Results-driven mechanical project management professional with over 32 years of extensive experience in the Oil and Gas, Petroleum, Petrochemical, Power Plant, and Refinery industries. Proven expertise in construction and site coordination with top-tier firms both in India and internationally. Skilled in project estimation, planning, and finalizing technical and functional specifications, coupled with a strong focus on quality management. A strategic planner and implementer with a track record of successfully managing resources to meet project specifications and deliver optimal results.Strong background in fabrication and management of Brownfield and Greenfield construction
PROFESSIONAL SUMMARY
With over 5+ years as a Construction Manager, 9+ years as a Mechanical Project Engineer, and 11+ years in the construction sector, I specialize in pipelines, piping, and maintenance. I have 2+ years as a Mechanical Construction Superintendent and Pipeline Engineer, alongside 3 years in QA/QC and 2+ years in supervisory roles.
Oversee all construction activities related to Process, Utilities, and CO-2 compression, ensuring seamless coordination with Commissioning and Completion Teams.
Experienced in ISO 9001:2015, ISO 14001:2015, and ISO 45001:2018 standards, I excel in project management, planning, and team leadership to meet corporate goals.
Deliver quality projects on time, knowledgeable in ANSI, ASME, AWS, API, ASTM standards, and international HSE norms. My construction expertise spans Pipelines (API 1104), Piping (ASME B31.3), Storage Tanks (API 650, API 620, API 653), and Structural (AWS D1.1) within the Oil & Gas industry.
Proficient in onshore oil and gas pipeline design, construction, engineering principles, regulatory codes, inspection, and integrity management.
Experienced in construction management for oil and gas pipeline projects.
Field supervision experience in engineering and construction, particularly with tank installations, site readiness, and relevant industry codes.
Skilled in tank erection methods, pressure testing, and compliance with LNG design standards.
Hands-on experience with mechanical static and rotating equipment in Central Production Facility infrastructure maintenance.
Supports shutdown preparations and oversees maintenance activities for long-term equipment reliability in oil and gas sectors.
Conducts site surveys and designs for commercial and industrial pipeline systems.
Managed EPC-3 contractor teams and worked on PMC projects.
Oversaw large-scale projects with an emphasis on safety, quality, and efficiency.
Knowledgeable in general arrangement drawings, plant layouts, P&IDs, and structural drawings.
Provides technical leadership for preventative maintenance programs for mechanical equipment.
Involved in design and engineering processes, including procurement and commissioning of facilities.
Offers troubleshooting support for mechanical equipment failures using efficient problem-solving techniques.
Familiar with QA/QC standards and experience in developing quality management systems for projects.
Manages mechanical, piping, pipeline, tank, and structural modifications.
WORK HISTORY
Construction Manager, Danem Engineering Work WLL Jan’25-Present
Client : Ras Laffan Olefins Company Limited (RLOC) Qatarenergy, Al Messaied, Qatar
Project : Construction and Installation works for Ethylene Pipeline Intelligent Pigging
Details : Oversaw fabrication, erection, welding, and hydrostatic testing of Ethylene pipelines and piping, along with pre-commissioning, commissioning, and handover to the process department.
Managed day-to-day construction activities and oversaw project execution.
Reviewing UG/AG Installation construction documentation, including the implementation of Detail Design Material Take-Off (MTO) and contributing to necessary updates.
Managing construction activities at Qatar Ethylene Pipeline, overseeing up to 300 workers during peak mobilization.
Ensuring all construction activities comply with project specifications, IFC guidelines, and national HSE standards, while fostering a zero-accident safety culture.
Delivering UG/AG Installation facilities on schedule and within budget, while integrating National Content requirements.
Developed, supervised, and implemented the Project Execution Plan (PEP), documenting lessons learned throughout the project's lifecycle.
Ensured HSE and Quality Plan compliance through audits, inspections, and by implementing safety programs with contractor teams to promote a strong safety culture.
Acted as the construction representative for client coordination, planning, and organizing for cost-effective, timely project completion.
Monitored project progress and reported details, risks, and opportunities to the Project Manager/Sr. Construction Manager.
Documented all changes to specifications and deliverable requirements for the team.
Reviewed forecasts for man-hours, durations, and resource needs.
Prioritized project activities, managed subcontractor performance, ensured optimal working conditions, and conducted audits to meet performance goals.
