Post Job Free
Sign in

Senior Engineer Principal

Location:
eMalahleni, Mpumalanga, South Africa
Posted:
July 27, 2025

Contact this candidate

Resume:

CURRICULUM VITAE- Erick Ndlovu Pr. Eng

Name: Erick

Surname: Ndlovu

Date of Birth: 29 August 1971

Marital status: Married

Address: ** ***** **

Kriel

Emalahleni

Mpumalanga

2271

Contact Cell Number 073******* / 072*******

Email *****.******@*****.***

Telephone 002**********

Professional Qualification:

Bachelor of Engineering (B.Eng) - Electronic (Honours) Degree (National University of Science andTechnology) Zimbabwe-1996

Certificate: General Management Development Program- Business Training and Development- University of Zimbabwe-2005

Professional Membership: Professional Engineer E.C.S.A:20160287 S.A.I.M.C- Member: 5444

Employment History

Current Employer: Hitachi-Kusile Power Station Employment Status: Contractor C&I Trainee Engineer 29/09/1997-01/10/1999 Hwange Power Station-ZESA Senior Engineer 0/10/1999-12/2002 Hwange Power Station-ZPC Electrical and C&I Senior Engineer 01/2003-04/2004 Bulawayo Power Station-ZPC Principal Engineer Electrical & Instrumentation 04/2004-26/01/2007 Small Thermals Power Stations-ZPC

Commissioning Engineer: 29/01/2007-14/12/2008: Komati Power Station- Eskom\ System Engineer 14/12/2007 -30/04/2016 Siemens Ltd. Energy Sector CURRICULUM VITAE- Erick Ndlovu Pr. Eng

Founder of Mdutshulwa and Sunduza Trading Pty Ltd and available for Contract Commissioning Work

Projects and Engineering Exposure

Medupi Power Station C&I Project Boiler Protection System Design and Engineering Medupi Power Station C&I Project Unit 3-1 Automation System Design and Engineering C&I System Engineering Unit 1 -3: February 2015 to-30April 2016 Duvha Power Station C&I Upgrade Project

Replacement of C&I System Unit 1 -6: 07 November 2011-to February 2015 Kriel Power Station C&I Upgrade Project

Replacement of C&I System Unit 1 -6: 14 December 2008-2011 Hwange Power Station (Project Support)

Burner Upgrade Project Unit 1-6: 26 May 2010-24 December 2010 Plant Maintenance Contract Unit 1-6: 4 April 2011- 06 November 2011 Power Station Development Courses attended

1. 2007: SPPA T3000 Engineering Training –Siemens AG 2. 2008: Control Principles and Optimization Training –Siemens AG 3. 1997: Teleperm MEA courses- Siemens AG

4. 2000: Teleperm XP courses- Siemens AG

5. Basics of process control

6. Teleperm XP Engineering training

7. Basic System Administration

CURRICULUM VITAE- Erick Ndlovu Pr. Eng

8. ISO14000 course -Nebuar Management Consultants

9. ISO9001-2000 Standard- Course-Internal

10. Automation Systems Siemens S5 PLC Part 1- Delta Corporation 11. General Management Development Programme Course- UZ(BTD) 12. Applied Rotary Machinery Diagnosis for Engineers Course- ABB 13. ISO 9001:2000 Quality Management System Development 14. Safety Representative course – HASLAC

15. ISO9001-2000 Standard- Course

16. Functional Safety Engineering I &II course- EXIDA Experience

Zimbabwe Power Company

HWANGE POWER STATION

29 September 1997- 01 October 1999 Post graduate training on Power Generation and Project Engineering

Stage 1 Upgrade Project (1997-1999)

I was fortunate enough to do my training during a Hwange Unit 1-4 C&I upgrade project execution period up to commissioning.

I was trained Basic Teleperm MEA Engineering courses for 5 weeks. I started practical involvement after a plant orientation and induction program on safety and health.

The Engineering system that I worked on included Graphic Engineering Tool with HP UNIX operating system, S5 Automation System AS220 EA, and the Operation System OS220 EA with SCO Unix operating System.

I was able to appreciate installation of Automation equipment and field instrumentation and the use of engineering drawings to diagnose plant defects during commissioning. CURRICULUM VITAE- Erick Ndlovu Pr. Eng

I was able to develop plant maintenance schedules and reliability and availability schemes for the running plant using the plant and equipment manuals from the Original Equipment Manufacturer recommendations and information from other experienced individuals.

Plant optimization and Change Management

After I had learnt the plant operations I was able to understand control loop tuning and optimization of the boiler controls as required by the employer. I carried out control and plant modifications as the burn in problems persisted in order to reduce down time due to unforeseen design flaws. I was involved in numerous running Plant Fault Diagnosis for Maintenance and Return To Service commissioning during this period. I would also carry out Process Control System Administration and Equipment Servicing as a support service to the Maintenance department.

Stage 2 Upgrade Project

01 October 1999-February 2001

Power Generation and Project Engineering

Boiler Engineer

I was attached to the Siemens Project Engineering team for two years in the Hwange Unit 5&6 C&I upgrade works and commissioning I was able to do Engineering works from Data capture, User requirement specification assessments and Basic Engineering Design Freeze to detailed design and Procurement of Equipment to Installation and commissioning.

I was trained to carried out Teleperm XP Engineering and Automation system administration and Support (Engineering System ES680, Automation System AS620, Operating & Monitoring OM650, Server Units, Process Units, and Operating Terminals)

Auxiliary Plant Upgrade Individual Projects

10 August 2000-15 December 2001

Boiler Senior Project Engineer

CURRICULUM VITAE- Erick Ndlovu Pr. Eng

While I had the responsibilities for the main project on stage 2 design and install the Allen Bradley PLC5 to run the Auxiliary Plant Systems such as the Cooling Water CW, Fuel Oil and Compressed Air plants.

