Post Job Free
Sign in

Project Manager Cost Control

Location:
Collierville, TN
Salary:
65000
Posted:
August 15, 2025

Contact this candidate

Resume:

Steve Barron

*** **** ***** ****, ************, TN 38017

*****.*******@*******.***

PH 901-***-****

Superintendent Work History

Goodwin Brothers Maintenance & construction

**** ***’s Wine and Spirits Superintendent May 12 - September 6 2017

A woman’s clothing store renovated into the Doc’s Wine & Spirits

Ensured onsite safety and followed all OSHA regulations by doing my rounds interacting with workers and subs.

I cut the blocking and installed it.

We managed the sub-contractors and suppliers.

I kept the site clean and performed final cleanup. Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency.

We completed the project within the schedule

C & M Builders’

2018 Gateway Tire Store - Collierville TN I took over as project Superintendent when the client removed our superintendent.

I kept the site clean.

Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency

Ensured onsite safety and followed all OSHA regulations by Doing my rounds interacting with workers and subs.

We completed the project within the schedule.

2019 Loves Travel center Fulwood MS r –tire storage addition, metal building addition for tire storage and renovation and renovation to the existing Loves store

I kept the site clean.

Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency

Ensured onsite safety and followed all OSHA regulations by Doing my rounds interacting with workers and subs.

I installed the tire rack.

Hang doors, and drill and install door hardware including the exterior door security device

/I installed the toilet accessories

We Completed the project within the schedule.

2019 Loves Travel center –tire storage addition, metal building addition for tire storage and renovation and addition renovation and addition to the truck repair shop. In Tomsula MS

I kept the site clean and final cleanup.

I installed the tire rack

Hang doors, and drill and install door hardware including the exterior door security device

Installed blocking and installed the toilet accessories

We managed the sub-contractors and suppliers.

Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency.

We completed the project within the schedule.

2020 Loves Store in Tupelo MS addition a 756 square foot addition to the existing store and misc.

renovation to the store Plans added 2 showers and 1 washer and dryer room and a new counter top for the Subway inside the store

I ordered the brick to match the existing building,

The building had a structural deck with a TPO roof, attached to the existing roof.

I installed door and hardware and door security device and I cut the blocking and installed it

We used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners, and framing connectors effectively.

We managed the sub-contractors and suppliers. I kept the site clean and performed final cleanup.

Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency.

We completed the project within the schedule.

2021 Circle K Store Baton Rouge La

The Slab was installed when I got there, complete store, fuel tanks installed, and fuel pumps installed concrete and asphalt paving

Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency.

We completed the project within the scheduled time.

‘Total interior demolition to International Paper office in Memphis. Took a complete structure to the dumpster.

Ensured onsite safety and followed all OSHA regulations

I worked with the guys in the demo. I used a small front-end loader to demo the structure with the guys.

Image 21

2021 5th floor renovation UT/Methodist Hospital

Complete demolition and renovation of the 5th floor, the rooms remained

I worked with the subs and suppliers. I helped with the demolition crew to take down the structure.

Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency

The project was completed within the scheduled

Williams Construction

2024 Tam Restaurant

Superintendent

We managed the sub-contractors and suppliers.

I kept the site clean and performed final cleanup. Oversaw the entire construction process to ensure the highest leveled quality, cost control, and efficiency.

We completed the project within the schedule

2024 NACFAC Memphis Navel Service B551 Ecpansion Joints

Superintendent June 2024 - December

QCQ Certification

Safety Certification



Contact this candidate