERC Submitting of Document above 5 MV to Govt. Official.

• Reports on Engineering Activities which needs to be highlighted to the senior Management and Engineering Key Performance Indicators of Various Engineering Parameters (KPI’s).

• Pivotal in lean TPM such as 5S, PMS, GEMBA KAIZENS and GEMBA WALK.

• Worked on Siemens software TIA protocol Software V14 & V15, Simentic Step 7 V 5.5 for S7-1500 PLC for Communicating Between Buhler and Brew House Areas.

• Merit of being nominated as Department DSR which operates a Safety Works in Engineering Department and also functioned being as a Safety Ambassador and Achieving cost target in a timely manner.

• A strategist & implementer with recognized proficiency in spearheading business to

accomplish corporate plans and goals successfully.

• Coordinating with Finance Team for cost control of projects for contractors and OEM’s during Green Field Projects.

Hands on Experience for Installing and Handling Electrical Furnace up to 60 KW and Installation of Panels and Trouble Shooting of Equipment’s

Worked on Doosan VMC Machines/AMS MCV-400S/MTE Machine (Conversation of Siemens to NUM Drive and Configuration for the same) and Trouble Shooting of equipment’s.

Worked on 2500T Press Motor (Slip Ring Motor) up to 160 HP Motor and Trouble Shooting of Equipment’s.

Installation of 750 KVA Control Transformer by Designing the cable sizes and Panel

Accessories for INDUCTION BALLET HEATER [IBH] application.

INTERNSHIPS / ACADEMIC PROJECTS

Instituting & executing maintenance strategies, making high-stakes decisions and overcoming complex

business challenges using experience-backed judgment, strong work ethics and irreproachable integrity;

looking after LT, HT panels, commissioned up to 60 KVA UPS for motor and IT Applications and maintaining

100% machine availability when required

Collaborating with

• Stakeholders while keeping them informed of progress & issues in order to manage expectations on

all requirements and deliverables

• Consultant Team and Updated the P& ID Drawings as per required site conditions

• Government Officials for Smooth supply without much power interruptions

• Vendor for Smooth Completion of Assigned projects/Activity within the time Duration

Planning and Priorities to develop maximum number of projects which is aligned and completing within time

durations.

• Skilled in planning and effectuating preventive & predictive maintenance schedules of various

equipment/ to increase machine uptime and equipment reliability

Creating & sustaining a dynamic environment that fosters the development opportunities and motivates the

high performance amongst team members

Managing project baselines and controlling them with respect to cost, resource deployment, time overruns

and quality compliance to ensure satisfactory execution of projects

Identifying areas of obstruction/ breakdowns and taking steps to rectify the equipment through application

of troubleshooting tools

Organizing/ participating in review meetings for evaluating project progress & de-bottlenecking

Ensuring effective implementation of:

• Timely schedule of PM activity of weekly, Monthly, Quarterly and yearly

• GEMBA KAIZENS for Power Savings reductions with leads to savings cost in Indian Rupees

Contributing towards Civil Constructions of the Power Room and MCC Room During Project Stages; also Zebra

Cross, Humps, Convex Mirrors Provided at Different Locations Depending Upon Site Conditions

Commissioning:

• Fire Alarm Security Systems and Fire Hydrant Systems in Plant Area with vendor, now running

successfully

• Installed up to 60 KVA UPS for Different Motor Applications and 15 KVA UPS for IT Applications

• 2.6 MVA Transformer of 11 KV/415 V transformer also involved in Maintenance of Monthly/Weekly

and Yearly maintenance Activity.

• 750 KVA and 1010 KVA DG and wiring done between Auto Change over Between EB and DG and also

activity involved in B Check and C Checks Maintenance Activities

• MCC Panels up to 4000A Breaker

Tracking of:

• Individual equipment and scheduling of monthly/weekly/yearly preventative maintenance activities

• Daily KPI’s such as Power, pf, Power losses and Area wise KPI’s

Installing VFD and Soft starters for different motor Applications

Contributing towards maintaining area wise electrical critical spares management and planning of

minimum/maximum spares as per required applications without hampering

Representing Town Hall Meetings on Behalf of Engineering Team

Facilitating:

• Automatons Activity as per COM guidelines and Monitoring and Tracking of Breakdown, Losses and

Area of Improvement by doing GEMBA WALK, PMS Board and by doing Lean TPM

• Our motto ‘’No Job is more important than we perform with our safety other than anything”

• As a Department DSR held Monthly Safety Review Meetings Headed by PM

• Sharing of Electrical Safety Videos to all the team members and to get motivate among team member SOFT SKILLS

SAP, MS Word, Navision, Citrix, ERP implementation, MS Excel & MS PowerPoint from notepad to HTML conversion

TECHNICAL SKILLS

Asst. Manager, Electrical Maintenance, Utility Operations, Maintenance Manager, Facility Management, Stakeholder Management, Project Management, Instrumentation & Process Control, Installation Erection & Commissioning Budgeting& Cost Control, Cross-functional Coordination, Civil Construction, Contractor Documentation

AWARDS AND RECOGNITIONS

Quarterly-Q2 Award for “Project-Reduction in Electricity Power” which was implemented in overall

plant for continuous improvement

• Monthly “Well Done” Certificates for implementing, tracking. monitoring, savings, Execution

individually and with team, and so on

• Gold Awards in Kaizen Competition at regional level quality circle form of India for “Energy P2-

reduction in vacuum fluctuation in curing area”

• Gold Award in kaizen competition for “Curing P2-Segment CAM modification for China presses for

press auto closing” presented on the half of JK tyres consisting of 03 members

• Gold Award in Kaizen Competition at Regional Level in Quality Circle Form of India for

*Modifications Done in From Old DPLC to Siemens 1200-PLC in all 18 Skoda Presses in RTP Consisting of 03 Members.

Different type of Low voltage contactors & relays worked on thyristor based soft starters for

Motors, worked on ABB, Siemens and Allen Bradley variable frequency drives

*Undergone training on S7-300 of Basic PLC configuration, programming and troubleshooting

Date of Birth

02 October 1985

Permanent address

Flat No.114, Sankalp Magnum Apartment, Vishweshwar Nagar, Khille Mohella, J.P. Nagar, Mysore-570008

Present address

Flat No.114, Sankalp Magnum Apartment, Vishweshwar Nagar, Khille Mohella, J.P. Nagar, Mysore-570008

Languages known

Kannada : Read, write & communicate (Mother tongue)

Hindi : communicate

English : Read, write & communicate

PERSONAL DETAILS

I hereby declare that all the information given above is true and correct to the best of my knowledge

Place: Mysuru

VINAY H S

+91-994*******

*******@*****.**.**



Contact this candidate