Resume of Tim Roads Page *
CERTIFICATIONS
SKILLS SUMMARY
• Plumbing
• Utilities
• Facilities Maintenance.
• Excavation
Mechanical:
Heat Exchanger Piping, Chill
Water Lines, HVAC
Commercial Piping, Plate Heat
Exchanger, Threaded
Sprinkler Pipe, Ductwork, Day
Tank & Tanker Heat Coil
Steam Lines, Dust Control
Systems,
TIM ROADS
• Concrete/Rebar
• RFI/RFQs
• Safety Orientations
• Electrical/Conduit
Electrical:
Conduit Placement,
Flexible and Rigid, Wire
Pulling, 3-Phase Motor
Wiring
8
5
9
-
3
• Progress Meetings
• Pile Driving
• Piping • Shoring/Lagging
• Sub-Contractor Interface
• Equipment Installs
• Infra-Structure
Fabrication:
Electrical Cabinets, Wood
Stoves, Sheet metal
skirting, Marine/barge
components, Shipping
container conversions,
Testing:
Size Particle, Sieve
Screen Analysis,
Asphalt Mixes,
Concrete, Soil
Proctors, ASTM
Heavy equipment re-builds Procedures,
Hi-lift truck body assembly Coal-Oil-Water
Vehicle/Trailer Mixtures
components .
• James D. Patton Vocational School Two Year Welding Certificate, Crestview Hills, KY
• Hobart School of Welding Comprehensive Blueprint Reading Course, Cincinnati, OH
• Certified 6G Pipe Schedule 40 QC Labs, Hollywood, FL
• Asphalt Testing Level One Flexible Pavements, Columbus OH
• CDL Haz-Mat Forklift Safety Training, Napier Truck Driver Training, West Chester, OH
• OSHA 40 HR Safety Certificate PBCS, Cincinnati OH
• CPR Training, Good Samaritan Hospital, Cincinnati, OH EDUCATION
Northern Kentucky University, Highland Heights, KY
• Technical Graphics • Communications • Music
• Metallurgy • Public Speaking (speech)
Morehead State University, Morehead, KY
• Mechanized Welding Systems (Classroom & in-plant education) James D. Patton Vocational School, Fort Mitchell, Kentucky Two Year Welding Program
• Blueprint Reading • Machining Skills • Sheet Metal • Oxy-Fuel Cutting
• Flux-Core • GMAW • GTAW • SMAW
Resume of Tim Roads Page 2
Vocational Co-op Experience:
R.C. Durr Farms, Richwood, KY & R.C. Durr Construction, Walton, KY
• Stick and arc welding (semi-automatic) of Caterpillar parts including, rebuilds of idlers, track-pads
• Welding custom component parts for equine equipment and farm implements.
• Assist mechanics in engine rebuilds
Metal Craft Inc., Florence, KY
2
nd
year co-op opportunity
• Welding/assembly of Omega wood-stove blower inserts, tire-changers and aluminum lighting fixtures. EMPLOYMENT
Truck Driver
Highway and Skyways, Hebron, Kentucky Feb 2021-Present
• Pick-up and Delivery of Domestic and International Freight.
• Straight truck and tractor trailer.
• Warehouse duties include: stocking and retrieval on manufacturing parts for aerospace manufacturing and chemical dry ingredients.
Thaman Rubber, Cincinnati, Ohio August/2014-February/2021 Inside Sales/Truck Driver
• Produce quotes and recommend products to customers
• Explanation of technical capabilities of engineered products
• Assist customers and outside sales reps with orders and request
• Expedite orders using LTL or delivery by commercial truck
• Purchasing product for stock and special orders
Scott Gross Companies, Cincinnati, Ohio May/2013-May/2014 Inside Sales
• Sales of Miller, ESAB, Lincoln and Hobart equipment and spare parts
• Inventory and pricing of consumables and hard goods.
• Pre-route management of industrial, food-grade and medical gases.
• Fielding incoming phone calls for orders.
• Assisting outside salespeople in lead generation and appointments Metro Lift Propane, Walton, Kentucky, USA Jan/2007- Oct/2012 Route Sales/Truck Driver
• Pre-Route planning/Lead Driver
• On-site billing and invoicing using handhelds.
• New customer setup/orientation.
• Safety Training- CTEP
• Completion of Haz-Mat certification
• Training of new drivers and support personnel.
• Servicing beverage, industrial/manufacturing and printing packaging industries Resume of Tim Roads Page 3
Foster Wheeler Zack, Clinton, New Jersey, USA Oct/2005 - Feb/2006 Contract Welding Inspector
• Inspection and re-build of Babcock-Wilcox coal-fired boiler.
• Implemented sketches/drawings for proper weld reporting
• Procurement Assistance
• Inspection of plant air, soot-blower, gas-supply, water, chemicals, chemical lines, 1-18” diameter thin wall to heavy wall, steam piping.
