Post Job Free
Sign in

Mechanical Engineer

Location:
Oakville, ON, Canada
Salary:
60000
Posted:
June 17, 2025

Contact this candidate

Resume:

BENG in Mechanical Engineering

Reviewed, Analyzed and Updated ISO documentation. Exercised

strong attention to detail as mistakes could have dire consequences during audits.

Improved line efficiency by designing weld fixtures and spot weld jigs. Performed PFMEA's and 8D strategies to solve complex cross- departmental problems.

Used my presentation and training skills to implement a new production inspection system across two entire plants. Used operator feedback and time-studies to revise system for efficiency while still staying within ISO regulations.

Designed a full SolidWorks assembly of a toy wooly mammoth including all individual screws, body parts, gears, shafts, and the motor of the mammoth.

Used Kalipers and online image processing methods to measure each part of the toy accurately so that the assembly fits and moves properly. Used SolidWorks 2D drawing feature to make proper engineering drawings of all important sub-assemblies.

EXTRACURRICULARS

EXPERIENCE

EDUCATION

Robotic Mammoth ENG 2100

Hammond MFG Process Engineer Guelph, Ontario

Jan 2017 - Sep 2017

Jan 2022 - Feb 2022

Jan 2023 - Sept 2023

JASON MECHANICAL ENGINEER LAKSHMAN

********@********.**

https://www.linkedin.com/in/jason-lakshman/

647-***-****

CAD

CAD

UNIVERSITY OF GUELPH

Sep 2019 - April 2025

Solidworks CSWA Certificate

WHMIS Certificate

Excellent Time Management

and Organizational Skills.

Strong Verbal and Written

communication skills.

Strong Attention to Detail

Started a Lawn care business

by presenting the idea to city

council and obtaining a $5000

student business grant.

Maintained lawn care

machinery by changing oil, old

parts and inspecting the

belt/chain drives for wear.

Obtained many clients through

aggressive social media

marketing and made a

considerable profit.

CJ Lawnservice

SOFT SKILLS

CERTIFICATIONS

PROJECTS

SolidWorks & Allen-Bradley

Studio 5000 used on various

projects involving the design

and implementation of

several fixtures.

Applied Lean Six Sigma

principles and statistical

process control to improve

manufacturing efficiency and

reduce variation

Used C++, Java, PHP, HTML

and SQL to design and

update webpages.

Proficient with Microsoft

Excel and Microsoft Word

TECHNICAL SKILLS

Honest and Virtuous

Conducted statistical analysis using Minitab and implemented SPC control charts (CPK) to verify process stability and capability. Completed several development plans for Magna parts and conducted cap/process studies to ensure parts are ready for production Organized the factory floor and made sure all documents were up to date for 3 audits throughout the summer to ensure ISO ceritification Gained crucial knowledge and experience with the tooling behind injection molding machines and measuring difficult parts with a CMM machine.

MPC Quality Assurance Engineer Barrie, Ontario May 2022 - Aug 2022

CAD

Designed and built manufacturing and robotic fixtures using DFM/DFA principles to reduce cycle times and improve process reliability Developed and executed control plans, engineering change notices

(ECNs) and time studies to support continuous improvement initiatives Implemented mistake-proofing (Poke-Yoke) techniques and plant-wide safety solutions to minimize production errors and enhance workplace safety

Led 8D investigations on production defects, using Fishbone Diagrams and 5 Whys to identify root causes and then implemented corrective actions, resulting in a significant reduction in line PPM Mancor Industries Mechanical Engineer Oakville, Ontario Apr 2025 - Present

Keyence Quality Assurance Project - Mancor RWD

High-Volume Robotic Weld Fixture- Mancor RWD

What?

Developed Cobot Nut Welding Fixtures,

Robotic Welding Fixtures and Manual

Welding Fixtures for Operators

What?

Worked with Production to install new

Keyence Camera for checking nut

alignment of Channels on Production

Line

How?

Worked with Keyence to find

Appropriate Solution for Line

Programmed Sensors and Ran Cap

Studies to ensure Performance

Results

Completely Eliminated Winking

Nut Defect for Production Line

and Solved Customer Issue

Obtained Relationship with

Keyence

What?

Developed Production Carts for Heavy Part Bins

Constructed Safety Guarding from Forklifts for

Electrical Boxes

How?

Laser Cut Sheet Metal, Bought tubing for frame

and Appropriate Caster for calculated load.

Welded all components to create Cart

Welded Tubing to Posts and Laser Cut Metal

Frame to Absorb Impact from Forklift Forks.

How?

Used Solidworks to develop 3D model of

Fixtures after taking appropriate

measurements and using DFA techniques

Bought Components from McMaster Carr

and assembled myself.

JASON MECHANICAL ENGINEERING AT LAKSHMAN THE UNIVERSITY OF GUELPH ********@********.**

https://www.linkedin.com/in/jason-lakshman/

647-***-****

Production Carts and Safety Guarding - Mancor RWD

Results

Drastically Improved Weld

Quality and Process Time

Reduced Downstream

Assembly issues using Poke

Yoke Techniques to reduce

variability



Contact this candidate