Post Job Free
Sign in

Houston Tx Management Services

Location:
Katy, TX
Salary:
85000
Posted:
August 22, 2025

Contact this candidate

Resume:

RESUME, **** DECEMBER.

*. NAME: GINI, PATRICK, OBIEKWE, UBA

2. DATE OF BIRTH: 20th MAY, 1956

3. PLACE OF BIRTH: SOKOTO

4. STATE OF ORIGIN: ANAMBRA

5. NATIONALITY: US –CITIZEN

6. RESIDENTIAL ADDRESS: 3730 E. Ashford Villa Lane, Houston TX, USA.

7. CONTACTS NO: Mobile: +1-832-***-****

8. MARITAL STATUS: MARRIED WITH THREE (3) CHILDREN

9. EMPLOYMENT HISTORY SUMMARY:

PRESENT EMPLOYMENT:

Solar Specialist with ADT-PHT from 06/14/2023 to Date

PREVIOUS EMPLOYMENT:

I. HVAC SALES with the Chill Brothers From 09/06/2023 -10/02/2023 in Houston TX.

II. APPOINTMENT SETTER -(Canvasser And Generating Leads) with - Nivo Solar LLC (07/25/2022 -05/15/2023, Solstice Solar LLC, Momentum Solar all in Houston TX.

III. Consultant on POWER, OIL AND GAS with Akea Automation Solution Inc.

IV. INVESTMENT AND PROJECT MANAGEMENT at National Petroleum and Investment Management Services (NAPIMS-NNPC) at Lagos, Nigeria.

V. SUPERINTENDENT ELECTRICAL WORKS AND HARDWARE ( DCS, PLC, SIS,etc) at Warri Refining and Petrochemical Company (WRPC-NNPC) Ltd at Warri, Nigeria.

10. SCHOOLS ATTENDED:

S/N SCHOOLS ATTENDED DATES QUALIFICATIONS

1. MALLAM BANKANU PRIMARY SCHOOL SOKOTO 1961 – 1966

2. NATIONAL SECONDARY SCHOOL NNEWI 1970 – 1976 WASC

3. UNIVERSITY OF NIGERIA NSUKKA 1976 – 1982 B. ENG. Electrical & Electronic Engineering.

11. MAJOR COURSES ATTENDED

S/N DATES DESCRIPTION AND ORGANIZERS

A. 19/03/84 - 19/04/84 REFINERY ORIENTATION-IN WARRI REFINERY

B. 08/04/87 - 1504/87 CABLE JOINTING AND TERMINATION -IN WRPC BY RAYCHEM.

CONSULTANTS

C. 1988 POWER SYSTEMS EXCITAION REGULATION AND CONTROL FOR

FRAME 5 GE TURBINES, BY GENERAL ELERIC CO -USA, AT-

WRPC

D. 08/09/95 - 13/09/95 POWER SYSTEMS PROTECTION AND CONTROL - BY POWER

SYSTEMS LTD IN CONJUNCTION WITH NEPA IN BENIN

E. 08/06/90 - 15/06/90 MICRO PROCESSORS IN INDUSTRIAL APPLICATION

BY O'SECULL NIG LTD WARRI IN BENIN

F. 04/09/96 - 10/09/96 PROGAMABLE LOGIC CONTROLLERS (PLC) OPERATIOS AND

MAITENANCE AT UNIVERSITY OF IBADAN (Ul)

