EDIC BAGHDASARIAN, SM PMI, IEEE
Cell: 1-647-***-****
******@*****.***
OBJECTIVE
To secure a contract or full-time position as a Project Control Manager/Supervisor, Senior Project Coordinator, Planner, Scheduler and Controller within an Engineering, Construction, Manufacturing or IT environment.
SUMMARY OF QUALIFICATIONS
Over 25 years of experience in design, development and implementation of Project Planning/Scheduling and control system, including CPM/PERT scheduling in P6, Resource allocation and leveling for RFP (Proposal) phase up to Test and commissioning/ delivery of various types of projects.
25 years of experience working with Primavera products including all versions and P6 v18.8
Over 25years of experience with Project controls, Earned Value management, Schedule QC, multi-level reporting, Schedule Cost, Risk and Quality management, Document control Systems (SharePoint, Aconex, etc.), Contracts, Procurement, etc.
Over 25 years of work in Power Energy (Nuclear Power plants, Substations, Transmission Lines), Transportation (Rail, Subway, LRT), Oil, Gas, Petrochemical, and IT Projects.
Working experience in multi-project environment complying with company, project, and Project Controls Department procedures and policies
Developed realistic baseline schedule (to control Scope, Time, Cost) and supported PM in Integrated Baseline Review, collected and analyzed data on project progress, production rates, etc. to improve efficiency and accuracy of future planning, Reviewed contract specifications, working to identify gaps in Project Plan, developed and implemented Risk Management Plan. Developing risk register and implementing it id P6 schedule and OPRA (Oracle Primavera Risk Analysis).
Created consolidated reports on project established metrics - Earned Value Analysis, Resource and cost Allocation Analysis, Supported PM with Project Management Plan, Risk Management Plan, Scope of Work, WBS Dictionary, Responsibility Assignment Matrix, etc.
Created and supported project controls systems (cost, schedule, progress, change management, etc.) for both the EPCM and Owner’s scope. Provided site staff with necessary field schedules
Strong technical skills in writing project coordination, planning and scheduling procedures, enhance the project controls system, ensuring they are used properly.
Effectively communicate at various levels with individuals and groups
Excellent analytical and communication skills verbally and in writing
Computer skills:
Scheduling and Project Management Software: Primavera (P6, Suretrack, Monte Carlo, Expedition, CM12), Tilos, MS Project (all versions), SAP, Graneda, Artemis (Mainframe and PC), ArtPlanning, Prestige, Projacs (IBM Mainframe), PertMaster (Scheduling and risk analysis), @RISK, Risk+, Cobra, OPRA (Oracle Primavera Risk Analysis), Primavera Unifier, Aconex. EcoSys, Power BI, Synchro.
General: MS Office, Excel, Access, Word, PowerPoint, FrontPage, Outlook, Visio, MS SharePoint, Lotus Note, Photoshop, Domain Experience
Honest, dependable, hard-working, flexible, team player, multi task, committed to high quality work
Senior Member of PMI and IEEE Computer Society, Valid Security Clearance (Nuclear).
WORK HISTORY
Project Planning/Scheduling and Control Manager (Since June 2020)
Barmore Project Management Consulting, Inc.
Barmore Consulting Inc. is a Project Management, control, scheduling services and software development company. Founded in 2002 in Toronto, Ontario, it provides services to a variety of heavy industry project (rail, subway, water-treatment, oil & gas, Infrastructure, MIS).
Metrolinx – Presto in Charge of Senior Scheduler role for 26 Project Schedules (For Province of Ontario) and working with 17 project managers. The projects are modernization of transportation systems (LRT, Underground and Overground Subways, construction of new roads/ Highways and installing mechanical and electronic devices, design and development of Computerized management system of province transportation, etc), New development and extension Projects for LAX, Construction Projects in California including Penner-SPHS, Crate & Barrel, and Lincoln HS, Performing the following tasks:
Design and development of Project scheduling and controls systems
Prepared Overall and Detailed time schedules
Weekly meetings with Project managers for Schedule Review and Update
Updating, resolving schedule issues, preparing over 5 types of weekly update reports for each Project Manager.
