Post Job Free
Sign in

Mechanical Engineer Water Treatment

Location:
Calamba, Misamis Occidental, Philippines
Salary:
Negotiable
Posted:
June 18, 2025

Contact this candidate

Resume:

Allan B. Villanueva

Nationality: Filipino

Marital Status: Married

Passport No.: P1503509C / Valid until: 30-AUG-2032 Present Address: 334 Aries St., Sitio Lote, Lecheria, Calamba City, Laguna 4027, Phils. Mobile: 090*-***-****

E-mail1: *****.*****@*****.***

Skype ID: **********@*****.***

Fields of Experience

Waste Water Treatment/Lift Station/Sewage Treatment Plant/Refinery / Petrochem / Upstream Oil & Gas / Tank Farms / Vertical Construction (MEPF) / Power Plant Education

1987 – 1992 Bachelor of Science in Mechanical Engineering Colegio de San Juan de Letran, Bucal, Calamba City, Laguna 1995 License No.: 0048704

Software Exposure

Plant Design System (PDS), Plant Design Management System (PDMS), SP3D SmartPlant Review (SPR), Navisworks

Microstation, AutoCAD

MS-Office Word, Excel, Powerpoint, MS Project

Career Summary

More than 27 years of experience in piping design of which 7.5 years are in field works with career highlights as follows:

Experience in Design Preparation of Piping Layouts for Water Supply, Waste Water Treatment, Lift Station, Sewer Treatment Plant, Oil & Gas, Combined Services Engg., Mechanical Block Work, Isometrics, Design of Pipe Supports, Lifting Davit Design, Pipe Spooling, CAD Detailing - Mech/Pip/Struc, MEPF, Field Works.

Familiarity with General Arrangement Plan, Plot Plan, PID, Linelist, Equipment Vendor Data, International Codes & Standards such as ANSI/ASME/JIS/ASTM/AS/BS/EN/NFPA/AWWA/DIN.

Compliance with Industry Standard Codes and Company established standards.

Manage time effectively by doing quality works on-time and one time.

Effective application of Lessons Learned by continued review and enhancement of skills.

Support other engineering disciplines as may be required. Professional Experience

ASCOF Construction, Inc. May 16, 2018 – 2026 (Present) U903, Park Trade Center Bldg., 1716 Investment Drive, Madrigal Business Park, Brgy. Ayala Alabang, Muntinlupa City, 659-3361 to 63 Position: Mechanical Design Engineer

Projects:

1. VRC/Nangka Lift Station (MWIC) 2026 (On-going)

2. EICDC Lift Station (Maynilad) 2026 (On-going)

3. NPP2 Lift Stations (MWIC) 2026 (On-going)

4. ATI Pier 3 Standpipe & SCADA Ext. Project 11/17/2020 - 2026 (on-going) 5. 30 MLD STP/14 MLD REUSE Filinvest Project 8/14/2023 - 2024 (on-going) 6. Pinugay Deepwell Rehab. 11/20/2020 – 2022

7. 570 CMD Westborough STP 11/04/2019 – 2022

8. 210 CMD SM Hope Residences STP 05/05/2019 - 12/15/2021 9. Tagum Bulk Water Supply Project 05/20/2018 - 10/15/2019 Job Responsibilities:

Participate in pre-bid & kick of meeting with clients and subcontractors, prepares Basis of Design and Detailed Engineering Design.

Conduct Design of Lifting Davits, Sluice Gate, and Design Calculations.

Conducts design and hydraulic analysis of piping for WWTP, Utility Services, and Standpipe Fire Protection System.

Conducts Piping Layout & modelling, design of pipe support, isometric layout and clash detection of other services and Design Calculation.

Coordinates with clients, consultants, suppliers and contractors to ensure availability of materials, analyze specification and cost analysis of materials against current market price.

Preparation of Individual Services Layouts and Detail drawings for Coordination checking of Facilities such as Piping, Plumbing & Drainage, and Fire Protection System.

Preparation and submittal of materials and design drawing to client for application to code 1 approval.

Review of Scope of Work, prepares project schedule and progress report of the assigned area.

Coordinates with site Engineer’s for problem mitigation arising out in discrepancy in design models. Quest Air Technology Philippines, Inc. May 04, 2017 – May 15, 2018 Lot 7A-2, Sooner Farm Cpd., Brgy. Timbao, Biñan, Laguna, 049******* Position: Mechanical - Project Engineer

Project: Ventilation and AC of Putatan Water Treatment Plant 2 05/04/2018 – 05/12/2018 Project: Biotech BioGas Power Plant, South Cotabato, Phils. 05/04/2017 – 05/03/2018 Job Responsibilities:

Participate in kick of meeting, monitor all project activities, understand technical specs., validates technical decisions; ensure compliance of the safety guidelines, report non-compliance, coordinate works at site and meet delivery timelines.