G. 7/08/92-12/08/92 INDUSTRIAL RELATIONS SKILL BY AGROVOG LTD KADUNA DURBA

HOTELS

H. 17/05/88 -24/05/88 LABOUR RELATION INDUSTRIAL HARMONY NIG. INSTTUTE (NILS)

ILORIN AS WRPC BRANCH CHAIRMAN OF PEGASSAN

I. 28/06/94- 04/07/94 DISTRIBUTED CONTROLS SYSTEM (DCS) – FUNDAMENTALS –

YOKOGAWA ARMASSFOT HOLLAND

J 21/11/94 -21/12/94 DISTRIBUTED CONTROLS SYSTEM - MAINTENANCE AT RUCORN,

CHESHIRE, ENGLAND - YOKOGAWA

K 7/09/02 - 21/09/02 DCS/PLC OPERATIONS AND SELECTION IN PROJECT

APPLICATION BY HAVILAH ENGINEERING LTD- AT IBADAN

L 7/03/03—14/03/03 ELECTRICAL HAZARDS AND SAFETY BY NIGERIAN SOCIETY OF

ENGINEERS (NSE) AT SANGO OTTA

M 18/8/03-25/8/03 INCIDENT & INJURY FREE (IIF) WORKSHOP AT CHEVRON TEXACO

HQ IN HOUSTON BY JMJ OF AUSTIN TEXAS

N. 07/08/10 -14/08/10 INCIDENT & INJIRY FREE (IIF) WORKSHOP AT CHEVRON TEXACO

HQ IN BRACKNELL UK BY JMJ FOR CAMERON LTD /TOTAL OFFSHOE USAN DEEP OFFSHORE SUBSEA PRODUCTION SYSTEM (SPS)

O. 11/10/10-25/10/10 CORROSION MANEGEMENT AND CONTROL BY TOTAL

OFFSHORE A PARIS FRANCE.

P. 20/O6/11- 01/07/11 ESSENTIAL SKILL FOR OIL & GAS PROFESSIONALS BY TOTAL

WITH IHRDC IN BOSTON USA.

Q. 08/10/12 - 19/10/12 TECHNOLOGY OF OIL & GAS EQUIPMENT BY CHEVRON AT IFP

IN FRANCE PARIS

R. 28/04 – 04/05/13 & 14 OFFSHORE TECHNICAL CONFERENCE (OTC), HOUSTON, USA.

S. 08/07/13 – 20/07/13 ECONOMIES OF WORLD PETROLEUM PRODUCTION AND

EXPANDED BASIC PETROLEUM ECONOMIC, PETROSKILLS CENTRE, HOUSTON, USA.

T. 16/08/14 – 20/08/14 OIL AND GAS CONFERENCE, DENVER, COLORADO,

BY ENERCON

U. 28/10/14 – 12/11/14 ADVANCE PETROLEUM PRODUCTION OPERATION AND

PROCESSING. BY SMART KONCEPT TECHNOLOGY, HOUSTON, USA.

V. 11/09/15 - 13/09/15

SOCIETY OF PETROLEUM ENGINEERS CONFERENCE ON FIBER OPTICS FOR WELLS, RESERVIORES & FACILITY MANAGEMENT AT NAPA VALLEY CALIFONIA -USA.

W. 28/09/15 – 02/10/15 SYSTEM APPLICATIO AND PRODUCTS(SAP) TRANING GHANA.

X.. 05/10/15 – 09/10/15 LEADERSHIP, COACHING AND MENTORING BY GLOBALTRAININ

TRAINING CONCULTING SPONSORED BY CHEVRON- HOUSTON

12. STATEMENT OF EXPERIENCE AND RESPONSIBILITY

S/N DATE POSITION, EMPLOYER AND DESCRIPTION OF PROJECT (WITH

COSTS ETC)

I. 1979 &1980 POWER CONSTRUCTION, DISTRIBUTION AND INSTALLATIONS

WORKS WITH RICHLINE VENTIRES LTD ENUGU (INCLUDING FEDERAL GOVT COLLEGE KATSINA).