Coordinated with management and third parties to meet project requirements and schedules.
Submitted timely project status, manpower, HSE, and incident reports while collaborating with support functions for resource optimization.
Planned and executed Mechanical and Systems Completion activities while maintaining professional interactions with external organizations and ensuring accurate reporting in compliance with Client Project requirements.
Resident Construction Manager, Aarkay Erectors Pvt Ltd May’24-Dec’24
Client : Rashtriya Chemical Fertilizer LTDCF, EPC Contractor- Thyssenkrupp Industrial Solution India Pvt. Ltd, PMC-PDIL
Project : 10,000 MT Ammonia Storage Tank Terminal, Alibag, Thal, Maharashtra, India
Details : Managed the fabrication, erection, welding, and hydrostatic testing of a double-walled ammonia storage tank (36.6m dia x 17.856m height), along with associated piping, structural work, painting, and firefighting systems.
Oversaw pre-commissioning, commissioning, and the handover of mechanical equipment installation to the process department.
Managed daily construction operations and ensured project objectives are met.
Developed and implemented the Project Execution Plan (PEP), documenting Lessons Learned throughout the project lifecycle.
Enforced HSE and Quality standards through audits, inspections, and controls.
Acted as the company's construction representative for client interactions, optimizing plans for timely, cost-effective project completion.
Monitored project progress, risks, and opportunities, reporting to the Project Manager/Sr. Construction Manager.
Documented specification changes and delineated team roles and deliverables for scope and schedule.
Reviewed construction forecasts and prioritized work activities to align with the project schedule.
Managed subcontractor performance and ensured optimal working conditions through regular audits.
Implemented HSE culture programs with contractor teams to ensure compliance.
Promoted safety standards and culture while coordinating with contractors to ensure project schedules and requirements were met.
Prepared and submitted timely reports, including project status, manpower, HSE inspections, and incident analyses.
Collaborated with support functions to optimize resource usage while safely planning and executing Mechanical and Systems Completion activities.
Maintained professionalism in all interactions and ensured accurate reporting against controls and KPIs to meet client requirements.
Project Engineer Mechanical, JNV VIRA Engineering Pvt Ltd Nov’21-Apr’24
Client : GAIL (INDIA) LTD, Propane Dehydrogenation (PDH) Polypropylene (PP)
Project : PMC Engineers India LTD, Alibag, Gail, Usar, Maharashtra, India
Provided comprehensive construction services across Mechanical, Civil, Electrical, and Instrumentation disciplines.
My expertise includes the fabrication, welding, and erection of process piping and pipeline systems.
Successfully constructed three treated water tanks, each with a diameter of 42 meters and a height of 20 meters, and performed civil work for tank foundations.
Oversee blasting and painting operations for storage tanks, as well as conducting hydrostatic testing for piping, pipelines, and tanks.
Managed the testing, pre-commissioning, commissioning, and handover processes to the operations department.
ISG Construction Field Mechanical Engineer (Piping, Pipeline & Static),In Salah Gas, Orion Management Consultants Dmcc,
(Joint Venture of British Petroleum, Sonatruch and Equinor – Oil & Gas), Algeria Jan’17-Sep’21
ProjectDetails:Led the Mechanical Team for the maintenance of Central Production Facility (CPF) infrastructure, focusing on static equipment such as pressure vessels, drums, heat exchangers, separators, tanks, process piping, valves, and associated systems in oil and gas projects.
Managed the construction and installation of flow lines from HMN Well Pads 6, 7, 8, and 14 to the CPF hookup point.
Oversaw the construction (fabrication, installation, testing, pre-commissioning, commissioning, and handover) of technical area piping from the hookup point to Christmas trees at well heads GMD (Goor Mohammed) 5, 8, 11, 13, 14, IS (In Salah) 8, 10, 11, 14, and HMN (Hassi Moman) 6, 7, 8, and 14.
Provided mechanical, electrical, and instrumentation construction services.
Executed the construction (fabrication, installation, testing, pre-commissioning, commissioning, and handover) of flow lines and gathering system pipelines from Well Pads KBA-17 to the CPF in Algeria.
Conducted construction activities (fabrication, installation, testing, pre-commissioning, commissioning, and handover) of technical area piping from the hookup point to the Christmas tree for Well Heads KBA-17.