The works carried out involved, Data compilation, I/O allocation to module racks and cabling, control logic design and testing, field instruments wiring and commissioning. I made final documentation (Drawings, Control philosophy and Maintenance Manuals). The plant was handed over to operating in time for the return to service of the first upgraded unit on stage 2.

Stage 1 Plant Maintenance

December 2001-December 2002

Process Control Engineer (Boiler and Turbine)

After the C&I projects were completed I then joined the Maintenance Department full time as the C&I Engineer responsible for Plant Reliability,Availability and Monitoring of Units 1 to 4. I developed Plant Modification Processes and Total Quality Management system implementation. BULAWAYO POWER STATION

January 2003-January 2007:

Principal Electrical and C&I Engineer (Small Thermal Power Plants) To provide engineering support to Small Thermal Power Plants .This included the following:

-Project co-ordination and Management

-Engineering Solutions development to improve plant reliability and availability.

-Plant inspections and user compliance monitoring

-Quality Management and Certification supervision

-Maintenance Transformer, Electrical Switchgear and Motors

-Generator Transformer and auxiliary systems Maintenance

-Yarrow Chain grates Boiler and turbine control system modification

-Draught Group System Servo clutch fluid coupling system control modification to fixed coupling using a Variable Speed Drive (VSD)

-Modification and Automation of Mothballed Yarrow boilers to include modern control mechanisms and concepts.

CURRICULUM VITAE- Erick Ndlovu Pr. Eng

Eskom Komati Power Station

29 January 2007: Contract Commissioning Engineer (Maze Projects) Development of Engineering and Maintenance schedules, procedures and Operation & Alarm Response cards.

Reliability Based Maintenance System (RBM) development Unit 9 Project tracking and monitoring for Generation department Installation and Quality Inspections and Acceptance Kriel Power Station ESKOM

Upgrade Project (Siemens)

07 January 2008-07November 2011

System Engineer (Siemens Ltd)

Unit 1 Upgrade Plant Systems Commissioning

Siemens Power Plant Automation SPPA T3000 system installation and Commissioning,

Boiler and Turbine systems commissioning such as - Steam System commissioning

Draught Group System commissioning

Feed System commissioning

HP Bypass system commissioning

Fuel Oil Burner Commissioning

Boiler Control System Optimization

HWANGE POWER STATION - ZPC

May 2010(50days)

Fuel Oil Burner Project and Maintenance Support Engineer (Siemens)

(Siemens Ltd Maintenance Contract)

Resolve the power station system technical problems and to advise management on the engineering solutions to plant reliability and availability problems experienced. CURRICULUM VITAE- Erick Ndlovu Pr. Eng

HWANGE POWER STATION - ZPC

April 2011 (173 days)

Fuel Oil Burner Project and Maintenance Support Engineer (Siemens)

(Siemens Ltd Maintenance Contract)

I worked at Hwange Power station to resolve problems associated with the Engineering system and plant availability problems throughout the period advising management of any requirements to improve the situation including training C&I staff. Duvha Power Station ESKOM

Upgrade Project

07 November 2011 –February 2016

System Engineer (Siemens Ltd)

Basic Engineering design

Development of Technical Documentation (following Standards from the Tender document)

Philosophy documents

Functional Specification Documents

Verified List and Schedules for Instruments and Drives Concept Documents

Configurations and layout drawings

Hook up Templates

Procedure Documents

I was involved in the documentation up to Basic Design Freeze Currently am involved in the detailed Design of the Functional Specifications and detailed engineering of Plant Automation System and Control loops using Auxiliary Software Tools and the Engineering Tools for SPPA T3000.

To carry out the whole project detailed documentation there is involvement of our German Counterparts and we liaise so as to share some responsibilities for the whole plant design philosophy for ordering information and cost options. CURRICULUM VITAE- Erick Ndlovu Pr. Eng

Medupi Power Station

New Build Project

16-July 2013 to 07 January 2014

System Engineer (Siemens Ltd)

I was responsible for the design of the Boiler Protection System as a study for the implementation at Medupi Power Station. I have used the information from the client ESKOM and my previous experience to come up with comprehensive technical documents for the implementation of the required Boiler protection standards (FFFR). My duties were to design hardware interface requirements with third party systems for the integration of the whole system.

Engineering and Commissioning Engineer Unit 1 -3: February 2015 to-30April 2016 I was responsible for the Design and engineering of the Boiler auxiliaries and PJFFP interfaces with third party Panels and Plant Devices

General

I have good experience with plant optimization and successful modifications. I have also worked on the boilers, turbines, and auxiliary plant systems including maintenance of the Turbine Valve Control UG40 Actuator and programming the associated Electronic Woodward Governor Control Modules. I have good knowledge of mechanical and chemical processes of any manufacturing plant as I have a good level of chemical and physics process understanding for all types of applications.

Computer literacy

System Engineering Drawings (AutoCAD and Visio)

Engineering Tool Software for Control loops SPPAT3000 etc Step 7 Programming

MS access database development and evaluation

MS excel spreadsheets

Office Software Tools

CURRICULUM VITAE- Erick Ndlovu Pr. Eng

Can adapt to other technologies from Allen Bradley, Yokogawa, ABB, and Hitachi etc Personality

I can communicate well, with internal and external customers. I have high attention to detail in my work processes. References

Bruce Donaldson

Senior Project Manager

Siemens Ltd

South Africa

079*******

Tabang J. Ramanaledi

Project Manager

Siemens Ltd

South Africa

082*******

John Monama

Project Manager

Siemens Ltd

South Africa

072*******



Contact this candidate