Progress calculation & evaluation, reporting to senior management
Controlled Time, Efficiency, Milestones, Documents
Project and Discipline Variance Analysis
Critical path analysis, Delays analysis and claims
EVM, Cost, Time, Quality and Risk management
Besides Project reporting, Preparation of overall Weekly and Monthly reports with all analytical aspects for managing directors board and senior directors and department manager.
Participating in kick-off meetings for new projects with internal co-workers, consultants and clients.
Project Planning/Scheduling and Control Manager (May 2017- May 31, 2020)
Graham Construction, Infrastructure, Mississauga. RFP and Construction Projects, mainly Water treatment, transportation.
Project Management Consultation,
Design and development of Project scheduling and controls systems
PMI Knowledge areas implementation.
Prepared Overall and Detailed time schedules
Prepared OBS, WBS, CPM
Progress calculation & evaluation, reporting to senior management
Controlled Time, Efficiency, Milestones, Documents
Schedule Quality management
Project and Discipline Variance Analysis
Critical path analysis, Delays analysis and claims
EVM, Cost Time and Risk management
Hired/trained and Supervised planners/schedulers
Project scheduling and control training of planners, site coordinators, PMs.
Prepared Project Controls procedures (PM, PC strategy, Planning and Scheduling, Earned Value, Change management, Risk management, Cost and performance, P6 operational Guides, etc.).
Prepared Quarterly, Monthly and Weekly Project Progress Status Reports
Senior Planner/Scheduler, Project Controls Manager (Mar. 2016- April 2017)
Dragados Canada, Ottawa Light Rail Transit Program:
Project Management Consultation,
Design and development of Project scheduling and controls systems
PMI Knowledge areas implementation.
Prepared Overall and Detailed time schedules
Prepared OBS, WBS, CPM (PDM, ADM)
Progress calculation & evaluation
Earned Value Management (EVM)
Controlled Time, Efficiency, Milestones, Documents
Project and Discipline Variance Analysis
Critical path analysis
Schedule Cost, Risk and Quality management
Prepared Quarterly, Monthly and Weekly Project Progress Status Reports
Senior Project Controls Engineer Doha, Qatar
EGIS Rail, Doha, Qatar, Gold Line Subway, as a part of PMC JV. (Jan 2015- Dec 2015)
Setup detailed schedule using P6 and MS Project
Design and development of Project scheduling and controls Procedure
Design and development of Reporting Procedure
Design daily reporting system in SharePoint (for Stations and Tunneling)
Review and Comment Contractor’s Weekly and Monthly Reports.
Progress calculation based on PMC RE daily reports
Checking Ring production daily reports and reporting to Client and PMO
Checking TBM daily reports and preparing overall report on daily basis, reporting to Client/PMO.
Leading/supervising Reporting team to gather data from PMC departments and prepare PMC Daily, Weekly and Monthly Reports, Prime Minister Report, Project Director’s Report, Weekly Excavation Report, Risk Register, OPRA
Implementation of PMO requested formats.
Working on Project Controls standards and procedures.
Performance management (Weekly and Monthly)
EVM, Cost and Resource management. Critical Path analysis.
Schedule Risk and Quality management
Preparing special reports and presentations on demand.
Coordination meetings with Client, Contractor an PMC internal departments. Regular Site visits.
Lead Planner/Senior Planner/Scheduler Toronto, Ontario Mar 2014- Nov 2014
SNC-Lavalin- Projects: Proposals (RFP) for East Rail Maintenance Facilities, 407 Highway, and others:
Setup detailed schedule for RFPs using Primavera P6 and MS Project.
Design and development of Project scheduling and controls systems
PMI Knowledge areas implementation.
