Construction Project Quality Control

Location:
Doha, Qatar
Posted:
June 15, 2025

Contact this candidate

Resume:

Belal Ahmad Khan

Project Quality Head /Lead/Sr.QA/QC Engineer

Doha - Qatar, Mobile # +974-********; Email: **************.******@*****.*** SUMMARY OF EXPERIENCE: -

** ***** ************ ********** in the oil and gas industry, with particular focus on brownfield and greenfield projects, and in-service modifications to existing LNG facilities together with maintenance and shutdown activities across India, KSA, & Qatar in Quality Assurance and Quality Control, during FEED/detail engineering, procurement, and construction project phases, review of several EPC deliverables, including coordination of third-party source-inspection activities and provides ongoing leadership and support to ensure project’s compliance. REPORTING: -

Quality focal point, interfacing with the FEED/Engineering sub-Contractor, Project stakeholders and associated Sub-Contractors & Vendor, to ensure QA/QC compliance within the project execution phases, and up to the final handover. Frequent interface with project management team (PMT), QA/QC section and sub- Contractor’s & Vendors QA/QC personnel, Major Projects independent auditors. Responsible for the effective coordination of the integrated Audit Program with Major QatarEnergy projects including project audit activities, administration, and reporting. Frequent interface with Engineering & Fabrication/Painting sub-contractors, NDT Contractors, Vendors, Manufacturers, Suppliers, and (TPIA/TPCA) third-party inspection/certification agencies.

CERTIFICATIONS: -

CERTIFICATION TYPE INSTITUTION YEAR

Training on CMQ/OE (Quality Management/Organizational Excellence) Chicago Training Institute, Qatar Feb 2025 CSWIP-BGAS Grade – 2 TWI-UK Apr 2024

Certified International Welding Engineer (IWE) as per IAB- 252 requirements

IIW – India Oct, 2020

American Society for (NDT) Non-destructive Testing

(ASNT) Level II certificates in DPT/PT, RT, MPI, UT Welding & NDT Services, India Nov, 2013

Internal Quality Auditing for ISO 9001-2008 TUV NORD, Saudi Arabia April, 2012 Advanced Post Graduation Diploma in Piping Design and Engineering with PDMS

Dimensional Academy of

Engineering, India

July, 2014

IRCA Certified ISO 9001:2015 Lead Auditor Edullence education excellence, India

Oct, 2018

ISO 14001:2015 Lead Auditor Anderson and Aubert Consultancy Services, Qatar

Jan, 2019

ISO 45001:2018 Lead Auditor Anderson and Aubert Consultancy Services, Qatar

April, 2019

Training for GRE Pipes, Fittings and Lamination Joints Future Pipe Industries-Qatar April, 2020 Internal Quality Auditing for IMS AGIES, Qatar June, 2019 ISO 9001:2015 Awareness & Internal Auditor TUV Nord, Qatar June, 2020 ISO 14001:2015 Awareness & Internal Auditor TUV Nord, Qatar June, 2020 OHSAS 18001:2007 Awareness & Internal Auditor TUV Nord, Qatar June, 2020 Lean Six Sigma Black Belt Anexas Denmark, India Dec, 2010 Auto-Cad 2006, Pro-e Wildfire 2.0, CatiaV5R12 Tangent Technology, India Dec, 2007 Belal Ahmad Khan

Project Quality Head /Lead/Sr.QA/QC Engineer

Doha - Qatar, Mobile # +974-********; Email: **************.******@*****.*** EDUCATION/PROFESSIONAL QUALIFICATION: -

Bachelor’s Degree in Mechanical Engineering in 2008 CORE COMPETENCIES: -

Proven track record to deliverance in challenging project environments in a Senior Quality role. Successful quality completions of Piping, Pipelines Projects from FEED to Pre-Commissioning, Commissioning, and Handover activities.

Development and delivery of External & Internal Audit Programs along with Quality Surveillance Programs.

