RESUME, **** DECEMBER.
*. NAME: GINI, PATRICK, OBIEKWE, UBA
2. DATE OF BIRTH: 20th MAY, 1956
3. PLACE OF BIRTH: SOKOTO
4. STATE OF ORIGIN: ANAMBRA
5. NATIONALITY: US –CITIZEN
6. RESIDENTIAL ADDRESS: 3730 E. Ashford Villa Lane, Houston TX, USA.
7. CONTACTS NO: Mobile: +1-832-***-****
8. MARITAL STATUS: MARRIED WITH THREE (3) CHILDREN
9. EMPLOYMENT HISTORY SUMMARY:
PRESENT EMPLOYMENT:
Solar Specialist with ADT-PHT from 06/14/2023 to Date
PREVIOUS EMPLOYMENT:
I. HVAC SALES with the Chill Brothers From 09/06/2023 -10/02/2023 in Houston TX.
II. APPOINTMENT SETTER -(Canvasser And Generating Leads) with - Nivo Solar LLC (07/25/2022 -05/15/2023, Solstice Solar LLC, Momentum Solar all in Houston TX.
III. Consultant on POWER, OIL AND GAS with Akea Automation Solution Inc.
IV. INVESTMENT AND PROJECT MANAGEMENT at National Petroleum and Investment Management Services (NAPIMS-NNPC) at Lagos, Nigeria.
V. SUPERINTENDENT ELECTRICAL WORKS AND HARDWARE ( DCS, PLC, SIS,etc) at Warri Refining and Petrochemical Company (WRPC-NNPC) Ltd at Warri, Nigeria.
10. SCHOOLS ATTENDED:
S/N SCHOOLS ATTENDED DATES QUALIFICATIONS
1. MALLAM BANKANU PRIMARY SCHOOL SOKOTO 1961 – 1966
2. NATIONAL SECONDARY SCHOOL NNEWI 1970 – 1976 WASC
3. UNIVERSITY OF NIGERIA NSUKKA 1976 – 1982 B. ENG. Electrical & Electronic Engineering.
11. MAJOR COURSES ATTENDED
S/N DATES DESCRIPTION AND ORGANIZERS
A. 19/03/84 - 19/04/84 REFINERY ORIENTATION-IN WARRI REFINERY
B. 08/04/87 - 1504/87 CABLE JOINTING AND TERMINATION -IN WRPC BY RAYCHEM.
CONSULTANTS
C. 1988 POWER SYSTEMS EXCITAION REGULATION AND CONTROL FOR
FRAME 5 GE TURBINES, BY GENERAL ELERIC CO -USA, AT-
WRPC
D. 08/09/95 - 13/09/95 POWER SYSTEMS PROTECTION AND CONTROL - BY POWER
SYSTEMS LTD IN CONJUNCTION WITH NEPA IN BENIN
E. 08/06/90 - 15/06/90 MICRO PROCESSORS IN INDUSTRIAL APPLICATION
BY O'SECULL NIG LTD WARRI IN BENIN
F. 04/09/96 - 10/09/96 PROGAMABLE LOGIC CONTROLLERS (PLC) OPERATIOS AND
MAITENANCE AT UNIVERSITY OF IBADAN (Ul)
G. 7/08/92-12/08/92 INDUSTRIAL RELATIONS SKILL BY AGROVOG LTD KADUNA DURBA
HOTELS
H. 17/05/88 -24/05/88 LABOUR RELATION INDUSTRIAL HARMONY NIG. INSTTUTE (NILS)
