Post Job Free
Sign in

Quantity Surveyor Contract Administration

Location:
Riyadh, Saudi Arabia
Posted:
June 13, 2025

Contact this candidate

Resume:

REXYEN GLENNIE OUTSCHORN (MSc QS, MRICS, MAIQS, IQSSL)

PERSONAL DETAILS

+966-**-***-****

***********@*****.***

Location: Riyadh, KSA and willing to relocate within Middle East region

Marital Status: Married with 3 Children

Immediately available for deployment

QUALIFICATIONS

MSc (Q.S.) Heriot Watt University, Dubai Campus (2010 – 2011)

National Diploma in Technology (NDT) (Civil Engineering)

University of Moratuwa, Sri Lanka (1999 – 2003)

PROFESSIONAL MEMBERSHIPS

MAIQS (2014)

MRICS (2015)

AIQSSL (2019)

APC Assessor for RICS

APC Assessor for AIQS

PROFESSIONAL TRAINING

Certificate in Commercial Arbitration ICLP (2022)

Certificate in Expert Witness

SLQS-Qatar (2021)

CESMM4 workshop

SLQS-Qatar (2019)

Claim Preparation and Dispute Management

CCM (2018)

Contract Administration – Advance Course DRSAM Fze (2013)

Sound Contract Administration

DRSAM Fze (2012)

Contract Administration for QS DRSAM Fze (2011)

CESMM3 workshop

TTS (2007)

EARLY CAREER HISTORY

Construction Superintendent State Development And Construction Corporation (Kegalle Water Supply Scheme)

Sri Lanka 2004 – 2006

Project Engineer cum Quantity Surveyor Shakkane Engineering (Pvt) Ltd (Rehabilitation Of A-9 Road)

Sri Lanka 2003 – 2004

KEY ACHIEVEMENTS

Red Sea Global

Used the PTCs as a tool to highlight the pricing unnormalizes

Successfully negotiated the Price based on detail analysis of unit rates

Mott MacDonald Ltd

• Established an effective communication channel with subconsultants

• Gathered key design information from designers working from various part of the world and incorporated into Tender documents.

Hill International:

• Established an effective way to track payment events and annual expenditure reforecasting

• Implemented an effective way to calculate material cost adjustments

Trafalgar Technical Services Limited:

• Conducted lengthy negotiations to finalize variation for 132KV cabling works

• Finalized a variation for increase in cooling capacity in sum of Dhs. 70 million in District cooling plant

• Ensured successful finalization of a variation for cost saving on waiver of FAT witnessing

REFERENCES

Available upon request.

PERSONAL SUMMARY

As a seasoned professional in commercial, cost, contract management and claims, I have 22 years of experience in the construction industry, including 19 years in the Middle East (UAE, Qatar, Kuwait, KSA).

I am dedicated to achieving project success through clear goals and a strong commitment to integrity, quality, and proactive planning. My leadership in client and contractor engagement fosters collaboration with project team. With extensive expertise in contract management. negotiations, cost controlling, and budget management, I effectively navigate challenges, always prioritizing quality, safety, and timely delivery.

AREAS OF EXPERTISE

Project Management Planning Timely delivery Quality Assurance Quality Control Negotiations Change Management Claim management Cost management and Cost Control MS Office Training Team Building Mentoring Team management Client satisfaction

PROJECTS

Airports Metro Infrastructure Mixed use Development Hospitality Projects Roads Pipework District Cooling Plant Dry and Wet Utilities 132/11kV Substation HV Cabling Passenger Terminal Building

CAREER HISTORY

Senior Manager, Cost Commercial and Procurement Red Sea Global KSA 2023 – 2025

Pre-Contract Management Pre-award to award

Roles and Responsibilities

Collating information Stakeholders Check for compliance and eliminate ambiguities Finalize the Employer’s Requirement

Negotiation meeting Preferred bidders Rates and qualifications

Compile Contract documents Agreed terms and conditions

Contract review meetings prior to execution Stakeholders

Procurement Specialist Secondment - Ashghal Qatar 2023

Roles and Responsibilities

Authenticate the Contractor’s IPA and Engineer’s Certification Authorize payment

Senior QS/ Lead QS/ Commercial Manger/ Contract Administrator Mott MacDonald Ltd Qatar Kuwait Abu Dhabi 2019 - 2023

Contract Administrator (Baniyas North Development Infrastructure, Streetscapes & Villas) Abu Dhabi

Mott MacDonald Ltd provided PMC services to Aldar on Baniyas North Development 3500 Villas with associated infrastructure works Three packages

Roles and Responsibilities

Contractual Correspondences the Contactors

Review and amend correspondences commercial and contractual compliance Technical team members

Change Management forms Employer’s protocol

Commercial and Contractual advice technical team

Review, Liaise, recommend cost impact assessment from Cost Consultant Proposed changes Liaise with Cost Consultant

Commercial Manager/ Lead Quantity Surveyor (Al Wakra Labour Accommodation and Integrated Families Housing) Qatar

Mott MacDonald Ltd provided PMO services to BARWA

Roles and Responsibilities

Managing Tender process to finalize the Commercially and contractually viable Contract, by prequalifying the Bidders, based on the project requirements; evaluating tender returns: prepare PTCs to eliminate any possible post Contact risks;