Experienced in facilitating & coordinating efforts to resolve interfaces issues Quality Management System programs and procedures for Vendors and sub-contractors Extensive knowledge of Civil, mechanical, welding, structural, electrical and instrumentation QA/QC processes and techniques.

Experienced in leading a team of multi-disciplined inspectors (Civil, Piping, Welding, Electrical

& Instrumentation and Coating/Insulation) and demonstrated shutdown experience. Knowledge of applicable Codes/ Standards e.g., ISO 9001, ISO 14001, ISO 45001, API Spec Q1, API Spec Q2, ISO/TS 29001:2010, ISO 19011:2018, ISO 10005:2018, ISO 10006:2017, ISO 9004:2009, ISO 10002: 2018, ISO/TR 10013:2001, ISO 10015: 2019, ISO 17020:2012, QCS, Shell DEP, EEMUA 190, BS EN ISO 15614-1, PD5500, QP-STD-R-001, QP-STD-R-002, QP-STD-R-003, QP-SPC-L-002, QP-STD-R-008, CORP-QAL-STD-004, CORP-ENG-STD-036, CORP-ENG-STD-022 etc.

SKILLS: -

Hands on knowledge in Source Inspection Management Program, prepare a source inspection plan for an entire project and review ITPs for each equipment item, selecting source inspectors to match their skills and training with different types of equipment with different risk levels, scheduling and conducting significant source inspection events, such as the pre- inspection (fabrication kick-off) meeting, the vendor quality coordination meeting, final acceptance testing, and reports review.

Implement procedures related to the quality management system including project quality plans, execution plans, procurement plans, materials criticality ratings, etc. Strong leadership and interpersonal skills, and a demonstrated ability to work as a team member under tight project schedule constraints.

Validated experience in practical aspects of welding technology, inspection and materials selection in a relevant position within the oil and gas/ power and energy industry sectors. Experience in QC coordination and inspection activities during procurement, fabrication, installation, hook-up and commissioning of oil and gas production facilities project. Experienced in coating specifications and inspection Strong qualitative and quantitative analytical skills. Excellent written and oral English language skills. Belal Ahmad Khan

Project Quality Head /Lead/Sr.QA/QC Engineer

Doha - Qatar, Mobile # +974-********; Email: **************.******@*****.*** PROFESSIONAL EXPERIENCE DETAILS: -

Duration Designation Department Name Company Name

Feb 2023 to Till Now QA/QC Representative QHSE Department Roots Energy & Engineering Services Wll – Qatar

Dec 2021 to Jan 2023 Lead QA/QC Engineer QA/QC Department Almana Engineering & Contracting Co – Qatar

June 2019 to Dec 2021 Lead QA/QC Engineer QHSE Department Roots Energy & Engineering Services Wll – Qatar

Oct 2017 to June 2019 Lead QA/QC Engineer QA/QC Department China Petroleum Engineering and Construction Corporation (CPECC) – Qatar

Dec 2014 to Dec 2016 QA/QC Engineer –

Mechanical QA/QC Department Roots Energy & Engineering Services Wll – Qatar

Sep 2012 to Nov 2014 QA/QC Engineer –

Mechanical QA/QC Department Bridge And Roof Co. (I) Ltd – India May 2011 to July 2012 QA/QC Engineer –

Mechanical QA/QC Department Saudi Factory Fire Equipment Co. (SFFECO) Riyadh, Saudi Arabia

Apr 2008 to April 2011 QA/QC Engineer –

Mechanical QA/QC Department John Oil & Gas Limited – India VARIOUS PROJECT HANDLED: -

COMPANY PROJECTS HANDLED CLIENT CLIENT

APPROVAL PROJECT DESCRIPTION

Roots

RLLPGBP /

GC23104000 EPIC for

New LPG Bottling

Plant at Ras Laffan

QatarEnerg

y

Welding

Engineer

(PIR/GC231040

00/EXT/TN/031

12)

The objective of the project is to install a new

Liquefied Petroleum Gas (LPG) bottling

plant and associated facilities at Ras Laffan

(Package 2) that will improve LPG cylinder and

bulk LPG supply resiliency in case of failure of

the existing LPG bottling facility in SAMI, Doha.

