Muluken Getachew
Date of birth: **/**/**** Nationality: Ethiopian Phone number:
+251-********* (Mobile) Email address: ******************@*****.*** Address: Megenagna, Addis Ababa, Ethiopia (Work)
I have been educated in Construction Engineering and Management and have worked in various professional fields. Apart from teaching at university, I believe that serving in the construction industry has given me a better knowledge. I would like to express that I am ready to apply this developed knowledge to any organization that invites me. Thank you!
26/07/2023 – 01/08/2024 Addis Abab, Ethiopia
PROJECT COORDINATOR TIBEB DESIGN AND BUILD
Address Megenagna, Addis Abab, Ethiopia
08/09/2015 – 13/10/2016 Mizan-Tepi, Ethiopia
ASSISTANT LECTURER IN UNIVERSITY MIZAN-TEPI UNIVERSITY 06/03/2019 – CURRENT Mizan-Tepi, Ethiopia
UNIVERSITY ENGINEERING LECTURER MIZAN-TEPI UNIVERSITY 02/08/2024 – CURRENT Addis Ababa, Ethiopia
OFFICE ENGINEERING HEAD TIBEB DESIGN AND BUILD PLC 29/10/2010 Dire Dawa, Ethiopia
BSC DEGREE IN CONSTRUCTION TECHNOLOGY AND MANAGEMENT Dire Dawa University Website https://www.ddu.edu.et/
14/10/2016 – 05/03/2019 Jimma, Ethiopia
MSC IN CONSTRUCTION ENGINEERING AND MANAGEMENT Jimma University Website https://ju.edu.et/ Level in EQF EQF level 8 11/10/2019 – 09/04/2020 Mizan-Tepi, Ethiopia
HIGHER DIPLOMA PROGRAM Mizan-Tepi University
Website https://www.mtu.edu.et/
Mother tongue(s): KAFINOONOO AMHARIC
ABOUT ME
WORK EXPERIENCE
EDUCATION AND TRAINING
LANGUAGE SKILLS
Other language(s):
UNDERSTANDING SPEAKING WRITING
Listening Reading Spoken production Spoken interaction ENGLISH B1 C1 A1 A1 C1
Levels: A1 and A2: Basic user; B1 and B2: Independent user; C1 and C2: Proficient user Microsoft Excel Google Drive Microsoft Office ( Word, Excel and Power Point ) MICROSOFT PROJECT AutoCad 2D -3D Autodesk Archicad Primavera P6 (Resource Management) IBM Statistical package for Sciences (SPSS) 01/02/2018 – 03/03/2019
Properties of Self-Compacting Concrete with and Without Fly Ash Properties of Self-compacting Concrete is my Masters Thesis which basically commenced to replace the most expensive construction material with industrial wastes. The aim of the project is, to replace cement with pulverized fly ash to create self-compacting concrete. There are several admixtures which have been added for the better completion of the project. Super plasticizer and viscosity modifying agent werere the two basic admixtures which we have used in our analysis. Finally, the result showed we have gained a better fresh property at optimum replacement 10% of PFA.
26/07/2023 – 01/10/2023
Lemikura Subcity Renovation and Refubrishment Work I was assigned on this project as office engineer by Tibeb Design and Build PLC. The project does contains, wall cladding work, floor porcelain work, ceiling work, roofing work, data and network work, electrical work, camera and CCTV work, aluminum partition and Tempered partition work. The activities I was assigned for was, payment preparation, master schedule preparation, progress report, material request and labour output analysis. 02/10/2023 – 15/12/2023
Addis Ababa City Land Management Office Renovation and Refubrishment Work 1. Role: - Project Manager
2. Project Cost: - 278,699,290.19 ETB
3. Story of the Building: - G+6
4. Location: - Addis Ababa Megenaga Area round Lem-hotel 5. Client: - City Government of Addis Ababa Land Development and Administration Bureau 6. Status: - Completed
04/05/2024 – 02/08/2024
Addis Ababa Trade Office, Women's & Children's Office, Finance Bureau and Dining Center Bureau 1. Role: - Project Manager
2. Project Cost: - 86,540,290.19 ETB
3. Store of the Building: - B+G+9
4. Location: - Addis Ababa, Piasa around Wube bereha 5. Client: - City Government of Addis Ababa Addis Ababa Design and Construction Works Bureau 6. Status: - Completed
03/08/2024 – CURRENT
Addis Media Network Refurbishment and Renovation Works 1. Role: - Office Engineering Head
2. Project Cost: - 1,385,576,800.50 ETB
3. Store of the Building: - G+4, G+1, G+3 buildings and Landscape work 4. Location: - Addis Ababa, Mexico around Africa Union 5. Client: - City Government of Addis Ababa Addis Ababa Design and Construction Works Bureau 6. Status: - On Progress
DIGITAL SKILLS
PROJECTS