II 22/11/83-12/02/84 PUPIL ENGINEER NATIONAL ELECTRIC POWER AUTHORITY

(NEPA) IJORA LAGOS & ENUGU

III. 13/02/84 - 09/09/92 SUPERVISOR ELECTRICAL MAINTENANCE WARRI REFINERY

(WRPC)NNPC IN CHARGE ELECTRIC MOTORS SWITCH GEARS, TRANSFORMERS, HOISTS, LIFTS, CRANES, MOTORIZED VALVES, TURBINE, STEAM & D1ESEL GENERATORS, LIGHTING SYSTEMS, RELAYS, PROTECTION EQUIPMENTS ETC

IV 23/01/88-09/06/90 TERRESTIAL ELECTRICAL WORKS AND INSTALLATION OF

LIHGTENING PROTECTIONS AND GENERAL EARTING SYSTEMS

V APRIL-JUNE 1987 PLANING SUPERVISOR- PREVENTIVE MAINTENANCE PLANING AND

PROGRAMMING, MACHANALYSIS, VIBRATION MONITORING AND

CONTROL ETC

VI JULY- AUGUST 1987 AS INSTRUCTOR SPECIFIC COURSE UNDER COMMERINT SPA OF

ITALY KRPC & WARRI PETROCHEMICALS TRAINEES AT PETROLLEUM TRAINING INSTITUTE (PTI) WARRI

VII 1986-1988 GROUP LEADER ELECTRICAL WORKS AREA 1&2 (TOPING, REFORMING

AND VACUM UNIT

VIII 1988-1990 GROUP LEADER AREAS 3&4 ELECTRICAL WORKS HF (HYDROFLOURIC

ACID PLANT) AND FCC (FLUID CATALYTIC CRACKING) PLANTS

IX 1990 – 1992 ELECTRICAL SUPERITENDENT POWER PLANT AND UTILITIES WRPC

X 1992 – 1999 HARDWARE SUPERITENDENT IN CHARGE OF SYSTEMS AND

MAINTENANCE OF DISTRIBUTED CONTROL SYSTEMS (DCS)-FOR YOKOGAWA.FOXBORO & HONEYWELL

XI 1992 – 1999 HARDWARE SUPERITENDENT PROGRAMMABLE LOGIC CONTROLLER

(PLC)-FOR SIEMENS, ALLANBRADLEY, FUJI, GE FANUC, MITSUBISHI

MODELS; UNINTERRUPTED POWER SUPPLY (UPS) SYSTEMS FOR YUASA-JAPAN, BORRIS-UK ETC LASTLY PERSONAL COMPUTERS (PC) FOR WRPC PERSONNELS AND THE LOCAL AREA NETWORK (LAN)

XII 1999 – 2006 MONITORING, SUPERVISION AND CORDINATING MAINTENANCE

INTERVENTION & FACILITIES UPGRADES IN FACILITY DEPT OF GAS DIVISION OF NAPIMS FOR THE JOINT VENTURE COMPANIES EG SPDC, CHEVRONTEXACO, ELF, EXXONMOBIL

XIII 23/03/1999 - 2006 CASHCALL ADMINISTRATION & VERIFICATION; INVESTIGATION &

VALIDATION OF JOINT VENTURE & RETURNS IN FACILITY DEPT OF

GAS DIVISION.

XIV 01/01/2008-31/12/2010 AG. DEPUTY MANAGER PRODUCTION & DEVELOPMENT PSC DEPT.

GAS DIVISION

XV. 01/.01/2011 - TO DATE AG. DEPUTY MANAGER POWER PLANTS IN (DEPENDENT POWER

(16/10/14) PRODUCTION(IPP) & SPECIAL PROJECTS(SP) IN GAS DIVISION -NAPIMS- NNPC.

13. PROJECT WORKS

S/N DATE POSITION, EMPLOYER AND DESCRIPTION OF PROJECT (WITH COSTS

ETC)

i 1987-1988 PROJECT ENGINEER ELCTRICAL FOR DESIGNS, CONSTRUCTION AND)