Maintain good rapport and close relationship with clients, consultants, and contractors to ensure smooth and efficient implementation to project and liaise with procurement and logistic on equipment.

Lead, manage, and supervise a team of sub-contractors and submit documentation to client.

Prepares As-built plans for Waste Water Treatment, hot & Cold Water Process Line and Biogas Process Pipe line.

Preparation of documentation like Method Statement, Inspection Test Plan, and Material Specification for client review.

Attended initial safety compliance seminar

Fluor Daniel, Inc – Philippines April 20, 2015 – April 19, 2016 Asian Star Bldg., Filinvest Corp. City, Alabang, Muntinlupa City 1770, Phils. +632******* Position: DE II – Mechanical/Piping Designer

Project: Combined Cyle – Charlotte, Citrus County 6/29/2015 – 04/19/2016 Project: BASF Lemongrass Process Plant 4/27/2015 – 06/19/2016 Job Responsibilities:

Conduct Piping Layout & modelling, pipe support design, isometric extraction/checking, clash checking.

Review of Scope of Work, prepares schedule and progress report of the assigned area.

Materialize close communication with leads and designers to mitigate discrepancy in design models.

Conduct Global integration of design models and pipe supports into the network, thru the client software, by work share imports to increase production in real time.

Sketch piping layout, pipe support & vessel clips design, isometric checking, clash checking

Review of Scope of Work, prepares schedule and progress report of the assigned area.

Coordination with project leads, designers, stress, mechanical, and instrumentation groups to solve problems on constructability issues and Line List data discrepancy. Chiyoda Philippines Corp. October03, 2011 – April 17, 2015 Sun Plaza Bldg., Shaw Blvd., Brgy. Wack Wack, Mandaluyong City 1555, +632******* to 85 Position: Mechanical/Piping Designer

Project: CBI LNG Engineering Design Phase 2/23/2015 – 04/17/2015 Project: TGH ISO Extraction 10/7/2014 – 10/31/2014 Project: Tokuyama Malaysia Polysilicon Plant (TMP2)/ (Mechanical/Piping Line Checker) 11/20/2012 – 12/29/2013 Chiyoda Malaysia SDN BHD, Bintulu, Semalaju, Sarawak, Malaysia Project: Tokuyama Malaysia Polysilicon (TMP2)/ (Mechanical/Piping Jr. Designer) 2/16/2012 – 11/11/2012 Project: Tokuyama Malaysia Polysilicon (TMP1)/ (Mechanical/Piping Jr. Designer) 11/17/2011 – 2/28/2012 Job Responsibilities:

3D model review/clash check using Navisworks and squad checking of PID.

Sketch of pipe route (2” and below) and design of pipe supports prior to model input (by drafters).

Coordination with area lead and drafters to mitigate problems arising from execution of works.

Squad checking and proof checking of isometrics as per client mark-ups (Pre-ISO/final/IFC).

Prepare mark-up ISO for model input (by drafters).

Review of Equipment Vendor data, PID, and Linelist to verify integrity of model and commodities.

Model review to identify clashing using SmarPlant Review (SPR).

Monitor transmittal/upstream data to identify changes on Equipment Vendor and ISO duplication.

Coordination with area lead and drafters to mitigate/resolve mark-ups and iso extraction errors.

Monitoring of deliverables and preparation of progress report. FIELD WORKS:

Review of Scope of Work and prepares documents, safety gadgets and tools for line checking.

Field work: prepares Engg. ISO, Plot Plan, PID, Test Package.

Prepares punch list of rejected commodities for re-work by constructors.

Monitoring of remedial works, sketch Field Design Change (FDC) ISO for as-built, and CAD input.

Coordination with Area Supervisors to punch kill and repair Test Package.