Scope of Work to be executed under this

contract which includes LPG Mounded Vessels,

LPG Bottling Package, LPG Bulk Truck

Loading/Unloading gantry,

buildings, infrastructure, and associated

utilities.

Roots

4373 / GC21107800

EPIC for Mitigation of

Hydrocarbon

Emissions from

QatarEnergy Refinery

Storage Tanks

QatarEnerg

y

QA/QC

Representative

(PNM/GC21107

800/EXT/TN/01

662)

The objective of the CONTRACT is to perform

Engineering, Procurement, Installation and

Commissioning (EPIC), in accordance to

QatarEnergy standards and procedures to

mitigate the hydrocarbon emissions from the

existing four, floating roof intermediate storage

tanks

(2107FA, 2107FB, 2107FC and 2107FD), and

thereby comply with the environmental

regulations as per CTO.

Procurement of all materials associated with

the fabrication and installation of the

refrigeration system and associated systems,

chillers, piping, and materials required for the

modification works relevant to the four existing

storage tanks (2107FA, 2107FB, 2107FC and

2107FD)

Roots

4202 / GC19109000 -

EPIC for Upgrade of

Station W1 for Gas

Supply to Facility E

QatarEnerg

y

QA/QC

Representative

(PNP/GC19109

000/EXT/TN/

6114

The project objective is to ensure uninterrupted

fuel gas supply to the new power and water

production plant, Facility-E.

The scope of this project includes engineering,

procurement, installation & commissioning

works for the upgrade of station W1 for gas

supply to facility-E, which includes the

following,

1. Installation of custody metering system, new

DG set along with Diesel storage tank etc. at

station W1

Belal Ahmad Khan

Project Quality Head /Lead/Sr.QA/QC Engineer

Doha - Qatar, Mobile # +974-********; Email: **************.******@*****.*** COMPANY PROJECTS HANDLED CLIENT CLIENT

APPROVAL PROJECT DESCRIPTION

2. Upgrade of utility, control & power systems

at station W1 to meet new requirements.

3. Demolition of existing facilities at station W1 which are not required after upgrade

4. Demolition of 30-inch bi-directional pipeline

between Stations W1 and W2 including pig trap

and other associated facilities & other

modification works at station W1 & W2

5. Relocation of Liquid KOD (Tag no. V-W5-

001B) from station W5 to W1 & necessary

modification & demolition works at station W5 &

W1

Roots

4222 / GC20103000 -

EPIC for Facilities

Modifications at RG

Plant

QatarEnerg

y

QA/QC

Representative

(PND/GC20103

000/EXT/TN/05

330)

The first objective is to provide an economically

viable means of establishing safe

operation of RG Plant, Dukhan at the

increased operating throughput of 880

MMSCFD (nominal design of 800 MMSCFD

plus 10%) by identifying the extent of remedial

action necessary to reduce noise and vibration

levels observed in the Plant, and

implementation of the same within the shortest

time with minimum disruption to plant normal

operations and shutdown. The second

objective is to implement the modifications

pertaining to the RG plant to

facilitate sustained NGL and condensate

production through the single column operation

option

Carryout the detailed Design and Engineering,

Procurement, Installation, Construction, Pre-

Commissioning, Commissioning, Performance

Testing and start-up of the Facility as described

in Part-A (EPIC for Mitigation of Noise and

Piping Vibration at RG Plant) and Part-B (EPIC

for Dukhan Production Facilities Upgrade

Phase 2 – RG Plant) as mentioned in the

CONTRACT.