Schedule Quality and Time management
Earned Value Management (EVM)
Project Cost, EVM and Risk Management (Risk register, Risk activities in P6 and OPRA)
Performance management
Project management Procedures
Project Controls Manager/Senior Master Scheduler Toronto, Ontario
Senior Project Scheduler/planner/Senior Project Controls Specialist (Aug.2009-Feb.2014)
Stantec, assigned to TTC for Toronto-York Spadina Subway Extension EPC Project (TYSSE) in the capacity of three roles mentioned above and later Canada Post Program, Alyeska Pipe stations, and scheduling for RFP projects:
Designed and Developed Project Planning & Controls Systems plan and implement it
Prepared Overall and Detailed time schedules using Primavera P6 and MS Project
Prepared OBS, WBS, CPM (PDM)
Schedule update, Baseline, Physical Progress calculation & evaluation, Review Contractors Progress Reports, determine Contractor performance compliance with approved baseline.
Responsible for the development, analysis and maintenance of the resource loaded detailed Master Schedule. Collection, verification and integration of Contractor’s work scope activities into the Overall Master Schedule. Risk Register, Running Risk using PertMaster.
Controlled Time, Efficiency, Milestones, Documents
Manage the schedule change order process to track approved schedule changes.
Project and Discipline Variance Analysis, Risk Management, Schedule Claim Analysis
Developed and monitor short term schedules (weekly or 2-week look ahead) for critical activities.
Head of Critical path meetings held per month
Earned Value Management (EVM)
Schedule Cost, Risk and Quality management
Supervise project control team ( Scheduling, Cost control, Performance analysis, Document Control)
Prepared Quarterly, Monthly and Weekly Project Progress Status Reports
Prepared procedures for Project Coordination, Scheduling, Progress Control, WBS, Cost Control, Procurement, Reporting and Variance Analysis
Managed Project Systems including Primavera Project Planner P6, Primavera Contract Manager (CM12), Tilos, MS SharePoint (Web-base Document Management), eTimeMachine, etc.
Supervisor/Senior Project Scheduler/planner (March.2007-Aug.2009)
Atomic Energy of Canada, ACR-1000 EPC Project, OPG Shutdown Schedule
Developed Project Planning & Control (PPC) System Improvement plan, and implement it using P6 and MS Project.
Prepared Overall and Detailed time schedules
Prepared OBS, WBS, CPM (PDM, ADM)
Physical Progress calculation & evaluation
Controlled Time, Efficiency, Milestones, Documents
Project and Discipline Variance Analysis, Risk Management
Head of Critical path meetings held per month
Head of Project Improvement weekly meetings
Earned Value Management (EVM)
Schedule Cost, Resource, Risk and Quality management
Supervise project control team
Prepared Quarterly, Monthly and Weekly Project Progress Status Reports
Prepared procedures for Project Coordination, Scheduling, Progress Control, WBS, Cost Control, Procurement, Reporting and Variance Analysis, Controlling Risk items in P6 Schedule.
Master/Senior Project Scheduler/planner Toronto, Ontario (March.2005-March.2007)
Thales Rail Signaling Solutions, (Formerly Alcatel, Transport Automation Solution Division), Toronto, Canada
Projects: RATP of Paris, Canarsie (New York City), MUNI (San Francisco), JNUP (London-GB) and proposal for new projects (RFP)
Prepared Overall and Detailed time schedules using Primavera P4 and MS Project, SAP
Prepared OBS, WBS, CPM (PDM, ADM)
Physical and financial Progress calculation & evaluation
Controlled Time, Efficiency, Resources, Milestones, Documents, Procurement, Communication.
Project and Discipline Variance Analysis, Risk Management
Prepared Quarterly, Monthly and Weekly Project Progress Status Reports
Prepared procedures for Project Coordination, Scheduling, Progress Control, WBS, Cost Control, Procurement, Reporting and Variance Analysis
Earned Value Management (EVM)
Schedule Cost, Resource, Risk and Quality management
Barmore PM Consulting Inc. Head of Planning Department (May 1999 – Feb 2005 )
Consulting at Enerchimi Engineering Co. in cooperation with Technip (France), Tecnicasreunidas (Spain)
Projects: Abadan Refinery, LAB, LLDPE Unit in AK and Fajr Petrochemical Companies, Tabriz and Khuzestan Petrochemical Complexes, Khangiran gas project, Karoon perochemical projects, Transmission Lines, Some substations, Shiraz Power Plant .