Assigned to work with other groups, i.e., Test Package preparation, MSP review & line check of tapping points prior to PMC activity, line checking of TMSB client comments, and spray testing. Forssman HK88, Ltd. April 1, 2010 – Sept. 30, 2011 Prince Bldg., 117 Rada St., Legaspi Village, Makati City 1229, Phils., +632******* Position: Mechanical/Piping Engineer

Project: Chevron – Pandacan Terminal Loading Bay 7/15/2011 – 8/15/2011 Project: Chevron – Amlan Terminal Loading Bay 5/1/2011 – 6/1/2011 Project: Chevron – Sasa 10/5/2010 - 30/2010

Project: Buro – Happold (Drafter (Support Group) 7/1/2010 – 9/30/2010 Project: SIDRA- KSA (Checker (Support Group) 4/3/2010 – 6/30/2010 Job Responsibilities:

Field checking/dimensioning /As-builting of existing piping system, Tank Farm, Tanker Truck Loading Bay, and Fire Protection piping.

Conceptual design of natural and mechanical ventilation system.

Design of additive line E100 (Ethanol) unloading and E10-blended loading.

Modification of Foam fire fighting system.

Hydraulic calculation for E100 and E10 piping system & revision of PID’s, and pump sizing.

Preparation of sketch for Cad input (by drafters) c/w MTO and pipe supports.

Preparation of mark-up iso, proof checking, and progress report of deliverables. As Support Group:

CAD input for Architectural works

Preparation of Individual Services Layouts and Detail drawings for Coordination checking of Facilities such as Plumbing, Sanitary

& Drainage, and Fire Protection System

Forssman Pacific Corporation May 29, 2006 – March 31, 2010 Prince Bldg., 117 Rada St., Legaspi Village, Makati City 1229, Phils., +632******* Position: Mechanical/Piping Engineer

Project: Chevron – Zamboanga Terminal 3/3/2010 - 3/302010 Project: Chevron – Jimenez Terminal 2/5/2010 - 2/282010 Project: KASCH, KSA (Checker - Support Group) 3/1/2009 - 12/10/2009 Project: Voltas, Qatar (Checker - Support Group) 2/3/2009 - 2/25/2009 Project: Buzwagi Gold mining 12/8/2008 – 1/ 25/2009 Project: Buzwagi – Lycopodium Tanzania Ltd. Gold Mining (Support - CAD Draft person) 4/18/2008 – 11/9/2008 Lycopodium Minerals Ltd., Level 5, Adelaide Terrace, East Perth, W.A. 6892 Australia Project: Al-Wakra (Checker - Support Group) 11/5/2007 – 3/5/2008 Project: Chittick – Mindanao Coal Mining Deluge Fire Protection (CAD Engineer) 3/29/2007 – 4/10/2007 Project: Lycopodium – Akyem Gold Mining (CAD Engineer) 3/29/2006 – 3/30/2007 Job Responsibilities:

Field checking/dimensioning /As-built of existing piping systems.

Design of additive line E100 (Ethanol) unloading and E10-blended loading.

Hydraulic calculation, pump sizing, & revision of PID.

Preparation of Individual Services Layouts and Detail drawings for Coordination checking of Facilities such as Plumbing & Drainage, and Fire Protection System

Preparation of sketch ISO for Cad input (by drafters) C/W pipe supports and MTO.

Preparation of mark-up ISO (ENG to IFC), proof checking, and progress report of deliverables. AS CAD DRAFTPERSON

CAD input (Pip, Mech, Struc) on GA Plans, Detail, and isometric, file cleaning and binding.

Review 3D piping model for clash checks.

Coordination with Area Lead for problematic mark-ups.

Prepares progress report of CAD activity.

Preparation of Individual Services Layouts and Detail drawings for Coordination checking of Facilities such as Plumbing & Drainage, and Fire Protection System

AS CAD ENGINEER

Isometric layout preparation from GA plans and Details, c/w pipe tagging, instrument annotations and call-outs, fittings and transition couplings, pipe supports, and other piping commodities.

Proof checking of Isometric based on checklist such as flange & valve orientation, Northings, equipment locations, and instrument specs, and dimensions.

CAD input, preparation of check prints, and back drafting.

Coordination with Area Lead for problematic mark-ups. Kasumi Industrial (Phils.) Corp. April 25, 2005 – April 25, 2006 CIP II, Brgy. Punta, Calamba City, 4027 Philippines Production Engineer Job Responsibilities:

Repair & maintenance of CNC machines, machine & robot arm programming, fabrication of jigs, tool set-up, calibration for test piece, monitoring, and quality checking of the production hub.

Trained on quality control & testing, and production procedures and set-up.

Recommends process improvement to maximize production.