Tender evaluation Contractors Consultants Compile Contract documents

Commercial and Contracts Audits Issue Audit reports Consultants and Contractors

Claims Report to the Employer

Lesson learnt report to the Employer

Contractual responses to the Contactor Review correspondences from PMCM Commercial and Contractual compliances

Commercial and Contract advise Various issues

Independent report on Cost, Contractual and commercial impact assessment Proposed changes Cost assessment by Contractor and PMCM Finalize VO

Comparing pros and cons including Cost impact Available Options Recommend

Employer’s claims

Senior Quantity Surveyor (PPP advisory Team) Qatar

Mott MacDonald Ltd provided PPP Technical and commercial advisory services for the Government Entity for different confidential packages. My responsibilities are:

Roles and Responsibilities

CAPEX OPEX Financial model Transaction period PPT presentation for approval

Project risks assessment Probability and impact

Senior Quantity Surveyor (Moubarak Al Kabeer Port Project Phase 1) Kuwait

Mott MacDonald Ltd provided pre-contract PMC services to Ministry of Public Works, State of Kuwait for 2.7M TEU's brand-new state of art, fully automated port. My role is to manage the subconsultants to deliver the Tender documents for the entire port facilities which broken down into ten different packages. My responsibilities are:

Roles and Responsibilities

Review for accuracy and consistency Cost plans Tender documents BoQ including Pricing preambles PTE Subconsultants

Liaise with internal designers Share to external Subconsultants

Commercial and Contractual advice Eliminate ambiguities Subconsultants

Senior Quantity Surveyor (Auditing Services for State Audit Bureau) Qatar

Mott MacDonald Ltd provided auditing services for State Audit Bureau of Qatar for confidential projects. I am part of the Cost and Contract auditing team. My involvements are:

Roles and Responsibilities

Precontract documentation Executed Contract documents Findings for incorrect procedures Clear narrative of findings Report with substantiation Respond to Client’s and Subconsultant’s queries

Contracts Administrator/ Quantity Surveyor Hill International Qatar 2013 - 2019

Hill International provided project management consultant (PMC) services to Qatar Railway for the Doha Metro Phase 1 Green Line Underground project. The Green Line is 32 KM of twin bored tunnels and construction of six urban stations, two switchboxes, one crossover box, tunnel portal, and six tunnel ancillary structures plus 32 cross passages between the tunnels.

Roles and Responsibilities

Prequalification Subcontractors Lump Sum and Provisional Sum

Review accuracy eliminate scope gap or creep recommend to approve Tender Plans, ITT and Tender documents Provisional Sum Packages

Tender requirements commercial and Contractual Technical Evaluation team

Commercial tender evaluation Technically qualified bids Recommend the potential Subcontractor instruct to execute the Subcontract the Contractor

Commercial and Contractual advice Discipline managers

Brief measurement team Contractual background on variations

Claim assessment Claim management Contractual legitimacy Preliminary Report on Claims

Provisional Sum administration Payment events proposal Subcontract adherence

Annual cash flow forecast for MoEF

Payment event achievement assessment Liaise with the discipline managers

Monitor validity of Bonds and Insurances

Senior Quantity Surveyor Sobha Developers LLC Dubai 2013

Client representative for prominent projects: Mix use developments, Shobha Lifestyle city (290 Villas, 15 G+8 Office and residential buildings, two schools and associated infrastructure works) and MBR city Show village (6 Villas and associated Infrastructure works),

Roles and Responsibilities

PTE Detailed design Market rates

Design Update Comparison of previous Cost Plan Cost reconciliation report Elemental

Site visits progress of the work Show villas Assess IPA and issue IPC

Value Engineering workshops Cost comparisons

Consultant Quantity Surveyor Trafalgar Technical Services Limited Dubai 2006 – 2013

Trafalgar Technical Services Limited provided Cost consultancy services for both pre and post Contract stages for Dubai civil Aviation and other prominent Clients in Dubai

Pre – Contract - Palm trump tower international hotel Dubai International Airport Expansion (Phase II) Al Maktoum International Airport ( Passenger Terminal Building (PTB); Stormwater Drainage Network; Residential City; Employee and Free Zone Gates; Air Traffic Control Tower; Road Networks}

Roles and Responsibilities

Quantities take-off BoQ Preparation Civil, Mechanical, Electrical, and landscaping works POMI.

RFIs Missing Information Assumptions Review response.

Cost Plan Concept design.

Post – Contract - Al Maktoum International Airport ( Stormwater Drainage network; Peripheral Road network; 132/11kV DEWA substations & 132kV cabling works; RTUs & Fiber Optic cabling works; District cooling plants; Fire stations; Fuel staging building; Passenger Terminal Building (PTB); DLC Headquarters.

Roles and Responsibilities

Finalize the Contract documents

Contractual correspondences the Engineer - the Contractor.

Assess Contractor’s Variation submissions

Change Management procedure Order of Cost (OoC) Engineer Instruction Approval Request (EIAR)

Monthly Valuation meeting Contractor Engineer’s representatives Assess IPA Draft IPC

Negotiation Contractors Variations New rates.

Prepare Monthly Cost Report/Financial Report

Manage Re-measure Team



Contact this candidate