ILORIN AS WRPC BRANCH CHAIRMAN OF PEGASSAN
I. 28/06/94- 04/07/94 DISTRIBUTED CONTROLS SYSTEM (DCS) – FUNDAMENTALS –
YOKOGAWA ARMASSFOT HOLLAND
J 21/11/94 -21/12/94 DISTRIBUTED CONTROLS SYSTEM - MAINTENANCE AT RUCORN,
CHESHIRE, ENGLAND - YOKOGAWA
K 7/09/02 - 21/09/02 DCS/PLC OPERATIONS AND SELECTION IN PROJECT
APPLICATION BY HAVILAH ENGINEERING LTD- AT IBADAN
L 7/03/03—14/03/03 ELECTRICAL HAZARDS AND SAFETY BY NIGERIAN SOCIETY OF
ENGINEERS (NSE) AT SANGO OTTA
M 18/8/03-25/8/03 INCIDENT & INJURY FREE (IIF) WORKSHOP AT CHEVRON TEXACO
HQ IN HOUSTON BY JMJ OF AUSTIN TEXAS
N. 07/08/10 -14/08/10 INCIDENT & INJIRY FREE (IIF) WORKSHOP AT CHEVRON TEXACO
HQ IN BRACKNELL UK BY JMJ FOR CAMERON LTD /TOTAL OFFSHOE USAN DEEP OFFSHORE SUBSEA PRODUCTION SYSTEM (SPS)
O. 11/10/10-25/10/10 CORROSION MANEGEMENT AND CONTROL BY TOTAL
OFFSHORE A PARIS FRANCE.
P. 20/O6/11- 01/07/11 ESSENTIAL SKILL FOR OIL & GAS PROFESSIONALS BY TOTAL
WITH IHRDC IN BOSTON USA.
Q. 08/10/12 - 19/10/12 TECHNOLOGY OF OIL & GAS EQUIPMENT BY CHEVRON AT IFP
IN FRANCE PARIS
R. 28/04 – 04/05/13 & 14 OFFSHORE TECHNICAL CONFERENCE (OTC), HOUSTON, USA.
S. 08/07/13 – 20/07/13 ECONOMIES OF WORLD PETROLEUM PRODUCTION AND
EXPANDED BASIC PETROLEUM ECONOMIC, PETROSKILLS CENTRE, HOUSTON, USA.
T. 16/08/14 – 20/08/14 OIL AND GAS CONFERENCE, DENVER, COLORADO,
BY ENERCON
U. 28/10/14 – 12/11/14 ADVANCE PETROLEUM PRODUCTION OPERATION AND
PROCESSING. BY SMART KONCEPT TECHNOLOGY, HOUSTON, USA.
V. 11/09/15 - 13/09/15
SOCIETY OF PETROLEUM ENGINEERS CONFERENCE ON FIBER OPTICS FOR WELLS, RESERVIORES & FACILITY MANAGEMENT AT NAPA VALLEY CALIFONIA -USA.
W. 28/09/15 – 02/10/15 SYSTEM APPLICATIO AND PRODUCTS(SAP) TRANING GHANA.
X.. 05/10/15 – 09/10/15 LEADERSHIP, COACHING AND MENTORING BY GLOBALTRAININ
TRAINING CONCULTING SPONSORED BY CHEVRON- HOUSTON
12. STATEMENT OF EXPERIENCE AND RESPONSIBILITY
S/N DATE POSITION, EMPLOYER AND DESCRIPTION OF PROJECT (WITH
COSTS ETC)
I. 1979 &1980 POWER CONSTRUCTION, DISTRIBUTION AND INSTALLATIONS
WORKS WITH RICHLINE VENTIRES LTD ENUGU (INCLUDING FEDERAL GOVT COLLEGE KATSINA).