Roots

4224 / GC22109200 -

EPIC For Upgrade of

Ethane Gas

Compressors at

Station V and

Associated Facilities at

Station S

QatarEnerg

y

QA/QC Lead

Mechanical

(PNP/GC22109

200/EXT/TN/00

484)

Upgrade each of the three existing ethane gas

compressors at Station V from 825TPD to

1900TPD, such that total system capacity of

3800TPD is achieved. Existing gas

compressors are supplied by OEM Ms.

HITACHI INDUSTRIAL PRODUCTS, LTD.

(JAPAN). The upgrade requires modification

works inside the OEM package boundary limits,

as well as modifications outside the package

limits in Station V, and Station S

ALMANA

4087/LC20104400-

Construction of

Support Buildings at

Dukhan-Phase 1

QatarEnerg

y

QA/QC Lead-

Mechanical

(PND/GC18105

400/EXT/TN/20

43)

QPSFA, Drilling Department, Pressure Test

Bay and all associated facilities and services.

The WORK shall include Pre-Engineered

Building (PEB), associated building services

and external works and the location is Dukhan.

ALMANA

4378/GC21107900-

Construction of

Support Buildings at

Dukhan-Phase 2

QatarEnerg

y

QA/QC Lead –

Mechanical

(PID/GC211079

00/

EXT/TN/00137)

QPSFA, Drilling Department, Pressure Test

Bay and all associated facilities and services.

The WORK shall include Pre-Engineered

Building (PEB), associated building services

and external works and the location is Dukhan

ALMANA

4272/GC20105800-

EPIC for Replacement

of Refinery Pipeline

Culverts in Mesaieed

Industrial City (MIC)

QatarEnerg

y

QA/QC Lead –

Mechanical

(PID/GC201058

00/EXT/TN/077

8)

The Project is to replace existing eight (08)

deteriorated culverts with new culverts in the

same locations over the QP Refinery pipelines

in MIC area (outside QP Refinery fence).

Belal Ahmad Khan

Project Quality Head /Lead/Sr.QA/QC Engineer

Doha - Qatar, Mobile # +974-********; Email: **************.******@*****.*** COMPANY PROJECTS HANDLED CLIENT CLIENT

APPROVAL PROJECT DESCRIPTION

ALMANA

4332/LC21105100-

Provision for Various

Access Platforms in

Dukhan Fields

QatarEnerg

y

QA/QC Lead –

Mechanical

Supply all material, labor, services, supervision, testing devices, warehousing, equipment, tools,

consumable materials and each and every item

of expense necessary for the design,

engineering and construction/installation of

various platforms.

ALMANA

4335/LC21104800-

Miscellaneous Civil

Works at Various

Locations in Dukhan

Fields

QatarEnerg

y

QA/QC Lead –

Mechanical

Supply of material, labor, services, supervision,

testing devices, warehousing, equipment, tools,

consumable materials and each and every item

of expense necessary for the design,

engineering and construction/installation of

Miscellaneous Civil Works at Various Stations

within Dukhan Fields.

ALMANA

4251/LC20101100 -

Epic for Fire Alarm

System at Various Mic

Operational Buildings

at Mesaieed

QatarEnerg

y

QA/QC Lead –

Mechanical

Installation and construction, pre-

commissioning, commissioning, performance

testing and start-up of the FACILITY.

Roots

4110/GC18105400 -

EPIC for Produced

Water Transfer Pumps

in Dukhan Fields

(DPFU-Phase1A)

QatarEnerg

y

QA/QC Lead-

Mechanical

(PND/GC18105

400/EXT/TN/20

43)

Upgrade (Phase1A) as related to augmentation

of existing Produced Water transfer pump

systems at various degassing stations and PWI

stations such that capacity of produced water

transfer pumps can meet increased Produced

water production demand in the future.