Involved in flow lines and gathering system pipeline projects in In-Salah Gas projects (13% cr& DSS).
Constructed storage tanks and accommodations compound for gas processing projects.
Managed shutdown activities for the CPF in oil and gas projects in Algeria.
Performed hydrostatic testing of piping, pipelines, and tanks.
Led pre-commissioning, commissioning, and handover activities for piping, pipelines, vessels, drums, heat exchangers, separators, and tanks.
Provide mechanical pipeline and piping engineering services for projects, ensuring quality, cost, schedule, and HSE compliance.
Oversee preventative and corrective maintenance activities to ensure reliable operation of static and rotating equipment at the Central Production Facility.
Review and analyze engineering documents, such as drawings and PIDs, while evaluating existing facilities to recommend improvements that enhance production and cost efficiency.
Provide mechanical input for evaluations of design changes and modifications, including generation and review of PFDs and P&IDs.
Assist in shutdown preparation for mechanical maintenance while supporting the creation of specifications, datasheets, drawings, and technical evaluations for proposals.
Lead preventative maintenance program development for industrial mechanical equipment.
Contribute to design, engineering, procurement, and commissioning of facilities.
Mentor junior team members while assisting the inspection team with vessel, tank, and piping inspections, including corrosion analysis.
Assist in troubleshooting mechanical failures and conducting evaluations for efficient solutions and standard compliance.
Identify process and maintenance improvement opportunities and align with department objectives.
Ensure compliance with engineering practices and regulations while establishing an engineering database for integrated maintenance planning.
Review new facility documentation and develop maintenance plans.
Ensure compliance with contract requirements and approved procedures.
Oversee welding and NDT procedures while monitoring contractor quality practices.
Conduct QC inspections per QA documentation and provide feedback.
Manage onshore pipeline engineering activities, including calculations and specifications, within budget and schedule.
Project Engineer Mechanical,CTCO, Algeria (Oil & Gas Project) Nov’15-Dec’16
Clients : IN SALAH GAS - Joint Venture between British Petroleum, Sonatruch and Equinor
Oversaw the construction and installation of gathering system pipelines connecting well pads to the Central Processing Facility (CPF) as part of the KBA and TEG projects in Algeria.
Executed the construction of process piping and structural steel for the KBA CPF project in Algeria.
Conducted hydrostatic testing for piping and pipelines.
Managed pre-commissioning, commissioning, and handover processes for piping, pipelines, vessels, drums, heat exchangers, separators, and tanks.
QA/QC Engineer Mechanical,Weatherford Oil Tool Middle East Ltd (EPC) Dec’13-Oct’15
Clients : ENI, Projects- Hammar/ Rafidiya/ Zubair, IPF Degassing Project in Basra, IRAQ.
Oversaw the construction and installation of pipelines for the Hammar Project.
Managed the construction of process piping for the IPF Degassing project at Hammar, Rafidiya, and Zubair in Basra, Iraq.
Conducted hydrostatic testing for process piping and pipelines.
Led the pre-commissioning, commissioning, and handover processes for piping, pipelines, vessels, drums, heat exchangers, separators, and tanks.
Ensure all work is conducted in accordance with client specifications and established quality control procedures to uphold project standards.
Fulfilling Inspection and Test Plans to guarantee the integrity of work activities throughout the project lifecycle.
Developed Welding Procedure Specifications (WPS) and Procedure Qualification Records (PQR) to ensure compliance with industry standards.
Managed a team of QC Inspectors, assigning specific tasks to optimize workflow and maintain quality assurance.
Oversee daily inspections, collaborating closely with both company inspectors and clients to address any quality concerns promptly.
Conduct comprehensive quality training sessions for all employees, tailored to meet their specific job requirements and enhance overall performance.
By collaborating with various units, I ensure that quality standards are upheld and costs are minimized without compromising project outcomes.
Recommend quality improvements to Construction Supervisors following client approval, aiming for continuous enhancement of project execution.
Manage deviations and corrective actions for company work, ensuring compliance with all regulatory and project-specific standards.
I meticulously maintain and update quality documents and registers for easy access, ensuring that all records reflect the current project status and compliance.
