RESUME
Application for the Post of : Project Manager.
SIVAKUMAR. A
Chennai, Tamilnadu,Inida.
MOB. NO: +917********* /+919*********
E mail id : **********@*****.***
Objective: Seeking a responsible and challenging career with a growing organizationwhere my talent and knowledge may significantly contribute to theorganization’s growth and profitability.Looking to join a progressive organization that has the need for SeniorMechanical Engineer in a business of Oil
& gas companies and offers opportunities for advancement. Summary:
Seasoned Project Portfolio Manager with over 23 years of Total experience driving project success. Expertise in agile methodologies, project prioritization, risk management, and budget management. Proven track record of delivering projects on time, within budget, and with exceptional quality. Skilled in leading teams, developing training programs, and improving project management capabilities across organizations.
Management &TechnicalSkills:
•I am Mechanical engineering graduate with 18 years of experiencewith the Project Management & execution, Procurement & ContractManagement.
•In-depth knowledge of modern management practices andquality/HSE standards relating to Petrochemical & Refinery Projects.
•Executed Tendering, Commercial Evaluation, Negotiation, andContract Administration for mega projects in Oil Refinery andPetrochemical sector.
•Budget Management,Change Management,Communication Management,Conflict Resolution,Cost Management
•Proficient at Co-ordinating procurement involving vendor estimation,tendering, contract negotiations & finalization of goods purchase.
*Highly organized and able to manage a large number of tasks at once. PRESENT EMPLOYER
Organization : Thirumalai chemicals Ltd,Ranipet, India Sector: Petrochemical Products & Power Generation Plant. Designation : Senior Engineer (Projects&constructions) Period : 18 Sep 2023 To Till now.
Project Experiance :
Managed the development and execution of a $50 million Power generation and PA(Phthalic Anhydride,Malic Acid Development )project, resulting in a 20% increase in the clients renewable energy portfolio.
Led a team of engineers and contractors in the design and construction of a Petrochemical Development Projects, reducing Operating Cost by an estimated 150,000Dollars/Month.
Developed and implemented a comprehensive renewable energy strategy for a major utility, resulting in a 15% reduction in its carbon footprint.
• Prepared equipment acquisition contracts.
• Utilized project management software and tools effectively to track project progress, identify risks, and optimize resource allocation.
• Conducted regular performance reviews and provided constructive feedback to project managers, fostering professional development and improving team performance.
• Collaborated with stakeholders across the organization to gather requirements, manage expectations, and build consensus.
• Proactively identified and mitigated potential project risks, ensuring timely and cost- effective resolutions.Strong expertise in mechanical equipment and complex machinery.
• Developed and implemented a centralized project management system, streamlining processes and improving efficiency by 25%.
• Led a team of project Engineers in creating and executing a standardized portfolio management framework, resulting in increased consistency and reduced risk.
• Established a robust project governance process, ensuring alignment between project execution and organizational strategy.
PREVIOUS EMPLOYER
ADNOC ONSHORE
Po.box no: 270, Cornich road, Abudhabi/UAE
Role: - Field Services (Projects& Construction)
(Since 17-11-2012 to 26-08-2023)
Duties and Responsibilities:
Supervision, direction and coordination for planning and execution of all work activities of the group and construction management of Capital and other Projects to get the assigned Project Objectives.
•Review of Design Packages in Construction point of view and toprepare Scope of work, negotiations with Vendors and Contractorsuntil successful Completion of the Project.
•Led the activities of project proposal including development of scope,functions, physical solution and cost estimate. Actively participated,project execution for project proposal, initiatives, studies andcontinuous improvement of solutions and problem solvers.
•Frequent contacts with Contractors to discuss work requirements andevaluate performance.
•Assisted other Operations group in times of major plant shutdown andturnaround maintenance.
• Strong writing and communication skills
•Skills in Spare part Management using SAP & MAXIMO 4i (CMMS) forPreparation of Specs, raising PR & SR, making BOQ / MaterialReservations & for Inventory Management.
•Knowledge, implementation and certification of ISO standards (9001,14001 & 18001) for quality, environment and safety.
Key Accomplishments:
During this Period I had Prepared Scope of Work for major Projects as wellas Turnaround jobs. The following is some of the highlights of the jobcompleted.
•Cooling water /jacket water modification for PP Plant Loop Reactors
•Modification of Cooling water U/ G line to above ground line forextruder area.
•Polish water lines modification job to bypass process water tank.
•Reactor effluent Cooler Heat exchanger (E-3008) installation andpiping modification job.
•Project execution and Materials management for Hydrogen supplyfrom PDH to PP Plant cooling water modification job near extruderarea.