Roots

4118/GC18105700 -

EPIC for Upgrade of

Fire Water System at

KNDS and

Modification to Piping

Supports at Dukhan

Stations

QatarEnerg

y

QA/QC Lead-

Mechanical

Upgrade at KNDS includes implementation of

all recommendations at Khatiyah North

Degassing station as defined in FEED

documents. This includes modifications to the

existing fire water system at KNDS, along with

additional piping, equipment, F&G system

modifications

Roots

4119/GC18105600 -

EPIC for Automation

Upgrade at PWI,

CLUSTERS &

FNLGCS Stations in

Dukhan

QatarEnerg

y QA/QC Lead

Automation systems in PWI Stations, Clusters

and FNLGCS with the latest proven technology

and facilitate centralized operation and control

of these facilities from FNLGCS Control Room,

with PWI-1 station as backup. Provide F&G

coverage in PWI stations process area and

upgrade the fire alarm system in the buildings

at PWI stations and Clusters.

Roots

4167/ GC18107100 -

Supply,

Replacement/Installati

on and Commissioning

Of 33kv Equipment in

Dukhan Concession

Area

QatarEnerg

y QA/QC Lead

Demolition of existing 33KV switchgear and

RCP at PWI 1, 5, 7 & 8, Installation of new

33KV switchgear and RCP at PWI 1, 5, 7 & 8,

Demolition & Installation of new 33/3.3KV

transformer at PWI 5

CPECC

3963 / GC16101100-

EPIC for Replacement

of Old 3-Phase Test

Separators at All

Degassing Stations,

Dukhan

QatarEnerg

y

QA/QC

Engineer –

Mechanical

(EDD/GC16101

100/EXT/TN/35

94)

New 3 Phase Test Separators provided with all

instrumentation for operation, control and

monitoring. Active and passive fire protection

systems and F&G detection system in line with

existing system

Roots

3636/GC13107200 -

EPIC for new flare

ignition system in

Dukhan Fields

QatarEnerg

y

QA/QC

Engineer –

Mechanical

(OEE/TRAN/120

35)

A new flare ignition system shall be provided

under this CONTRACT with

latest technology based on FFG and HEI

ignition.

Belal Ahmad Khan

Project Quality Head /Lead/Sr.QA/QC Engineer

Doha - Qatar, Mobile # +974-********; Email: **************.******@*****.*** COMPANY PROJECTS HANDLED CLIENT CLIENT

APPROVAL PROJECT DESCRIPTION

Roots

3764/GC14100400 -

Epic of The

Replacement of

Instrument Air

Compressors K-1112

and K-1113 at Fahahil

Stripping Plant in The

Dukhan Fields

QatarEnerg

y

QA/QC

Engineer –

Mechanical

(EDD/GC14100

400/EXT/TN/10

02)

1. Air Compressor Package (inclusive of

suction filter, silencer, compressor, motor,

coolers, separators)

2. Air Dryer Package (inclusive of pre-filter viz. dirt filter, oil filter, activated carbon filter, air dryers, after filters)

A wet air receiver & a dry air receiver shall be

provided common for both the trains. All

associated piping, mechanical, instrumentation,

electrical, civil and other works (as applicable)

shall also be provided.

The Air Compressor shall be oil free- screw

type & the air dryer shall be heatless desiccant

type.

Roots

3299/GC-10106300 -

EPIC for automation

upgrade in Jaleha

degassing station

Dukhan

QatarEnerg

y

QA/QC

Engineer –

Mechanical

Modifications and upgrade to the existing

system at JMDS, along with additional piping,

HVAC equipment, F&G system modifications

Roots

3734/GC13111700 -

EPIC for replacement

of variable speed drive

systems & soft starter

unit’s production

station at recycle gas

plant in Dukhan

QatarEnerg

y

QA/QC

Engineer –

Mechanical

Fahahil Main and Jaleha MOL Pump Station

There are two (2) MOL pumps at KMDS Pump

Station with corresponding VSDS: one duty and

another standby. The production process

requires one unit to run. Both units were

manufactured by Hill Graham Controls and

shall be replaced. The replacement shall be

done sequentially to avoid plant

shut-down.