Project Engineer Mechanical,CTCO, Algeria Mar’08-Oct’13
Clients : Technip, Sonatrach Algiers Refinery & In Salah Gas (Joint Venture between British Petroleum, Sonatruch and Equinor) In Algeria, Oil and Gas Project (EPC)
Successfully managed the construction and installation of re-routed pipelines for crude oil, gasoline, gasoil, fuel oil, and slop oil as part of the rehabilitation project at the Algiers Refinery.
Oversaw the construction and installation of a re-routed gas line to enhance operational efficiency at the Algiers Refinery.
Provided comprehensive mechanical, electrical, and instrumentation construction services to ensure seamless project execution.
Led the construction and installation of cone roof storage tanks and associated structural steel to support operational needs.
Managed the manufacturing and installation of new restaurant and laundry buildings in In Amenas to improve workforce facilities.
Executed the installation of a closed drain platform in the KBA CPF, enhancing infrastructure for improved drainage management.
Facilitated the construction of flow lines and gathering systems, including fabrication, testing, and commissioning, to connect well pads to the Central Production Facility in Algeria.
Coordinated the technical piping construction from hook-up points to wellheads at multiple well pads, ensuring integration with existing infrastructure.
Conducted hydrostatic testing of process piping, tanks, and pipelines to validate integrity and compliance with safety standards.
Successfully completed various structural fabrication and erection projects, demonstrating our commitment to quality craftsmanship and timely delivery.
Provided comprehensive technical design and engineering services in Mechanical Pipeline and Piping Engineering for various projects, ensuring alignment with QP procedures, quality standards, schedule, cost, and HSE considerations.
Managed onshore pipeline engineering activities during both the tender and execution phases, adhering to budgetary constraints and quality benchmarks.
Delivered training and coaching to Algerian national staff, mechanical technicians, and contractor personnel to enhance their knowledge of pipeline and piping systems.
Oversaw customer builds, project launches, and operations within company and client facilities, ensuring seamless integration and production efficiency.
Developed material take-offs and prepared detailed scopes of work for Pipeline EPC projects, facilitating accurate project execution and budgeting.
Contributed to EPC schedules and cost estimates, ensuring all project activities were executed efficiently within timelines and financial projections.
Established and enforced pipeline construction and inspection specifications, ensuring compliance with material specifications and data sheets.
Led a mechanical discipline team throughout PDP, FEED, and design phases of EPC projects, maintaining adherence to engineering codes, standards, and QA policies.
Collaborated with product development teams to address engineering design challenges, providing innovative solutions for pipeline and piping applications.
Conducted thorough inspections of mechanical equipment and adhered to current technologies, ensuring all pipeline activities met regulatory and performance standards.
Mechanical Engineer & Piping Engineer,Integrated Specialized General Cont. Co. WLL (IMECO & ECOTECH Co LLC,) Feb’05-Jan’08
Clients : Takreer Adnoc, Umm Al Nar, Fertil, Bourouge & Takreer Ruwais, Abu Dhabi (Adnoc Group), Tebodinin, Dubai Distric Health Care City, UAE.
Carry out maintenance activities at Umm Al Nar Refinery to ensure the long-term reliability of both rotating and static equipment, including shut down operations.
Managed the shutdown and maintenance of various equipment such as pumps, tanks, heat exchangers, and compressors at Umm Al Nar Refinery in Abu Dhabi.
Specialize in the construction and installation of process piping to enhance operational efficiency at the refinery.
Our refurbishment efforts include comprehensive piping activities for crude oil, LNG, gasoline, and naphtha, along with the refurbishment of 20 storage tanks at ADR Refineries - Takreer.
Efficiently conduct hydrostatic testing, pre-commissioning, and commissioning of piping systems, storage tanks, and various processing equipment to ensure regulatory compliance and optimal performance.
Provide technical assistance and coordination to meet project requirements effectively.
Support the Industrial Area Superintendent by ensuring contractor alignment with all relevant company standards and procedures.
Oversee preventative and corrective maintenance activities for the Central Production Facility to enhance equipment reliability.
Monitor contractor activities related to the maintenance of static and rotating machinery, ensuring compliance with project specifications.
Identify and address reliability and availability issues, proposing actionable plans for improvement.
Review vibration monitoring data and MMS system information for major rotating equipment, recommending long-term enhancements.
Assist in preparations for shutdowns and major maintenance activities in mechanical operations.
Ensure that contractors prioritize critical work fronts to adhere to the level-3 schedule.