II 22/11/83-12/02/84 PUPIL ENGINEER NATIONAL ELECTRIC POWER AUTHORITY
(NEPA) IJORA LAGOS & ENUGU
III. 13/02/84 - 09/09/92 SUPERVISOR ELECTRICAL MAINTENANCE WARRI REFINERY
(WRPC)NNPC IN CHARGE ELECTRIC MOTORS SWITCH GEARS, TRANSFORMERS, HOISTS, LIFTS, CRANES, MOTORIZED VALVES, TURBINE, STEAM & D1ESEL GENERATORS, LIGHTING SYSTEMS, RELAYS, PROTECTION EQUIPMENTS ETC
IV 23/01/88-09/06/90 TERRESTIAL ELECTRICAL WORKS AND INSTALLATION OF
LIHGTENING PROTECTIONS AND GENERAL EARTING SYSTEMS
V APRIL-JUNE 1987 PLANING SUPERVISOR- PREVENTIVE MAINTENANCE PLANING AND
PROGRAMMING, MACHANALYSIS, VIBRATION MONITORING AND
CONTROL ETC
VI JULY- AUGUST 1987 AS INSTRUCTOR SPECIFIC COURSE UNDER COMMERINT SPA OF
ITALY KRPC & WARRI PETROCHEMICALS TRAINEES AT PETROLLEUM TRAINING INSTITUTE (PTI) WARRI
VII 1986-1988 GROUP LEADER ELECTRICAL WORKS AREA 1&2 (TOPING, REFORMING
AND VACUM UNIT
VIII 1988-1990 GROUP LEADER AREAS 3&4 ELECTRICAL WORKS HF (HYDROFLOURIC
ACID PLANT) AND FCC (FLUID CATALYTIC CRACKING) PLANTS
IX 1990 – 1992 ELECTRICAL SUPERITENDENT POWER PLANT AND UTILITIES WRPC
X 1992 – 1999 HARDWARE SUPERITENDENT IN CHARGE OF SYSTEMS AND
MAINTENANCE OF DISTRIBUTED CONTROL SYSTEMS (DCS)-FOR YOKOGAWA.FOXBORO & HONEYWELL
XI 1992 – 1999 HARDWARE SUPERITENDENT PROGRAMMABLE LOGIC CONTROLLER
(PLC)-FOR SIEMENS, ALLANBRADLEY, FUJI, GE FANUC, MITSUBISHI
MODELS; UNINTERRUPTED POWER SUPPLY (UPS) SYSTEMS FOR YUASA-JAPAN, BORRIS-UK ETC LASTLY PERSONAL COMPUTERS (PC) FOR WRPC PERSONNELS AND THE LOCAL AREA NETWORK (LAN)
XII 1999 – 2006 MONITORING, SUPERVISION AND CORDINATING MAINTENANCE
INTERVENTION & FACILITIES UPGRADES IN FACILITY DEPT OF GAS DIVISION OF NAPIMS FOR THE JOINT VENTURE COMPANIES EG SPDC, CHEVRONTEXACO, ELF, EXXONMOBIL
XIII 23/03/1999 - 2006 CASHCALL ADMINISTRATION & VERIFICATION; INVESTIGATION &
VALIDATION OF JOINT VENTURE & RETURNS IN FACILITY DEPT OF
GAS DIVISION.
XIV 01/01/2008-31/12/2010 AG. DEPUTY MANAGER PRODUCTION & DEVELOPMENT PSC DEPT.
GAS DIVISION
XV. 01/.01/2011 - TO DATE AG. DEPUTY MANAGER POWER PLANTS IN (DEPENDENT POWER
(16/10/14) PRODUCTION(IPP) & SPECIAL PROJECTS(SP) IN GAS DIVISION -NAPIMS- NNPC.
13. PROJECT WORKS
S/N DATE POSITION, EMPLOYER AND DESCRIPTION OF PROJECT (WITH COSTS
ETC)
i 1987-1988 PROJECT ENGINEER ELCTRICAL FOR DESIGNS, CONSTRUCTION AND)
INSTALLAION OF SYSTEMS AND MONITORING FOR THE DEBOTTLENECKING PROJECT OF WRPC WITH SNAPROGETTI SPA OF ITALY- MAIN CONTRACTORS. ($120M)
ii. 1992-1994 PHASE II REHABLITATION PROJECT OF WRPC INVOLING
DETAILED ENGINEERING, CONSTRUCTION AND INSTALLATION WORKS WITH CHIYODA CORPORATION TSURUMI-YOKOHAMA JAPAN AND NIGERIA ($150M)
iii. 06/09/86 -28/09/86 INSTALLATION, CABLING AND COMMISSIONING OF A 95KV
MOTOR, BY REPLACING THE OLD TURBINEDRIVE.IN WRPC
iv. 07/01/87-02/03/87 INSTALLATION AND COMMISIONING OF 11KV UNDERGROUND
AMOURED CABLE FROM SUSTATION 5 TO JETTY IN WRPC A DISTANCE OF 6KM.