Bridge

and Roof

Co. (I)

Ltd

Various

Reliance

Industries

Limited,

Jamnagar

QA/QC

Engineer –

Mechanical

Field Fabrication & Erection of Above Ground

Piping and Structural Steel Work

SFFECO Various Various

QA/QC

Engineer –

Mechanical

Shop fabrication of fire extinguisher, Fire

hydrants & Cabinet, Fire doors, Fire pump,

Foam equipment’s.

Shop & Field Fabrication & Erection Piping and

Structural Steel Work related to Firefighting

system

John Oil

& Gas

Limited,

Gujarat

Various Various

QA/QC

Engineer –

Mechanical

Mechanical Works comprising of Fabrication &

Erection of Piping in Offsites Onshore Gas

Terminal

EQUIPMENT / PRODUCT EXPERTISE: -

Familiar with various manufacturers of compressor / turbine, preferably gas turbine generators including other rotating equipment, and related industrial specifications. Manufacturing and quality control requirements of rotating equipment in the form of API Standards on turbine drivers (i.e., Std 616), gear units and couplings, electrical equipment

(Generators) associated auxiliary systems related to Gas Turbine Generator like Fuel gas system, Combustion system, Oil system, Inlet & Exhaust system etc. and other API Standards covering machinery protection systems, rotor repair, machinery installation, reliability and maintenance data.

Belal Ahmad Khan

Project Quality Head /Lead/Sr.QA/QC Engineer

Doha - Qatar, Mobile # +974-********; Email: **************.******@*****.*** Familiar with the manufacture of gas turbine generator components (i.e., casings, shafts, combustion system and both compressor blades, with respect to materials of construction, heat treatments, surface treatments and coatings, etc. Experience in the Source Inspection of Rotating Equipment, with specific emphasis on gas turbines is preferred. Hands on knowledge in Source Inspection Management Program. API Centrifugal Pumps, EOT Cranes, Manual Hoists with Trolley, Nitrogen Cylinder Package, Fire Water Pumps Package, Fire Water Tank, Instrument Air Compressor & Dryer Package, LPG Bottling Package, LPG Mounded Storage Vessels, LPG Truck Loading Unloading Arm Package, LPG Truck Washing Package, LPG Vapor Recovery Compressor Package, Pre-Engineered Buildings (PEB), Weigh Bridge.

K.O. Drum Internals, Compressor Discharge after Coolers (Fin/Fan Coolers), Ethane Gas Compressor, Lube Oil Piping & Components, Seal Gas System Components, Corrosion Coupons/Assemblies-(Wetted),

Tank Geodisic Roof, Refrigeration Compressor, Pressure Vessels Process Service-Compressor KOD 1st Stage (Propane package), Light Naphtha Chiller, RON82 Chiller, RON90 Chiller, and Closed Drain Drum, Deluge Valves, Deluge Spray nozzles. Custody Flow Metering Package, Diesel Storage Tank.

Pressure Vessel, Produced Water Pump, Separator, Y-Type Strainers, Stock Pipes, Mill Pipes, Fittings, Duplex pipe and flanges, Deluge Skid, GRE Piping and Fittings, Firefighting Equipment, Restriction Orifice, Fire & Gas Device, Pressure Transmitters and Temperature Transmitters, Flow Meter.

Ball Valve, Control Valve SDV and BDV, Pressure Relief Valve, Air Relief Valve, Butterfly Valve, Manual Valve – Gate Valve, Globe Valve, Check Valves, Anti-Surge Valves, Normal Shutdown Depressuring Valve, Hot Bypass Valve,

BS & W Analyzers, Level Gauge, Level Transmitter.

