JORGE CESAR RODRIGUEZ RAMIREZ
Mobile: +1-334-***-**** (USA), +52-81-137*-**** (Mexico) E-mail: ********@*****.***, *********@*******.*** Kansas City, Missouri. USA.
Work experience:
TN VISA
Work experience:
Magna (05/2023-01/2025) Automotive Industry
Responsibilities (Controls and Robotics Engineer)
• PLC Programming and Troubleshooting.
• Allan Bradley and Siemens PLC’s.
• Electrical, Electronics, Mechanical, Pneumatics and Hydraulics Troubleshooting.
• Maintenance Technician Support.
• Robots. Programming and Troubleshooting.
• Die Casting.
• Welding.
• Instrumentation.
• Hands-On Position.
• Electrical and Electronics troubleshooting.
• Continuous improvement Projects.
• Reduce Down Time.
• Ecoat Treatment.
• Vision System.
• Finish Good Assembly Lines.
• Electro-Hydraulics, Mechanical, Electro-Pneumatics, Electrical and Electronics Systems. Nemak (12/2022 - 04 /2023) Automotive Industry (Die Casting and Finish Good) (Alabama) Responsibilities (Controls Engineer)
• PLC Programming and Troubleshooting.
• Die Casting Equipment.
• Laser Cutting Cell.
• Allan Bradley and Siemens PLC’s.
• Maintenance Technician Support.
• Robots.
• Hands-On Position.
• Electrical and Electronics troubleshooting.
• Electro-Hydraulics, Mechanical, Electro-Pneumatics, Electrical and Electronics Systems. Hwasaung Automotive Alabama– (02/2021.- 12/2023) Automotive Company. (Enterprise, Alabama. USA). Responsibilities: (Process Engineer)
• Control Process (Flow Charts, Work Instructions, Process Control Parameters, Operator Training, etc.).
• Maintenance PLC programing and troubleshooting equipment, electrical, electronics, pneumatics and mechanics.
• Technical Support for Maintenance Technicians.
• Hands On position.
• Hydraulics, Mechanical, Pneumatics, Electrical and Electronics Systems. Aceros y Laminados Leal Operartions Manager – (01/2020 – 05/202) Steel Company. (Juarez, Chihuahua). Responsibilities: (Operations Manager)
• Siemens PLC programming and troubleshooting.
• Production Plan.
• Maintenance and Facilities.
• Security
• Electrical Installations.
• Mechanical, Electrical and Electronic Troubleshooting.
• Hands On.
• HR.
• Spare Parts.
• Hydraulics, Mechanical, Pneumatics, Electrical and Electronics Systems. Consultant Free Lance – (05/2019 – 01/2020 )
• Allen Bradley PLC programming and troubleshooting. (Studio 5000, RSLogix 500).
• Siemes PLC programming and troubleshooting. (Tia Portal and Simatic Manager).
• Electrical Installations.
• Electrical and Electronic Troubleshooting.
• Hands On.
• Launching Steel Plant (Guadalajara).
• Hydraulics, Mechanical, Pneumatics, Electrical and Electronics Systems.
• Hydraulics, Mechanical, Pneumatics, Electrical and Electronics Systems. Huntington Project Automation Manager – (01/2019—05/2019) (Monterrey, NL) Responsibilities: (Project Automation Manager)
• Corporative Support.
• Allen Bradley PLC programming and trouble shooting.
• Siemens PLC programming and troubleshooting. (Tia Portal Simatic Manager).
• HMI’s.
• Scada software. (Ignition)
• Electrical Installations.
• Electrical and Electronic Trouble shooting.
• Hands On.
• Budget Control.
• Hydraulic, Mechanics, Electrical and Electronics Systems. Consultant Free Lance – (11/2017 –01/2019)
• Allen Bradley PLC programming and trouble shooting.
• Electrical Installations.
• Electrical and Electronic Trouble shooting.
• Hands On
• Hydraulics, Mechanical, Pneumatics, Electrical and Electronics Systems. ATC Automation ATC Automation specializes in assembly and test systems for a variety of industries.
(Cookville, Tennesse). (05/2015 – 06/2017)
Position: Field Service Engineer
Reporting directly to: Service Team Leader Responsibilities:
• Assembly Production Lines Installations.
• PLC programming. (Siemens, Allen Bradley, Omron, etc).
• Training.
• Equipment upgrades.
• Guaranties.
• Robot drives and servo Programming.
• Troubleshooting.
• Technical Support.
• Hands On
• Hydraulics, Mechanical, Pneumatics, Electrical and Electronics Systems. Main achievements:
• Launch Assembly lines
Luvata Ramos – ElectroFin® E-Coat treatment corrosion durability protection for fin and tube heat exchangers. (Ramos Arizpe, Coahuila).
Position: Facilities and Maintenance Manager (02/2013 – 05/2015). Reporting directly to: Plant Mgr,
Plant Manager Responsibilities:
• Start Up Plant.
• PM program Launch.
• Spare Parts Requisitions.
• Fire System Test, Log, and Records.