INSTALLAION OF SYSTEMS AND MONITORING FOR THE DEBOTTLENECKING PROJECT OF WRPC WITH SNAPROGETTI SPA OF ITALY- MAIN CONTRACTORS. ($120M)

ii. 1992-1994 PHASE II REHABLITATION PROJECT OF WRPC INVOLING

DETAILED ENGINEERING, CONSTRUCTION AND INSTALLATION WORKS WITH CHIYODA CORPORATION TSURUMI-YOKOHAMA JAPAN AND NIGERIA ($150M)

iii. 06/09/86 -28/09/86 INSTALLATION, CABLING AND COMMISSIONING OF A 95KV

MOTOR, BY REPLACING THE OLD TURBINEDRIVE.IN WRPC

iv. 07/01/87-02/03/87 INSTALLATION AND COMMISIONING OF 11KV UNDERGROUND

AMOURED CABLE FROM SUSTATION 5 TO JETTY IN WRPC A DISTANCE OF 6KM.

v MAY'99 - UNE 2000 PROJECT ELECTRICAL &INSTRUMENT ENGINEER- OBIGBO AGG

JV PARTNER SPDC WITH PARAGON ENGINEERING SERVICES UNDER

vi. JUN 2000 - MAR 2001 PROJECT ELECTRICAL & INSTRUMENT ENGINEER FOR

FORCADOS YOKRI INTEGRATED PLANT (FYIP) PROJECT JV PARTNER- SPDC HAGUE NETHERLANDS ($220M)

vii. APRIL -AUG, 2001 PROJECT ENGINEER ESCRAVOS GAS TO LIQUID (EGTL)

PROJECT WITH FORSTER WHEELER UK READING ENGLAND (S1.85BN)

viii SEPT - DEC, 2001 AGBAMI OFFSHORE PSC PROJECT, PROJECT ENGINEER JV

PATNER TEXACO UNLIMITED HOUSTON TEXAS. ($3.7BN)

ix. JAN 2002 TO DATE. PROJECT ENGINEER ESCRAVOS GAS PLANT 3 WITH PARSONS

ENGINEERING AND CHEMICAL COMPANY HOUSTON, AND FORSTER WHEELER USA HOUSTON TEXAS AND HYUNDAI HEAVY INDUSTRIES (HHI) SEOUL SOUTH KOREA. (FEED AND DETAILED ENGINEERING). ($454M)

x. AUG TO OCT 2006 CLARIFICATION MEETINGS AND TECHNICAL EVALUTION OF BIDS

FOR THE WEST AFRICAN GAS PROJECT (WAGP) FOR UTOROGU AND OBEN

xi. OCT TO DEC 2006 EVALUTIONS ON OML58 UPGRADE FOR OBITE GAS PLANT FOR

GAS SUPPLY TO LNG

xii. 1/11/04-15/12/04 INDEPENDENT POWER PRODUCTION (IPP) 900MW AFAM POWER

PLANT SHELL NIGERIA-EVALUATION ($600M)

xiii 6/10/95-16/10/95 FACTORY ACCEPTANCE TEST (FAT) WITH YOKOGAWA-CONTROL

BAILEY IN VEINLEZY FRANCE

xiv 14/02/05-07/03/05 HAZOP PARTICIPATION FOR SPDC GBARAN-UBIE (IOGP) ($1.2BN)

xv JULY 2003 FACTORY ACCEPTANCE TEST (FAT) WITH GTI AND KARVERNER

ENERCON UNDER SAIPEM FOR CONDENSATE METERING SKID VALIDATION AND PERFORMANCE AT TERNUZEN ZEELAND NETHERLANDS FOR SHELL NIGERIA ($250M)

xvi 3/10/99-10/10/99 FAT FOR SWITCH GEARS WITH POWELL ENGINEERING SERVICE

HOUSTON TEXAS FOR SHELL NIGERIA OBIGBO AGG SUBSTATIONS

xvii 15/10/99-25/10/99 FAT FOR FISHER ROSEMOUNT (EMERSONS) DCS, PLC AND F&G

SYSTEMS WITH PUFFER SWIVEN UNDER KBR FOR OBIGBO AGG FOR SHELL NIGERIA

xviii. 7/9/03-14/09/03 FAT FOR RADIO FREQUENCY ANTHENAS AND DISHES FOR

COMMUNICATION NETWORK FOR IRRI FLOW STATION FOR NAOC- AGIP NIGERIA BY EUROTECH MILAN UNDER SAIPEM EN!