Diesel & Water Storage Tanks, Fuel Gas Knock out Drums & Flash Ports Piping Supports, Metallic Structure, Skids, and Storage tanks, Valves, Flanges, Bolts and Nuts. Fiber Optic Cables (12 Core), CCTV & PA/CA, Fiber Patch Panels, CISCO Layer Switches, Panel Power Supply Unit, Telecom Bulks, Fire and Gas Panel, HSSD System, F&G Cables, detectors HV Motors (Main Compressor Motor), LV Motors (AFC motors), HV VSDS, Power, Control and Earthing Cables, Lighting Fixtures /JB's And Small Power Accessories, Isolators Firefighting system, Fire Suppression system, Novec System, Fire Extinguishers. HVAC Units (Package Unit, Split Unit), HVAC Control Panel, HVAC System Cooling Water & Gas Mixed piping assembly, Fabricated CS seam welded pipes. Instrument Air Receiver Vessel, SRU Incinerator Package & Ducting works, Cranes Fabrication, Skid Modules, Filters, Heat Exchanger & Furnace Accessories. Structural Steel Fabrication (Column, Beam, Frame, Post, Ladder, H-Brace etc.) Steel Galvanized Roofing/Sliding Sheets, Fabricated of chequred plates & Steel Grating HVAC Galvanized Ducts, Sacrificial anodes (Structure & Bracelet anodes) Lab test witness of mechanical test for WPS, PQR, HIC etc. Belal Ahmad Khan

Project Quality Head /Lead/Sr.QA/QC Engineer

Doha - Qatar, Mobile # +974-********; Email: **************.******@*****.*** JOB RESPONSIBILITIES: -

Major Responsibility as a Project Quality Head /Lead/Sr.QA/QC Engineer, Sr. Inspection Engineer, Welding Engineer, Sr. Welding Inspector involved in EPIC project through various Company and worked under QA/QC Department and Project management as Follows: Implements the Project Quality Management System and Project Quality Plan providing quality planning input to provide continuous support in line with corporate and industry standards, coordination, advice and Daily/Weekly Reporting to QatarEnergy. Ensure all activities to all areas of the vendors and Subcontractors’ organization applicable to the work being undertaken and include Engineering, Procurement, Fabrication, Installation & Construction, Pre-Commissioning, Commissioning and Handover activities as appropriate to the Contract scope of work.

Ensure to comply the requirements of latest ISO 9001, Contract, all applicable QatarEnergy Standards, International Codes & Standards, Shell DEPs & MESC, Project Specifications Coordinating the quality management activities of QA/QC team and maintaining interfaces between PMT's and QA/QC Team to ensure a consistent, effective Quality approach across the Project; monitors Sub-Contractors quality performance, provides, and distributes surveillance metrics as described in the QMS Control Procedures. Ensures the implementation of project-specific quality training and orientation; provides direction to the Project QA/QC Team in their daily Roles and Tasks. Lead and manage a multi-discipline QA/QC team, ensuring adherence to inspection and test plans throughout the project lifecycle.

Prepares and manages the Audit Schedule and stewards audit findings to resolution and closure.; reviewing and commenting on Sub-Contractors and Vendors schedule(s) for internal and external technical and quality audits, and the plans for each audit; ensuring Project Management Team reviews and, as required quality deliverables of Sub-Contractors and Vendors/suppliers (e.g., plans, Criticality Ratings, Inspection and Test Plans). Ensure certifications requirements detailed in the project specification, data sheets and associated criticality / inspection levels of the respective equipment / materials. Participate in the technical clarification meetings with suppliers and provide QA/QC input while concluding Technical Bid Evaluations (TBEs). Review and provide technical input on the SOW for Maintenance/construction contracts related to upgrade, repair/modification works, performing Technical Bid evaluations, review all vendor documents and ensure compliance to QA/QC requirements during execution including shutdowns.