•H2 Flame detection system at PDH Plant
•Neutralization of Reactors jobs at PDH Plant
•PDH Shelter job Service requisition
•Managed, executed and commissioned all MOCs job waiting forturnaround. Organisation : PETRODAR OPERATING COMPANY,
KHARTOUM, SUDAN,
Designation : Project Supervisor.
Period : February 2009 to September 2012
Duties and Responsibilities:
Project management of EPC Projects.
•To ensures that all plans and specifications reflect or adhere to beprescribed Codes, Standards, and Practices of various regulatorybodies and agencies.
•Active involvement in documents review and development of basicdesign data like preliminary / conceptual design, Front EndEngineering Design
(FEED), stamped engineering deliverables.
•Preparation and review of man-hours estimates. Interfaced withContractor, Vendors and other Engineering disciplines.
•To work as liaison between Refinery management and Engineeringdesign International consultants.
•Technical evaluation/selection of mechanical equipment optimizing in coordination with suppliers / vendors.
*Team Excellence Award Recognized for exceptional collaboration and teamwork, leading to the successful delivery of multiple projects.
*Negotiated power purchase agreements (PPAs) with multiple utilities, ensuring stable revenue streams for renewable energy projects.
*Managed the environmental permitting process for a largescale solar project, ensuring compliance with all applicable regulations and minimizing environmental impact.
*Performed financial modeling and analysis for renewable energy projects, evaluating the economic viability and investment potential. Developed and implemented project management plans for renewable energy projects, ensuring timely and efficient execution. PREVIOUS EXPERIENCE:
Organization :G.M.R POWER CORPORATION LIMITED.
(HYUNDAI HEAVY INDUSTRIES LTD),CHENNAI.
POSITION: DY.ENGINEER. (OPERATION&MAINTENANCE)
PERIOD: AUGUST- 2008 TO FEB- 2009,
Duties and Responsibilities:
• Preventive maintenance and complete overhauling of compressor used for instrument air, utility air, and to produce nitrogen.
• Replacing piston rings, guide rings, rod packing and adjustment of TDC and BDC.
• Replacing main bearings and big end bearings.
• Refurbishment of suction and discharge valves & Renew of cylinder liner
• Worked on the unloaded device of compressor.
• Trouble shooting such as long interval between load and unload. Low lube oil
• Pressure, PSV releasing, belts breakings, cooling water pump fault, inter cooler and after cooler leakage
• Refurbished all type of single double, tandem and cartridge seals, having single, multi- spring and bellows.
• Renewed packing seal faces and maintained operating length lapping seal faces to the required finish.
• General maintenance overhauling tooth conduct checking gears replacement, backlash measurement and correction of gear box.
Accomplishments
Successfully managed a portfolio of 3 projects, resulting in a 98% success rate, ontime delivery, and within budget.
Developed and implemented a project prioritization process, reducing project backlog by 30% and improving resource utilization.
Established a comprehensive project risk management framework, reducing project risk by 25% and enhancing project resilience.
Led a team of 50+ project managers, providing mentorship, guidance, and support for successful project delivery.
Developed a project management training program, improving project management capabilities across the organization by 20%.
Organization : Thirumalai chemicals Ltd Ranipet India Designation :Senior Supervisor.
Period : 2002 to Nov 2004
Duties and Responsibilities:
• Overhauling and testing various types of safety and relief valves.
• On line popping and reseating pressure setting of the safety valves on high pressure boiler.
• Servicing and testing valves like gate valves, globe valves, angle valves, ball valves, types of check valves, diaphragm valves & butterfly valves
• Routine maintenance on Heat exchangers, Fin fan Air coolers, vessels etc
• Responsible for the alignment such as Rim and face method, Reverse indicator method, (Analytical and Graphical) and Laser method
• Maintenance of Air Fin Coolers Including Greasing, Blade angle fixing, Tip track, Tip Clearance Checking etc.
• Maintenance Of Conveying System ( Screw Conveyer, Belt Conveyer, Trammel Conveyer &Vibro Conveyer).
PERSONNEL DETAILS:
Name : A.SIVAKUMAR,
Father’s Name : K.ARUMUGAM,
Sex : Male
Nationality : Indian
Date of Birth : 16/06/1979
Marital status : Married
PASSPORT DETIALS :
Passport No : Z7516940
Date of Expiry : 26/10/2033
Qualification:
* Graduate in Mechanical Engineering, ( Bachelor in Mechanical Engg). From Board of Technical Education, India
DECLARATION:
Here by I declare that all the above information furnished is true to the best of my knowledge.
Yours faithfully
Place:
Date: A.SIVAKUMAR.