17. 13/03/99 TO 18/05/06 MAJOR DUTIES INCLUDE BUT NOT LIMITED TO:

NEGOTIATION FOR ALTERNATIVE FUNDING AND GAS PURCHASE AGREEMENT.

MONITOR, CO-ORDINATE, SUPERVISE, PARTICIPATE AND MANAGE ALLOCATED PROJECTS IN ACCORDANCE WITH APPROVED PROJECT MANAGEMENT PROCEDURE WITH JV PARTNERS FROM CONCEPTION THROUGH FEED TO CONSTRUCTION AND CLOSE-OUT STAGE.

ENSURE COMPLIANCE TO APPROVED PROCEDURE, RELEVANT

ENGINEERING DESIGN, BEST PRACTICES, STANDARDIZATION AND

SPECIFICATION WHERE NECESSAEY FOR BROWN FIELD UPGRADE.

IMPLEMENT GOVT POLICIES ON LOCAL CONTENT

IMPLEMENT SUSTAINED COMMUNITY DEVELOPMENT PROGRAMMES FOR THE IMMEDIATE COMMUNITIES.

REPORTING AND MAKING PRESENTATION USING MS PROJECT AND AUTO CARDS RAISING CONCERNS AND RECORMENDING SOLUTIONS

INVOLVED IN RISK ASSESMENT, VALUE ENGINEERING, VALUE ASSURANCE, OPERATION ASSURANCE, COST CONTROL, CHANGE ORDERS, AND VARIATION LIMITS ETC.

PROJECT PLANNING, SCHEDULING AND CONTROLLING OF EXECUTION PLAN, MATERIAL LISTING AND SELECTION, SUBCONTRACTING OF MINI CONTRACT AND LOCAL AND FOREIGN PURCHASING.

ADMINISTER A PROPER AUTHOURISATION FOR THE VARIOUS STAGES OF ALLOCATED RESOURCES WITHIN THE LIMITS OF MY AUTHORITY.

EXERCISE CONTROL, VERIFY AND VALIDATE CASHCALLS, EXPENDITURE AND RETURNS IN CASHCALL ADMINISTRATION TO ENSURE ADHERENCE TO BUDGET.

LIAISE WITH DICIPLINE ENGINEERING GROUPS; REVIEW DETAILED ENGINEERING DESIGNS, HAZOPS, SAFOPS, HAZIP, SIMOP,

CONSTRUCTABILITY, MAITAINABILITY AND CONSTRUCTABILITY, AND TECHNICAL SUITABILITY AND FITNESS FOR PURPOSE.

PRODUCE TIMELY PROJECT REPORT COVERING THE SCOPE, BUDGET, AREAS OF CONCERNS ETC. AT THE END OF EACH PROJECT

ATTACHMENT.

ATTEND TECHNICAL AND SUB COMMITTEE METINGS TO SORT OUT

TECHNICAL AND COMMERCIAL ISSUES, APPROVAL AND PROCEDURAL BREACHES

PARTICIPATE AS ALLOCATED ON TECHNICAL AUDITS OF PROJECTS AND CORROSSION MATTERS.

ENHANCEMENT OF PLANT MONITORING AND MAJOR EQUIPMENT

INVENTORY SPREADSHEETS DOCUMENTATION AT THE END OF EACH FIELD VISIT AND FIELD VISIT ROTA ADHERANCE AND MANAGE

EQUIPMENT INVENTORY DATA BASE FOR REFERENCES.

18. 12/10/01- 20/05/04 PROJECT ENGINEER/SITE REPRESENTAIVE SUPERVISION OF

FORCADOS YOKRI GAS PLANT (FYIP) FROM DEN HAAG TO FORCADOS WARRI NIGERIA FOR SHELL. SHELL DEVELOPMENT COMPANY.