Review and ensure that supplier QA/QC deliverables and resolve the comments before submission to QatarEnergy for approval. With an exception to standard bulk materials, when equipment / material requires EN10204-3.2 certification, relevant manufacturer documents

(ITP / MPS / FAT procedures etc.)

Participate and provide necessary inputs for Asset & Shutdown meetings, Lessons learnt, FRA, EMOC and RCFA from QA/QC perspective.

Belal Ahmad Khan

Project Quality Head /Lead/Sr.QA/QC Engineer

Doha - Qatar, Mobile # +974-********; Email: **************.******@*****.*** Verify the Mill Test Certificate (MTC), or Mill Test Report (MTR), is issued by a manufacturer to certify the chemical and mechanical features of a product and its compliance to the applicable norms and technical specifications for certificate EN 10204 2.1, 2.2, 3.1 and 3.2 Liaising with the Engineering during the life of the PO as needed on issues requiring technical interpretation/guidance in the performance of QS activities to confirm acceptability of QA requirements.

Ensure as per Contract and CR/QIL, Pre-Inspection Meeting shall be conducted as per the agenda points mentioned therein.

Ensure the Supplier inspection notifications are duly communicated to all concerned parties and ensure the availability of TPIA / TPCA / Client representatives as per the minimum notification period for inspection, as defined in Contract. Monitors and Reports Quality KPIs and TPIA / TPCA inspection report to measure and improve Quality Performance. Prepares and gains QatarEnergy approval of Weekly and Monthly Quality Reports.

Ensure that the engineering and designs comply with the Contract requirements including codes and standards. Provide guidance to the Sub-contractor and Vendors to promote compliance; verify compliance with the Contract and fitness for purpose of the delivered Phases of Design, Construction, Installation and Completions. Support Project Management team in monitoring the Sub-contractors and Vendor’s progress; support respective Managers in delivery of Quality for the Project; coordinate with Subject Matter Experts with respect to the disciplines involved in Quality aspects of the Project. Active part of the Sub-Contractors and Vendors meetings to address the Quality related. Responsible to manage the QA/QC Team on a daily basis to assure achievement of Project Quality Objectives through the Project Quality Plan, Surveillance Programs and ITP's. Develop, Implement External and Internal Project Audit Programs and to ensure implementation of the Project Quality Audit, Surveillance, SDR, NCR, Deficiency and other Project QA/QC Processes, Tools, Reports and Deliverables in line with QatarEnergy. Provide guidance on ISO 9001 standards, QMS documentation, and certification requirements to project and departmental teams.

Participate in the pre-qualification of Sub-contractors, and Vendors, ensuring compliance with ISO 9001 and industry quality standards.

Play a key role in technical bid evaluations, ensuring that bidders fully understand and commit to quality requirements.

Review and approve QA/QC documentation across all project phases, including welding and testing procedures.

Assess and respond to technical queries and deviations related to welding and non- destructive testing.

Oversee Sub-contractor and Vendors/suppliers engineering and construction deliverables, ensuring compliance with materials, corrosion, and special process requirements. Ensuring consistent and effective implementation of quality systems across organization (e.g., NCR, improvements, lessons learned, etc.)

Belal Ahmad Khan

Project Quality Head /Lead/Sr.QA/QC Engineer

Doha - Qatar, Mobile # +974-********; Email: **************.******@*****.*** Steward the NCR process for all identified non-conformances – including NCR/CAR issue, RCFA, disposition approval and close-out.

Reviewing and driving the status of welding projects, supporting resolution of issues, providing technical assistance and taking corrective / improvement action as required. Analyze project-specific requirements for welding and non-destructive testing (NDT) activities, interpreting regulatory and statutory requirements, codes and customer specifications regarding fabrication, welding and materials.

Coordinate, execute and control the Metallurgical and Welding activities in Projects and/or proposals in accordance with Project requirements within the assigned budget, time schedule and quality standards.

Understanding of National



Contact this candidate