v MAY'99 - UNE 2000 PROJECT ELECTRICAL &INSTRUMENT ENGINEER- OBIGBO AGG
JV PARTNER SPDC WITH PARAGON ENGINEERING SERVICES UNDER
vi. JUN 2000 - MAR 2001 PROJECT ELECTRICAL & INSTRUMENT ENGINEER FOR
FORCADOS YOKRI INTEGRATED PLANT (FYIP) PROJECT JV PARTNER- SPDC HAGUE NETHERLANDS ($220M)
vii. APRIL -AUG, 2001 PROJECT ENGINEER ESCRAVOS GAS TO LIQUID (EGTL)
PROJECT WITH FORSTER WHEELER UK READING ENGLAND (S1.85BN)
viii SEPT - DEC, 2001 AGBAMI OFFSHORE PSC PROJECT, PROJECT ENGINEER JV
PATNER TEXACO UNLIMITED HOUSTON TEXAS. ($3.7BN)
ix. JAN 2002 TO DATE. PROJECT ENGINEER ESCRAVOS GAS PLANT 3 WITH PARSONS
ENGINEERING AND CHEMICAL COMPANY HOUSTON, AND FORSTER WHEELER USA HOUSTON TEXAS AND HYUNDAI HEAVY INDUSTRIES (HHI) SEOUL SOUTH KOREA. (FEED AND DETAILED ENGINEERING). ($454M)
x. AUG TO OCT 2006 CLARIFICATION MEETINGS AND TECHNICAL EVALUTION OF BIDS
FOR THE WEST AFRICAN GAS PROJECT (WAGP) FOR UTOROGU AND OBEN
xi. OCT TO DEC 2006 EVALUTIONS ON OML58 UPGRADE FOR OBITE GAS PLANT FOR
GAS SUPPLY TO LNG
xii. 1/11/04-15/12/04 INDEPENDENT POWER PRODUCTION (IPP) 900MW AFAM POWER
PLANT SHELL NIGERIA-EVALUATION ($600M)
xiii 6/10/95-16/10/95 FACTORY ACCEPTANCE TEST (FAT) WITH YOKOGAWA-CONTROL
BAILEY IN VEINLEZY FRANCE
xiv 14/02/05-07/03/05 HAZOP PARTICIPATION FOR SPDC GBARAN-UBIE (IOGP) ($1.2BN)
xv JULY 2003 FACTORY ACCEPTANCE TEST (FAT) WITH GTI AND KARVERNER
ENERCON UNDER SAIPEM FOR CONDENSATE METERING SKID VALIDATION AND PERFORMANCE AT TERNUZEN ZEELAND NETHERLANDS FOR SHELL NIGERIA ($250M)
xvi 3/10/99-10/10/99 FAT FOR SWITCH GEARS WITH POWELL ENGINEERING SERVICE
HOUSTON TEXAS FOR SHELL NIGERIA OBIGBO AGG SUBSTATIONS
xvii 15/10/99-25/10/99 FAT FOR FISHER ROSEMOUNT (EMERSONS) DCS, PLC AND F&G
SYSTEMS WITH PUFFER SWIVEN UNDER KBR FOR OBIGBO AGG FOR SHELL NIGERIA
xviii. 7/9/03-14/09/03 FAT FOR RADIO FREQUENCY ANTHENAS AND DISHES FOR
COMMUNICATION NETWORK FOR IRRI FLOW STATION FOR NAOC- AGIP NIGERIA BY EUROTECH MILAN UNDER SAIPEM EN!