19. 07/06/01 03/06/02 PROJECT EGINEER SUPERVISING DETAILED ENGINEERING WORKS

FOR ESCRAVOS GASTO LIQUID PLANT FOR CHEVRON WITH FORSTEWHEELER IN READING ENGLAND, UK.

20. 13/09/02- 12/03/04 PROJECT ENGINEER FOR TEXACO OVERSEAS AGBAMI DEEP

OFFSHORE PROJECT IN HOUSTON.

21. 07/03/04-02/06/08 PROJECT ENGINEER FOR ESCRAVOS GAS GATHERING AND

PROCESSING AND COMPRESSION PLATFORM (GGCP) PROJECT FOR CHEVRON AND ATTENDING INTERCONNECTING PIPELINES BY HIYUNDAI HEAVY INDUSTRIES (HHI), FORSTER WHEELER, WILBROS ETC. FOR CHEVRONS FROM HOUSTON USA, TO SEOUL KOREA TO ESCRAVOS NIGERIA UPFRADING THE PLANT FROM 285MMSCF/D TO 600MMSCF/D PROCESSING CENTER EGP 3A AND 3B. INCLUDING THE OFFSHORE PLATFOR, 24", 12" ETC PIPELINE INTERLINKS

23. 14/06/80-20/05/2010 SITE REPRESENTATAIVE SEPERVISING USAN SUBSEA PRODUCTION

SYSYTEMS DETAILED ENGINEERING, CONSTRUCTION OF FACILITY MANIFOLDS, CHRISMASS TREES, WELHEAD, UMBILICALS JUJMPERS ETC. WITH CAMERON LTD IN EGHAM, SURREY UK AND WARRI AND PORT HARCOURT NIGERIS INCLDING THE ROV, IWOCS IN LEEDS, CONTROLS AT CELLE IN GERMANY, XT IN CIMS -(COST $1.2BN)

MALAYSIA, HOUSTON FOR THE CONNECTION SYSTEMS ETC.

24. 01/01/11 - 15/10/14 PROJECT ENGINEER ASSA NORTH (ANOS) GAS DEVELOPMENT

25. 01/08/12 -15/10/2014 PROJECT ENGINEER EXXONMOBIL IPP & SHELL'S SOKU GAS

UPGRADE

26. PETROLEUM PRODUCT MARKETING OF: AGO, D6, ATK –JET- MARKETING WITH NORTHBIDGE ERNEGY USA – 02/2020 – 01/09/2021

27. CONSULTANT TO AKEA AUTOMATIONS SOLUTIONS –IN HOUSTON TX. FROM 03/2021 - 11/04/2021

28. APPOINTMENT SETTER- MOMENTUM SOLAR, HOUSTON, TEXAS-USA FROM 03/14/2022 TO DATE (04/01/2022)

14. COMMENDATION LETTER

BRAVERY AND OUTSTANDING CONTRIBUTION IN FIRE FIGHTING AT WARRI FCC IN AUGUST 1987

OUTSTANDING PERFORMANCE AND CONTRIBUTION TO ESCRAVOS GAS PLANT FEED AT PARSONS ENG. AND CHEMICAL COMPANY IN HOUSTON TAXES FOR EGP 3A. ONSHORE BY CHEVRONTEXACO IN 2002.

15. HOBBIES

LISTENING TO OLD MUSIC (OLD SKOOL)

FOOTBALL (SOCCER) WATCHING

MOVIES WATCHING

READING NOVELS AND BIBLE

16. REFEREES

Engr Dennise Ajulu, GED, REFINING & PETROCHEMICALS - NNPC TOWER, ABUJA, Nigeria.

. (DR) Charles Unfongene Consultant at Ciena Corporation Vernon, CT, USA

Anthony Osakwe, IT Specilist, Private Bank, Pembroke Pine, FL, USA



Contact this candidate