Executive Desk Operation Engineer CCPP Gas Turbine, ABB GT 13E, Siemens V94.2, GE 7FA
PGDC NPTI+B.TECH Executive Desk Engineer Operation CCPP with 11 years of experience in ABB GT 13E, Siemens V94.2, DCS T3000 with station capacity GT 4x135 MW + ST 2x150 MW. 1) GT Control System = GT 13E (ABB), V94.2 (Siemens), GE 7FA (Mark4, Mark5 & Mark 6e) 2) ST Control system = ABB (225 MW), BHEL (150 MW). 02-Weeks CCGT GAS TURBINE Simulator training on Siemens V94.2 & GE Frame 7FA at NPTI FARIDABAD. Education
MARCH-22 TO MARCH-23 PGDC in Power Plant Engineering, NPTI FARIDABAD Haryana. AUGUST-2007 TO JULY-2011 B.TECH Mechanical Engineering from BRCM CET, MDU UNIVERSITY Haryana. Key Skills
Gas Turbine Desk Operation CCPP
Operation WHRB Boiler &Turbine
DCS T3000 Siemens v94.2 ABB GT13E
Work Experience
Dec 2024: NTPC Dadri Ghaziabad UP (Currently Working). Position: Executive Desk Operation Engineer CCPP Gas Turbine at DGBPS (4X130 MW GT SIEMENS V94.2 + 2X150 MW BHEL Steam Turbine).
April 2023 to Dec 2024: NTPC JHANOR Gujrat CCPP Gas Turbine (3x145 MW GT 13E ABB + 225 MW Steam Turbine ABB)
Highlights:
In my current role I am looking after the smooth efficient operation of Gas Turbine in an open cycle and close cycle with WHRB & its auxiliaries.
DC drives trial on weekly basis. Black starts diesel generator to ensure the availability. Isolation normalization of equipment safely. Unit changeover of equipment as scheduled. Startup Shutdown activity of GT. Preparation of night report including the punching of day-ahead station DC to WBES site. Preparation and ready to start for GT’S and Boiler lineup as per NLDC Communication in Open cycle and closed cycle during the Peak hour and less reverse ramp rate. Preparation and punching of station DC in intraday system. Communication from NLDC regarding the grid code for to synch the GT’S and ST in open cycle and closed cycle. Switchyard isolation for 220kv & 400kv bus side and line side as per the requirement by maintenance or annual outage approved by NLDC.
Issue of PTW, LWC, HWP, WHP, Confined space permit s per requirement to Maintenance department. Preparation of daily DPM Meetings schedule.
Monitor each and every critical parameter respond quickly during any emergencies. Promptly respond to alarms, alerts, and emergency situations by taking appropriate actions to mitigate potential risks, maintain safety, and minimize downtime
Maintain accurate and detailed records of operations, incidents, and equipment status, and report any deviations, abnormalities, or issues to supervisors and relevant stakeholders Follow established control procedures to regulate and adjust equipment settings, parameters, and processes as needed to maintain optimal performance and compliance with operational requirements Collaborate and communicate effectively with team members, supervisors, and other departments to ensure seamless coordination of activities and facilitate a smooth flow of information regarding operations and incidents Conduct routine equipment checks, inspections, and preventative maintenance tasks to identify any potential issues and ensure equipment remains in good working condition Ensure compliance with all applicable regulations, safety standards, and company policies, providing feedback and recommendations for improvements where necessary
Dec-2022 to April-2023: Continental carbon India private limited Ghaziabad Position: Executive Desk Operation Engineer (2x15 MW BHEL Steam turbine). Highlights:
• I am looking after the smooth & efficient operation of the waste heat recovery boiler & its auxiliaries. Monitor each and every critical parameter & respond quickly during any emergencies.
. Doing Isolation and normalization of equipment as per the safety permit system. Try to minimize the Water & power consumption.
. safe start-up & shutdown of the unit, smooth operation of boiler &its auxiliaries Oct2018 to Dec’2021: SANEEL CONTRACTING &TRADING (Saudi Arabia) KSA Position: Executive Desk Operation Engineer CCPP Gas Turbine (4x130 MW SIEMENS V94.2 + 2X250 MW Steam turbine)
Highlights:
I am looking after the smooth efficient operation of Gas Turbine in an open cycle and close cycle with WHRB & its auxiliaries.
DC drives trial on weekly basis. Black starts diesel generator to ensure the availability. Isolation normalization of equipment safely. Unit changeover of equipment as scheduled. Startup Shutdown activity of GT . Monitor each and every critical parameter respond quickly during any emergencies. Promptly respond to alarms, alerts, and emergency situations by taking appropriate actions to mitigate potential risks, maintain safety, and minimize downtime
Maintain accurate and detailed records of operations, incidents, and equipment status, and report any deviations, abnormalities, or issues to supervisors and relevant stakeholders Follow established control procedures to regulate and adjust equipment settings, parameters, and processes as needed to maintain optimal performance and compliance with operational requirements Jan’2018-Apr ‘2018: Descon Engineering, Ruwais UAE as Mechanical Engineer. Devised overall strategy for documentation and identified design sets planned for each stage of work. Identified mechanical problems and determined the best solution for correction Highlights
• Monitor machine overhauling processes to identify area in need of improvement and implement plans to achieve desired results.
• TurnaroundprojectsinBorougeUAEUnit#02 in (PP1, PP2ANDPE3) UAE Polypropylene and polyethylene unit #02 as mechanical supervisor rotating /static Equipment.
• Also work as Permit Receiver in Brogue UAE in polypropylene and polyethylene. Mar’2013-April’2017: Power Mech Projects Ltd, as Mechanical Engineer. Highlights:
• Hand full Expertise in the overhauling of Steam/Gas Turbine pumps.
• To go through the Daily Routine Maintenance (PM&CM) for Mechanical equipment and its Auxiliaries and follow up on the daily Backlog of Routine Maintenance. Aug’2011toDec’2012: S Raj Guru Engineering and Works as Mechanical Engineer Highlights:
• To go through the Daily Routine Maintenance (PM&CM) for Mechanical equipment and its Auxiliaries and follow up the daily Backlog of Routine Maintenance
• Supervised technical and non-technical as required for successful work completion
• Successfully going through technical readings and PID Drawings for mechanical equipment Training
• 21 days of training at “RELIANCE ROSA”4x300MW Coal Based Subcritical Tangential Fired Boiler.
• 02 weeks on hand SIMULATOR 800MW Training done at NPTI FARIDABAD. Personal Suitability
• Accurate
• Tea
• Reliability & Hard work
• Excellent oral & Written Communication
• Organized
PANKAJ KUMAR