Conduct site visits to evaluate contractor work quality and address any deficiencies to maintain project timelines.
Analyze productivity weaknesses and recommend corrective measures to optimize operational efficiency.
Maintenance Mechanical Engineer (Static),AGR Ashkanani Co. WLL, Kuwait Dec’02-Feb’05
Clients : Kuwait National Petroleum Company – MINA AL AHAMADI, MINA AL ABDULLA & SHUAIBA REFINERY
Execute refurbishment and repair projects within the KNPC Refinery to enhance operational efficiency.
Conduct maintenance activities at the KNPC Refinery in Kuwait to ensure the long-term reliability of rotating and static equipment, including scheduled shutdowns.
Manage the refurbishment of storage tanks and associated piping systems for crude oil, gasoline, and naphtha.
Oversee shutdown activities for static and rotating equipment, including piping, tanks, vessels, pumps, drums, heat exchangers, compressors, and separators, including hydro-testing.
Facilitate the pre-commissioning, commissioning, and handover processes for piping, tanks, vessels, drums, heat exchangers, and separators.
Oversee and manage preventative and corrective maintenance activities for the Central Production Facility to ensure the long-term reliability of static equipment.
Review and analyze engineering documents, including drawings, PIDs, completion documents, and techno-commercial proposals.
Evaluate existing facilities to propose improvements, debottlenecking, upgrades, cost reductions, and enhance the production efficiency of plants and equipment.
Provide mechanical insights for evaluating changes and modifications, and contribute to the creation and review of PFDs, P&IDs, and material selection.
Assist with mechanical maintenance shutdown preparation activities.
Support the generation of specifications, datasheets, drawings, and material selections while reviewing and preparing technical evaluations for proposals.
Lead the development and implementation of preventative maintenance programs for all types of mechanical and static industrial equipment.
Deliver input and support throughout the design, procurement, manufacturing, and commissioning phases of company facilities.
Provide troubleshooting support for mechanical static equipment issues and implement efficient solutions using a quick problem-solving approach.
Conduct technical evaluations for failure analysis and investigations, while issuing notifications for deviations from standard practices.
Construction Manager, SPS Engineering Ltd, Mumbai-India May’99-Dec’02
Clients : BPCL, HPCL Mumbai, India
Manage construction, fabrication, installation, welding, and testing of process piping projects.
Oversee the fabrication, erection, welding, and testing of various storage tanks, including floating roof and cone roof designs for naphtha and water.
Coordinate the repair, fabrication, installation, welding, and testing activities for storage tanks.
Supervise the fabrication and installation of structural steel components.
Execute comprehensive maintenance activities during shutdowns, encompassing piping systems, storage tanks, and both rotating and static equipment.
Oversaw daily construction management activities to ensure project objectives were met.
Developed, supervised, and approved the Project Execution Plan (PEP) from a construction perspective, documenting Lessons Learned throughout the project's lifecycle, including close-out.
Ensured adherence to HSE, Security, Social issues, and Quality Control measures in line with the established HSE and Quality Plans through regular audits and inspections.
Acted as the company’s construction representative for the Client, managing the construction process to develop a cost-effective plan that ensures timely completion within budget.
Monitored project details, including progress, risks, and opportunities, and provided timely reports to the Project Manager and Senior Construction Manager.
Documented all changes to project specifications, work scope, and drawings meticulously.
Established clear roles, responsibilities, and deliverable expectations for all team members in terms of scope and schedule.
Evaluated, organized, and prioritized work activities in alignment with the project schedule.
Ensured full compliance of the MC-1 handover process.
Implemented comprehensive Project Controls, including cost tracking, budgeting, scheduling, performance management, and issue resolution, in collaboration with Support Services.
Superintendent Construction Mech. Tanks,SPS Engineering Ltd, Gujarat-India Jun’97-May’99
Clients : GCPTCL (LNG Prot Terminal) Dahej, Gujarat-India
Fabricated, erected, welded, and tested various types of storage tanks, including floating roof, cone roof, and dome roof tanks for naphtha, benzene, LNG, styrene, methanol, and water storage projects.
Executed structural steel fabrication and installation projects efficiently and safely.
Managed the fabrication, welding, and installation of fire water piping systems.
Conducted hydrostatic testing for piping and storage tanks to ensure integrity and safety.