17. 13/03/99 TO 18/05/06 MAJOR DUTIES INCLUDE BUT NOT LIMITED TO:
NEGOTIATION FOR ALTERNATIVE FUNDING AND GAS PURCHASE AGREEMENT.
MONITOR, CO-ORDINATE, SUPERVISE, PARTICIPATE AND MANAGE ALLOCATED PROJECTS IN ACCORDANCE WITH APPROVED PROJECT MANAGEMENT PROCEDURE WITH JV PARTNERS FROM CONCEPTION THROUGH FEED TO CONSTRUCTION AND CLOSE-OUT STAGE.
ENSURE COMPLIANCE TO APPROVED PROCEDURE, RELEVANT
ENGINEERING DESIGN, BEST PRACTICES, STANDARDIZATION AND
SPECIFICATION WHERE NECESSAEY FOR BROWN FIELD UPGRADE.
IMPLEMENT GOVT POLICIES ON LOCAL CONTENT
IMPLEMENT SUSTAINED COMMUNITY DEVELOPMENT PROGRAMMES FOR THE IMMEDIATE COMMUNITIES.
REPORTING AND MAKING PRESENTATION USING MS PROJECT AND AUTO CARDS RAISING CONCERNS AND RECORMENDING SOLUTIONS
INVOLVED IN RISK ASSESMENT, VALUE ENGINEERING, VALUE ASSURANCE, OPERATION ASSURANCE, COST CONTROL, CHANGE ORDERS, AND VARIATION LIMITS ETC.
PROJECT PLANNING, SCHEDULING AND CONTROLLING OF EXECUTION PLAN, MATERIAL LISTING AND SELECTION, SUBCONTRACTING OF MINI CONTRACT AND LOCAL AND FOREIGN PURCHASING.
ADMINISTER A PROPER AUTHOURISATION FOR THE VARIOUS STAGES OF ALLOCATED RESOURCES WITHIN THE LIMITS OF MY AUTHORITY.
EXERCISE CONTROL, VERIFY AND VALIDATE CASHCALLS, EXPENDITURE AND RETURNS IN CASHCALL ADMINISTRATION TO ENSURE ADHERENCE TO BUDGET.
LIAISE WITH DICIPLINE ENGINEERING GROUPS; REVIEW DETAILED ENGINEERING DESIGNS, HAZOPS, SAFOPS, HAZIP, SIMOP,
CONSTRUCTABILITY, MAITAINABILITY AND CONSTRUCTABILITY, AND TECHNICAL SUITABILITY AND FITNESS FOR PURPOSE.
PRODUCE TIMELY PROJECT REPORT COVERING THE SCOPE, BUDGET, AREAS OF CONCERNS ETC. AT THE END OF EACH PROJECT
ATTACHMENT.
ATTEND TECHNICAL AND SUB COMMITTEE METINGS TO SORT OUT
TECHNICAL AND COMMERCIAL ISSUES, APPROVAL AND PROCEDURAL BREACHES
PARTICIPATE AS ALLOCATED ON TECHNICAL AUDITS OF PROJECTS AND CORROSSION MATTERS.
ENHANCEMENT OF PLANT MONITORING AND MAJOR EQUIPMENT
INVENTORY SPREADSHEETS DOCUMENTATION AT THE END OF EACH FIELD VISIT AND FIELD VISIT ROTA ADHERANCE AND MANAGE
EQUIPMENT INVENTORY DATA BASE FOR REFERENCES.
18. 12/10/01- 20/05/04 PROJECT ENGINEER/SITE REPRESENTAIVE SUPERVISION OF
FORCADOS YOKRI GAS PLANT (FYIP) FROM DEN HAAG TO FORCADOS WARRI NIGERIA FOR SHELL. SHELL DEVELOPMENT COMPANY.