• Coordinated subcontractors for x-ray and post-weld heat treat activities.
• Maintained input and progressive documentation of hours, logistics and technical data.
• Practical knowledge of AWS specifications. Pro-active inspection of outer encasement of boiler and economizer tubing, buck stays, wind-ties and recirculation gas/flue duct inspections internal/external and final walk down for release of insulation installment.
• Worked cooperatively with project management/engineering for punch list activities and for turnover.
• Documentation and monitored boroscope, nondestructive NDE hydro-testing of boiler wall tubes, header & supply tubes inside wind boxes.
• Progress tracking & VT inspection of welds for release of x-ray testing, follow-up of re-works activity.
• Engineering walk-downs with owner representatives. Rumpke Recycling, Cincinnati, Ohio, USA Aug/2003 – April/2005 Corporate Maintenance Division, Welding, Millwright, Civil
• Assisted in the tear-out of HRB bailer floor and rebuild of heavy wall floor for extended production life.
• Design-build, plant lay-out, fabrication of glass pulverization plant in Dayton, Ohio utilizing new/used equipment to keep construction cost in-line to start-up/production.
• New Plant construction plant lay-out, design-build of MRF (Material Recycling facility) in Louisville, Kentucky.
• Retrofit production lines to maximize production by implementing the fabrication of support structure-conveyor lines, rubber belt, steel belt, pneumatic Eddy Current magnet systems, storage bins & weather wind containment of garbage-small debris control.
• Procurement of used equipment and pre-fabricated structures
• Concrete work for pier column installs for silo support
• Fabrication of pre-engineered concrete push walls and installation work – Cincinnati MRF (Material Recycling Facility).
• Extensive experience in start-up, testing and flow adjustment of material flow to processing equipment.
Fluor Constructors International Inc., Greenville, South Carolina, USA Nov/2001 – Mar/2003 Senior Site Quality Inspector
• Projects: PSEG Energy Facility Lawrenceburg, IN, Chevron Clean Fuels Project, Pascagoula, MS.
• Civil & Mechanical inspection of commercial concrete structures for General Electric steam & gas turbines.
• Anchor bolt placement, pile caps, auger-cast pile inspection.
• Work authorization upon completion utilizing sign-off evaluation documents.
• Prepared reports of daily activities and critical issues that arose.
• Vendor audits and site inspection of pipe pre-fab components. Resume of Tim Roads Page 4
• Administered surveillance & nonconformance reports with pictures for damage repairs. Parsons Brinkerhoff (PB OHIO) Construction Services April/1999 – April/2001 Cincinnati, OH, New York, NY, USA (HR Contact) Senior Level Inspector/Quality Assurance Representative
• Fort Washington Way, I-71/75 reconfiguration program.
• Performed inspection and oversaw numerous contracts.
• Oversaw the installation of vandal screens, light fixtures, architectural bridge/steelwork on main trench and platform bridges over FWW.
• Resolved plan error issues in field by notifying the client, resident engineers and architects, if needed.
• Heavily involved with road and utility relocation at Artimus Traffic Control Center.
• Oversaw pump-house including concrete wall construction, piping, layout, electrical, lighting and overall test phases to ensure proper operation.
• Worked with as-built drawings and schedule claims as it pertained to wall construction, bridge, and overall progress throughout project within the three year construction time line.
• Monitored demolition activities of pre-existing bridges and structures.
• Monitored careful excavation of fiber optic and telephone lines for relocation of the Artimus Traffic Center in downtown Cincinnati.
• Monitored pile driving of auger- cast, H-Pile and concrete encased tube piles for bridge applications. Coaliquid Inc. McDonell Douglas Energy Systems Dec/1982 – Feb/1987 St. Louis, MO & Louisville, KY, USA Welder/QC Plant Technician/Field Technician
• Served as QA Manager for over five years starting in Shelbyville, KY with pre-engineered fabrications for pilot plant construction for Mulberry Florida.
• Upon completion and start-up, challenges include retrofit tanks, piping and pumps to successfully burn coal oil water mixture (COWM) in dryer kilns to process phosphate fertilizer.
• Close monitoring and documentation of in-house boiler temperatures to gun
• Reported how test burn performed and the capacity of saving client fuel costs vs. using bunker c oil.
• Additional duties included maintenance of plant processing equipment where coal pulverization and size classification equipment were used.
• Assumed overall responsibilities over the QA Lab (Florida plant) and conducted research and feasibility studies experimenting with coal sludge water, cooking fat coal-water slurry with stabilization additives.
• Tested raw materials before process, coal, #6 oil, water and tested load shipments utilizing wet bench chemistry (ASTM methods).
• Extensive travel was involved throughout the five year term for construction, test-burn set-ups and troubleshooting activities.
• Hands-on help in wiring three phase motors and transformers.
• Welded in-line steam heat transfer systems leading to Forney combustion guns to atomize fuel properly.