Attends weekly meeting and suggest counter measures to improve condition. MMLRT Consultants – Proconsult, Inc. January 6, 2003 – June 15, 2004 E. Rodriguez, Q.C. Trackwork Engineer

Project: MMLRT2 Mass Transport System

Job Responsibilities:

Project monitoring, quality control inspection & testing of form works, concreting, track laying, thermit welding, de-stressing of rails, installation of rail fasteners, guard rails, buffer stop, special track works, track levelling & alignment, checking of as-built survey data, and track geometry.

Punch listing and performs joint inspection of all remedial works.

Prepares progress and accomplishment report and documentation of original inspection results. Technirail – Transurb May 15, 2001 – December 16, 2002 LRTA Cpd., Gate II, Aurora Blvd., Pasay City Track Leadman Job Responsibilities:

Prepares schedule for annual and semi-annual preventive and corrective maintenance along the mainline track, and depot area.

Inspection of general track condition along the revenue line, depot area, & permanent ways facilities such as carriage way, copings, girders, and columns.

Adjustment, repair and maintenance such as replacement and thermit welding of wornout rail, turn-outs, defective ballast and ties, broken insulating rail pads, base plates, rail fasteners, and NDT of weld joints.

Coordinate with other departments, divisions, and sections before proceeding & after the work.

Responsible for the safe-keeping and up-keeping of tools and equipments.

Observes and complies with the safety rules, regulations, and proper work ethics. Metro Transit Organization, Inc. June 3, 1996 – September 29, 2000 LRTA Cpd., Gate II, Aurora Blvd., Pasay City Q.A. Engineer Job Responsibilities:

Actual testing, inspection, and evaluation of all LRV (Light Rail Vehicle) parts, i.e., Rolling Stock, Stationary Equipment, Track Works, and Electronics.

Coordination with PIC regarding proper conduct and work ethics of working personnel upon the repair and maintenance works.

Reviews and upgrades methodologies in the evaluation of materials for localization.

NDT, i.e., Magnetic Particle and Ultrasonic testing (MT, UT), and monitors actual life performance to establish service life .

Observes company Rules and Regulations.

Asia Brewery, Inc. March 16, 1994 – March 15, 1996 Bo. Sala, Cabuyao, Laguna Cadet Engineer

Project: 24 MW Diesel Power Plant

Job Responsibilities:

Assists on the design of pipe bridge to support piping systems (oil, steam, and water).

Design and drafting of bunker & diesel fuel oil, potable and de-mineralized water, Firewater, and saturated steam piping systems, and BOM for the approved design, and MTO for purchase and fabrication works.

Conducts inspection, prepares punch list, and monitors rectification works.

Coordinates with contractors for logistics, percent work accomplisment and design changes.

Attends weekly meeting to discuss progress, bottlenecks and recommend solutions. Training and Seminars

Construction Occupational Safety and Health (COSH), ASCOF Const, Inc. (04/19-23/2021) Principles of Effective Pipe Support Design, Fluor Daniel, Inc. (02/21/2016) Basic Stress Engineering, Fluor Daniel, Inc. (10/17 – 11/21/2015) Level 1 Training, Chiyoda Phil. Corp. (12/5/2014)

Mock-up Training for CBI Project (09/15/2014 – 10/03/2014) 3D PDS Modelling, Chiyoda Phil. Corp. (07/18 – 07/25/2014) Fundamental Training for JD (06/24 – 07/15/2014)

Microstation Hands-on Training (06/18/2014)

3D PDMS Modelling, Chiyoda Phil., Corp (03/05 – 03/13/2014) ISO to Plan Conversion (01/28 – 02/27/2014)

Drafting Training & Techniques (01/21 – 01/23/2014) PERT/CPM Training, Paco, Manila, Philippines (1999) Welding Steels, Cast Iron & Aluminum, METRO, INC., Pasay City, Philippines (1999) Technical Report Writing for Engineers, Paco, Manila, Philippines (1998) Lubrication Training, Paco, Manila, Philippines (1998) Basic Non-Destructive Testing, Metals Industry Research & Dev’t Center (MIRDC), Taguig, Philippines (1998) Basics of Welding, National Engineering Center (NEC), University of the Philippines, Quezon City, Philippines (1997) Affiliations

Philippine Society of Mechanical Engineers 1995 - 1996 Philippine Society for Non- Destructive Testing, Inc. November 14, 1997 Personal Details:

Sex: Male

Marital Status: Married

Passport No.: P1503509C

Date of Expiry: 30-AUG-2032

Language Known: English / Filipino

Declaration:

I hereby certify that the above information is true and correct and to the best of my knowledge and belief. Place: Philippines

Date: June 2025

Yours Truly,

Allan B. Villanueva



Contact this candidate