19. 07/06/01 03/06/02 PROJECT EGINEER SUPERVISING DETAILED ENGINEERING WORKS
FOR ESCRAVOS GASTO LIQUID PLANT FOR CHEVRON WITH FORSTEWHEELER IN READING ENGLAND, UK.
20. 13/09/02- 12/03/04 PROJECT ENGINEER FOR TEXACO OVERSEAS AGBAMI DEEP
OFFSHORE PROJECT IN HOUSTON.
21. 07/03/04-02/06/08 PROJECT ENGINEER FOR ESCRAVOS GAS GATHERING AND
PROCESSING AND COMPRESSION PLATFORM (GGCP) PROJECT FOR CHEVRON AND ATTENDING INTERCONNECTING PIPELINES BY HIYUNDAI HEAVY INDUSTRIES (HHI), FORSTER WHEELER, WILBROS ETC. FOR CHEVRONS FROM HOUSTON USA, TO SEOUL KOREA TO ESCRAVOS NIGERIA UPFRADING THE PLANT FROM 285MMSCF/D TO 600MMSCF/D PROCESSING CENTER EGP 3A AND 3B. INCLUDING THE OFFSHORE PLATFOR, 24", 12" ETC PIPELINE INTERLINKS
23. 14/06/80-20/05/2010 SITE REPRESENTATAIVE SEPERVISING USAN SUBSEA PRODUCTION
SYSYTEMS DETAILED ENGINEERING, CONSTRUCTION OF FACILITY MANIFOLDS, CHRISMASS TREES, WELHEAD, UMBILICALS JUJMPERS ETC. WITH CAMERON LTD IN EGHAM, SURREY UK AND WARRI AND PORT HARCOURT NIGERIS INCLDING THE ROV, IWOCS IN LEEDS, CONTROLS AT CELLE IN GERMANY, XT IN CIMS -(COST $1.2BN)
MALAYSIA, HOUSTON FOR THE CONNECTION SYSTEMS ETC.
24. 01/01/11 - 15/10/14 PROJECT ENGINEER ASSA NORTH (ANOS) GAS DEVELOPMENT
25. 01/08/12 -15/10/2014 PROJECT ENGINEER EXXONMOBIL IPP & SHELL'S SOKU GAS
UPGRADE
26. PETROLEUM PRODUCT MARKETING OF: AGO, D6, ATK –JET- MARKETING WITH NORTHBIDGE ERNEGY USA – 02/2020 – 01/09/2021
27. CONSULTANT TO AKEA AUTOMATIONS SOLUTIONS –IN HOUSTON TX. FROM 03/2021 - 11/04/2021
28. APPOINTMENT SETTER- MOMENTUM SOLAR, HOUSTON, TEXAS-USA FROM 03/14/2022 TO DATE (04/01/2022)
14. COMMENDATION LETTER
BRAVERY AND OUTSTANDING CONTRIBUTION IN FIRE FIGHTING AT WARRI FCC IN AUGUST 1987
OUTSTANDING PERFORMANCE AND CONTRIBUTION TO ESCRAVOS GAS PLANT FEED AT PARSONS ENG. AND CHEMICAL COMPANY IN HOUSTON TAXES FOR EGP 3A. ONSHORE BY CHEVRONTEXACO IN 2002.
15. HOBBIES
LISTENING TO OLD MUSIC (OLD SKOOL)
FOOTBALL (SOCCER) WATCHING
MOVIES WATCHING
READING NOVELS AND BIBLE
16. REFEREES
Engr Dennise Ajulu, GED, REFINING & PETROCHEMICALS - NNPC TOWER, ABUJA, Nigeria.
. (DR) Charles Unfongene Consultant at Ciena Corporation Vernon, CT, USA
Anthony Osakwe, IT Specilist, Private Bank, Pembroke Pine, FL, USA