Facilitated pre-commissioning, commissioning, and handover processes for piping, vessels, and tanks.
Oversaw daily construction management activities to ensure project objectives were met effectively.
Prepared and supervised the execution of the Project Execution Plan (PEP) from a construction perspective, documenting lessons learned throughout the project's lifecycle.
Held responsibility for construction activities related to tank development, ensuring adherence to safety, quality, cost, and schedule standards while supervising relevant personnel.
Monitored and enforced compliance with contract terms and conditions for the EPC-3 contractor.
Led the oversight of the EPC-3 Contractor’s night shift operations, ensuring effective field planning, coordination, and execution across all disciplines.
QA/QC Engineer /Mechanical Engineer,SPS Engineering Ltd, Gujarat-India May’96-May’97
Clients : GACLDahej, Gujarat-India
Fabrication, erection, welding, and testing of a floating roof naphtha storage tank (20 meters in diameter and 15 meters in height) along with associated piping.
Conduct hydrostatic testing for piping and storage tanks.
Oversee pre-commissioning, commissioning, and handover processes for piping and tanks.
Piping Engineer,SPS Engineering Ltd, Gujarat-India Jun’95-Apr’96
Clients : Reliance group of Companies Ahmadabad, Gujarat-India
Engaged in the construction of a 90 MW power plant (Steam Turbine Generator).
Oversaw IBR piping fabrication, welding, erection, and testing for the power plant's steam turbine gas systems.
Conducted hydrostatic testing of IBR piping systems.
Facilitated the pre-commissioning, commissioning, and handover processes for piping, vessels, drums, heat exchangers, separators, and tanks.
Assisted in piping engineering activities for various projects and tenders under the guidance of the Lead Engineer.
Prepared material requisitions, conducted technical bid evaluations, and reviewed vendor drawings.
Coordinated the development of 3D modeling for skid package activities and participated in design verification, including 3D model, construction, and design reviews.
Piping Supervisor,SPS Engineering Ltd, Gujarat-India Jan’94-May’95
Clients : ONGC Offshore project, Bombay high oil field Neelam 6 and 9 platform
Oversee the fabrication, installation, and testing of process piping projects and Conduct hydrostatic testing for piping systems.
Manage pre-commissioning, commissioning, and handover activities for piping operations.
Ensure project scopes align with CLIENT-approved Project Management Procedures, adhering to defined HSE, quality, and scheduling standards.
Take a leadership role in construction supervision on-site.
Develop and implement a Construction Risk Assessment for assigned mechanical and piping projects to identify and mitigate associated risks.
Lead HSE initiatives on-site to achieve Goal Zero, implementing the HSE and Quality Management Plan for mechanical and piping activities.
Ensure compliance with the Project Quality Management System to deliver high-quality construction outcomes, overseeing quality inspections, deviations, and change management processes.
Implement and lead the development of mechanical and piping scopes for both Shutdown and non-Shutdown activities, ensuring effective commissioning and startup support.
Take a leading role in finalizing detailed scheduling and method statements.
Prepare timely, detailed construction progress and daily reports to facilitate effective communication and seamless project delivery.
Ensure compliance with contract terms, assist in reviewing contractor claims, and support timely material deliveries with adherence to specifications.
Trainee Mechanical Engineer & Piping Supervisor,Mukund Ltd, India Jun’92-Dec’93
Clients : Bharat Petroleum Corporation Ltd, Mahul, Bombay, Maharashtra-India
Oversaw the 90 MW power plant project at BPCL and managed the fabrication, installation, and testing of process piping systems.
SHUTDOWN & HSE EXPOSURE
Shutdown: Annual Turnaround/ Shutdown/ Slowdown in In Salah Gas (British Petroleum) Oil & Gas Projects, Algeria.
Shutdown in TAKREER-ADNOC, Umalnar - Abu Dhabi
Shutdown in GASCO Ruwais - Abu Dhabi
Shutdown in FERTIL, BOUROUGE Ruwais - Abu Dhabi
Shutdown in KNPC, MINA AL AHAMADI, - Kuwait
Shutdown in BPCL / HPCL, Mahul, Mumbai, India
HSE: Familiarity with various work permit systems and certification processes.
Conduct tool box talks with personnel as needed to highlight hazards, risks, and relevant safety information.
Engage in safety discussions with the workforce and document safety observations.
Ensure