Post Job Free
Sign in

High School Energy Storage

Location:
San Carlos, TX, 78542
Posted:
July 28, 2025

Contact this candidate

Resume:

Miguel Angel Diaz

**** ****** ** ********, ** ***42 956-***-**** ***********@*******.***

OBJECTIVE

To work for an organization which provides me the opportunity to improve my knowledge, skills & growth along with the organization objective.

EDUCATION

PSJA Memorial High School

• (Graduate/Diploma)

UTPA

• Two years of basics

LICENSE

NCCER

TDLR Electrical Apprentice

Valid TX Drivers license

Osha 10/30

EMPLOYMENT HISTORY

Us trades

Gregory Tx

Terminate and label devices,instruments & panels

Reroute & phone cables

Use of knockout to make hole on panels

Read blueprint to locate devices, instruments & panels

BHI

Brookesmith,TX Nov2023-oct2024

Bess battery energy storage systems for Tesla

Setting batteries

Duct banks

Installation of roxtex for proper seal prevention of water,fire &dust

Termination on LV & MV, transformer.

Crimping lugs with burndy

Installation of ground

Running &bending conduit

Installation of cable tray

Connecting light post

Gridworks

Edinburg, TX 78542. Jan2023 -nov 2023 / Jan 2025 -CURRENT

Bess (battery energy storage systems)

Setting batteries

Run underground pvc pipe

Terminations on gutter box/

Transformers Lv&Mv

Installation of ground

Run cable

Term Communication cable

Identify cable with tags

Installation of cable tray

Making racks for pvc

Megging 3phase

Terminating light poles & cameras

Spacex /cava electric

Brownsville TX. Oct 2022-jan 2023

Duct banks

Run conduit

Terminate LV transformer

Run cable

Ground

MMR

2033 FM-2725

Ingleside, TX 78362

United States. Sept2021-oct2022

Field route cable tray/ Tbars

Installation of speakers and lighting

Run &pull cable

Terminate panels /lights/ fire alarms / cameras

Gland /packing gland

Weld studs on to beams

Phone cables

PCL Industrial Construction

916 Broadway Port Lavaca, Tx 77979. Aug2020-sept 2021

Run conduit, pvc pipe, and cable tray

Measure for offsets to bend pipe to certain degrees needed

Cut supports to hold conduit

Install lights

Run wire to connect for lights

Install ground

Cut and thread conduit

MG Dyess

7159 MS-35, Bassfield, MS 39421

Full time 40 plus hours weekly

Buff welds for them to be inspected and tested

Cut with plasma cutter, grind, buff & heat up preparing bevel for weld

Gather skids to stack them so pipe can be laid

Housekeeping

Dent Wizard

San juan Tx

Make sure freshly trade in vehicles look like new again

Fix window rock chips

Repair and dye leather seats

Paint and repair curb rashes on wheels

Prepare and sand down vehicle body parts to get painted

Body work on vehicles such as using bondo

Remove dents

Headlight restoration

Houston Controls

Point comfort Tx

Full time 40 plus hours weekly Oct 2018- aug2020

Figure out how to run conduit

Read blueprint

Run cable tray and install spacing plates with ground

Run conduit and bend it to certain degrees needed

Cut and thread conduit

Run cable through conduit or pvc pipe

Connect lights

Install transformers

Triad electrical

Hackberry Louisiana

Full time 40 plus hours weekly. Aug2016-oct 2018

Run conduit, pvc pipe, and cable tray

Connect lights

Measure for offsets to bend pipe at certain degrees needed.

Thread newly cut conduit

Housekeeping

Install ground

Strike pipeline

TheWoodlands,Tx

Worked 40 plus hours weekly

Prepare leads, grinders and materials needed to begin welding

Grind and buff welds on pipe

Housekeeping

Bert Ogden Chevrolet

Mission, Tx

72 hrs weekly

Contact customers to let them know of rebates and new inventory

Test drive and demonstrate vehicle desired

Follow up with customers making sure everything is good after purchase and if they have any other questions

Educate cuatomers on vehicle that is best suited to there needs and wants

Brock

Sweeny TX

Worked 40-80 Hours weekly September 2016- January 2017

• Worked in a team of 4

• Grab material needed to build scaffold

• Tie off 100% on every scaffold being build

• “Be safe” was our motto

Valram Energy Services

Edinburg TX 78541 December 2016- August 2016

Worked 40 Hours weekly

• Inspect & grease valves for oil running pipes

• Replacing old broken pipe with new one from under ground

• Clear ride away from trees or any substances affecting underground pipeline

Lobo Telecommunications (contractors for Time Warner Cable)

523 Moore rd October 2015- December 2016

Alamo TX 78516

Management: Norma Fernandez; may be contacted

956-***-****

Worked 40-50 Hours Weekly

• Worked as a Dispatcher

• Help technicians activate equipment

• Confirm scheduled appointment with customers

• Make sure technicians meet deadlines

• Do surveys making sure customers are satisfied with services

Lehoski Welding May-August 2014

3140 E Main St

Uvalde TX 78801

Worked 50-60 Hours Weekly

• Built locations for oil companies

• Welded pipes, where oil would pass through

• Worked with a crew of four members, we worked together to finish job sites.

• Organized all equipment used at the end of the day

Skills

• Languages: Fluent in both English and Spanish

• Computer Proficiency: PC, Macintosh Operating Systems, Microsoft Word, Power Point, Outlook, Internet and Excel

• Communication

• Multitasking

• Dependability

• Initiative & problem solving



Contact this candidate