• Fire Extinguishers and Fire System Log and Records.
• Emergency Electric Generator Logs and Test.
• Air Compressors Records.
• Security Cameras.
• Weekly Safety Audits.
• Recycle and 5’s Programs
• Safety and security Risk detection.
• Budget Control.
• KPI s.
• Process Audits.
• Customer complaints.
• Operators and Technicians training.
• Contractors supervisión.
• Data collections for Predictive maintenance implementation.
• PM program for production equipment and facilities Equipment (Chillers, compressors a/c, main electric transformer, etc.)..
• Customer Audits.
• Hands On.
• TPM.
Main achievements:
• Plant Launch
• Customer Audits Pass successfully.
• Develop PM Software
• Change of the Technology for Process Control.
Halliburton – (08/2012 – 02/2013) – Providers of products and Services to the Oil energy industry. (Villahermosa, Tabasco). Position: Property Manager
Facilities Maintenance:
• La Choca Headquarters Offices, Five Level Building, Two Elevators, and Four Level Parking Lot.
• Gregorio Mendez Latin American Training Center.
• File Warehouse.
• Launch Fire System.
• Zero Accident and Incidents for Employees and Contractors.
• Accomplish all the Global Risk Requirements.
• Budget Control.
• Building Expansions.
• Dairy Safety Meeting for contractors and employees.
• Keep Fire System Records.
• Monthly Safety Audits.
• Monthly Safety Revisions.
• In charge of Security Contractors. (Guards).
Main achievements:
• Rig Pass Certification
• Complete all Legal Documentation For the main Building and two Services Locations.
• Finish and Launch the File Building.
• Implement Recycle and 5’s Programs.
• Maintenance cost reduction (15%).
• Implementation Facility Risk, Fire, electrical, and Security. Magna Power Train – Automotive Industry. (Apodaca, Nuevo Leon). (12/2002-07/2012). Position: Automation Coordinator
Reporting directly to: Maintenance Manager Responsibilities:
• Trouble shouting Servo Motors and Drives.
• TPM.
• KPI s.
• Data Collection and Analysis for Predictive Maintenance.
• Hands-on and administrator engineer.
• Kaizen Workshop for Line Process Improvement.
• Preventive Maintenance to Peripheral Equipment (Chillers, Hydraulics Pumps, Air Dryers, etc).
• 5’s.
• Troubleshooting Test Equipment. (SIEMENS and OMRON)
• Assembly Line for Oil Pump (PLC Omron, line installation, Debugging, Leak Test Equipment and Troubleshooting).
• Upgrade Test Equipment.
• Lean Manufacturing.
• ISO 9000.
• TS 16949.
• Plastic Injection.
• Process and Quality Auditor.
• PFMA.
• Programming PM’s for Technicians.
• Data collection and analysis for predictive
• Maintenance Implementation.
• Programming and troubleshooting Siemens & Allen Bradley PLC s (Profibus, Ethernet and DeviceNet).
• Troubleshooting CNC Equipment.
• Instrumentation: Pressure transducer, LVDT,s, Flow transducer, LVDT transducers, etc.
• Programming and trouble shouting ABB Robots.
• Hydraulics, Pneumatic and Mechanical Equipment PM.
• Preventive Maintenance to Peripheral Equipment (Chillers, Hydraulics Pumps, Air Dryers, etc)
• Programming and troubleshooting HMI s (Panel view, Ethernet).
• Manufacturing Improvement ( Process and Equipment) Siemens Automotive – World Class Automotive Industry manufacturing automotive sensor and valves for emission controls for Ford, Chrysler, GM, Honda, Nissan and V.W. (Juarez, Chihuahua). (01/1994-06/2002). Position: Maintenance Manager
Reporting directly to: Operations Director
Responsibilities:
• Tool Room and Tool Crib. (Spare Parts).
• Support Equipment Maintenance (Air Compressor, Vacuum Pump, A/C, Lighting, Chiller, etc.).
• Facilities and Equipment Maintenance.
• Lead Transfer of assembly lines from Canada to Juarez
• Coordinate Layout changes.
• PM Program Implementation.
• Construction.
• Reduce Down Time.
• Siemens and Direct PLC Programming.
• KPI’s
• FPY.
Main achievements:
• Reduced investment in spare parts for $60,000.00 usd
• Managed warehouse expansion 800 m2 of construction.
• Automatic Dust Control (Link with Weather Station).
• Alarm system for emergency doors implementation.
• Automatic Fire Alarm System for production and warehouse implementation.
• Automatic Light Control for Production Areas implementation, annual savings of $19,000 USD.
• Design New Equipment getting annual savings for $50,000 USD.
• Reduced the Down Time from 6 hour to 20 minutes at day.
• Implement a Data Collection System for Productions Lines. Monitoring System of 17 automatic/semiautomatic stations getting scrap, downtime, production rates, and FPY.
• TPM implementation.
Academic history
UANL (Universidad Autonoma de Nuevo Leon, Mx
• ICC (Cumputer and Control Eng).
• IEC (Communications and Electronics Eng),