Studied present project management situation
Developed Project Planning & Control (PPC) System
Prepared Overall and Detailed time schedules for RFP and contracted projects.
Prepared PBS, OBS, WBS, CPM (PDM, ADM)
Physical and financial Progress calculation & evaluation
Schedule Cost, EVM, Risk and Quality management
Earned Value Management (EVM)
Controlled Time, Efficiency, Resources, Milestones, Documents, Procurement, Communication.
Project and Discipline Variance Analysis, Risk Management, Schedule Claim Analysis
Prepared Quarterly, Monthly and Weekly Project Progress Status Reports
Prepared procedures for Project Coordination, Scheduling, Progress Control, WBS, Cost Control, Procurement, Reporting and Variance Analysis
Recruited, supervised, and overseen the professional development of staff
EDUCATION AND TRAINING
MSc & BSc Planning, including Operational Research, Computer Science (National University of IRI), Systems Engineering (Ottawa U, 2003 not completed due to relocation).
BSc Planning Industrial Engineering (Planning), evaluated by University of Toronto 2007
BSc Computer Programming, evaluated by WES (World Educational Services), Toronto,2003
DIPLOMA in PROJACS (IBM Scheduling for Mainframe),
Artemis: Project Management Database Management System, Snamprogeti, Italy,1989
Project Planning and Control, Management Information Systems: JGC Japan- 1989
Project Planning and Control, Construction Management- TPL-Italy- 1989-1990
Project Management Professional (PMP) Training, IIL, Toronto-Feb.-April 2006
Delivering on Customer Commitment-AECL- Mississauga-2008/02/25
Supervision-Introduction- Mississauga- -AECL- Mississauga December 2007
Supervision- Level 2 (advanced)- Mississauga-February 2008
Managing Today’s Projects – Mississauga-SPM-June 2008
Couching and mentoring – Mississauga-AECL- 2007/09/05
Cobra – Mississauga-AECL- 2007/07/10
MS Access-Advanced – Mississauga-AECL- 2007/06/25
Project Cost Control – Mississauga-SPM-August 2008
Managing Project Risk – Mississauga- SPM-August 2008
Covey’s 7 habits for effectiveness– Mississauga
Team Effectiveness– Mississauga
General and Safety- AECL-2007/05/02
Emergency Preparedness-AECL-2007/05/02
Radiation Protection-G4- AECL-2007/05/02
TRAK - Introduction to AECLs Documentation System- AECL-2007/05/23
TRAK Documentation Workflow- AECL-2007/05/23
QA Orientation and Awareness for New NBC Staff -AECL-2007/05/01
Managing Documents in Primavera Contract Manager 12- SAR Toronto-October 2009
Ethics and Code of Conduct-Stantec-November-2010
Health and Safety Training (One full day with British Certificate), 2015
Personal Protective Equipment Training, Dragados Canada, 2016-2017
Integrated Accessibility Standards Information/ Dragados Canada, 2016-2017
Communication and Employment Standards Training. Dragados Canada, 2016-2017
Internal Responsibility System Training, Dragados Canada, 2016-2017
Occupational Health and Safety Awareness Training for Workers in Ontario, Dragados Canada, 2016-2017
AODA Customer Service Training (Condensed content), Dragados Canada, 2016-2017
Workplace Violence and Harassment Employee Training (Ontario Bill 168), Dragados Canada, 2016-2017
WHMIS 2015 including the GHS for Workers and Supervisors All Jurisdictions, Dragados Canada, 2016-2017
Understanding Human Rights Training (AODA Edition), Dragados Canada, 2016-2017
Fire Safety Training, Dragados Canada, 2016-2017
Code of Business Ethics and Conduct E-training, Graham Construction, 2019
Code of Business Ethics and Conduct, Graham Construction, 2019
Leadership transition, Graham Construction, 2019
Respect in the workplace, Graham Construction, 2019