SURENDER NAMALA

Project Management Professional (PMP)®,

Grade-A Civil Engineer certified by-

The Ministry of Municipality/UPDA-Qatar.

******.********@*****.***

Mobile: +974-**-***-***

EDUCATIONAL QUALIFICATIONS:

1989-1993 B. Tech in CIVIL ENGINEERING, First Class with Distinction from Jawaharlal Nehru Technological University College of Engineering (JNTUCE), Hyderabad, India Professional course Certified Project Management Professional (PMP)® issued by Project Management Institute (PMI)-Pennsylvania (USA).

Qatar Government’s

Certification

Grade-A Civil Engineer certified by the Urban Planning Development authority

(UPDA/MMUP) under the (MME) Ministry Of Municipality and Environment-Qatar. Approved Resident Engineer by the Ashghal (Roads / Drainages Department). Codes, Standards &

specifications

Fully Familiar with the applicable BS, European/American Standards, Specifications of ADNOC / ADCO/ADGAS/GASCO/ Qatar Energy / Dolphin Energy / Saudi Aramco & QCS- 2014, Process Industry Practices, ASHRAE, NFPA (Life & Safety), Knowledge of FIDIC Training,

Certifications

Qatar Energy-Offshore e-PTW & Onshore PTW (RLIC-CPW), OPITO-HUET/T-BOSSIET. Comply with ISO 9001, 14001, 45001.

Computer skills Primavera-P6 / MS Project, MS Office packages, AUTOCAD 2D/3D, NavisWorks-3D Date of Birth 02-June-1970

WORK EXPERIENCE:

Total work experience: 31 years 3 months and out of which, work experience in Qatar: 17 years 3 months.

Work experience in UAE: 12 years 3 months. Work experience in India: 1 year 9 months. FIELDS OF EXPERTISE: Project Management / Construction Management / Facility Management: Project Management / Construction Management

Experienced in the Design & Build (EPIC) projects of Buildings / Infrastructures, right through the design phases of Detail Design, IFC drawings, Procurement, Construction, practical Completion, PSSR, Pre- commissioning, Commissioning & handing over of the projects including preparation, follow up & close out of system / sub-system wise Punch lists, preparation of project dossier & final handing over, duly covering the red line mark-ups and up till the As-built stage. Coordination with Facility management team for the handing over of the completed buildings, utilities, services, HVAC, E & I, ELV, CCTV facilities.

Coordination with all the relevant Government authorities for the approvals during design stage & final approval stage after the practical completion and the authorities are MME (Ministry of Municipality and Environment), MOI, Qatar Civil Defense, Kahramaa, Ministry of transport Ooredoo, Vodafone.

Coordinate with multi-discipline works, Architectural/Civil/Structural/ Mechanical piping/HVAC/E& I, wet & dry utilities, internal & external stake holders, Interface management.

Project Planning/ Reporting & Contracts Administration /variations, follow up with QA/QC & oversee Inspections (FAT/SAT), Procurement assistance, involved in resolving the issues with the Sub-Contractors / Vendors / Specialist suppliers.

Facility Management:

Coordinate and handing over of the final documents to the Operations & Maintenance team of the facility management with regard to the following documents:

Asset inventories, preventive maintenance records of all the maintainable equipment, Fire and safety systems, Building Management Systems, energy Consumption Patterns, Waste Management systems, Compliance documentation, Site layout and access and etc.,

Coordinated with the facility management (WASEEF) for all the Barwa projects / Qatar Energy’s O & M & Ashghal’s O & M, GWC’s O & M (Logistics Hubs-Wukair). AREAS OF EXPERTISE:

(Oil & Gas Projects): Upstream, Midstream, Downstream, Onshore & Offshore, Green field/Brown filed projects & Process plants- Petrochemical plants, Tank farms, LNG Plants, Gas Receiving Facilities, Refineries, Pipelines, pipeline corridor/road crossings, manifolds, Crude Oil Import/Export facilities, verification of structural integrity & upgradation works in LNG plants, platforms/decks/LQ modules. Engineering support for Offshore Projects-Fabrication, loadout & Installation of Offshore Platforms-Jackets

(15 Nos.), Decks (9 Nos.) & LQ Modules (2 Nos.) for Saudi Aramco. Building Projects: Residential (Single, Multistoried, Highrise towers) with state-of-the-art architectural finishes / industrial / commercial buildings, showrooms with high-end finishes / warehouses, and mixed-use buildings in the process / petrochemical plants / coordination with the Operations & Maintenance team for the facility management related issues.

Infrastructure Projects: Desalination plants, Wastewater/Sewage treatment plants, Power plants, Chemical Storage Tanks, Substations including the installations of dry utilities like MV/LV/ELV/CCTV systems, Wet utilities like Fire water network systems including pump rooms, collection and distribution networks (Foul water/storm water / potable water with Storge tanks/TSE water / Irrigation water) and all associated piping/pipeline networks, pumping stations, Roads, drainages, U/G tunnelling projects. Marine works: Coordination for Subsea cable laying project, Construction of Cofferdams/sheet piling, dredging & Reclamation works / Quay walls / Construction of Jetty / port upgradation projects, Engage the appropriate ROVs to verify the as-built conditions of the underwater pipelines, sea bed concrete structures. Diving: Participating in review/ approval of Diving documents–Diving operations–Diving Management. Rock Works: Breakwaters / Rock Revetments / Shore Protections works.

Resume: SURENDER NAMALA

Page 2 ******.********@*****.***

The roles and responsibilities;

Having extensive working experience in managing complex construction projects within the oil and gas, energy sector, ensuring they are completed on time, within budget, and to the highest quality standards.

Responsible for the construction sites in organizing, managing and administering all site activities in accordance with the company’s operating policies and principles and relevant legislation.

Manage and control construction cost and schedule and oversee the planning, execution, and completion of large-scale EPC and EPCm projects.

Proven track record of the extensive working experience in leading the large teams and collaborating with various stakeholders. Responsible for management of installation, commissioning and completion activities.

Project Leadership: Lead and manage the construction phase of the EPC project, ensuring alignment with project goals and objectives.

Budget Management: Oversee the project budget, ensuring that the cost control measures are in place and are adhered to.

Contract administration: Review the scope of works, outline the changes in scope, and provide feedback to the Project managers/directors.

Schedule Management: Develop and maintain the project schedule, ensuring timely completion of all construction activities.

Quality Assurance: Establish and enforce quality control standards throughout the construction process. Conduct regular site inspections and audits to ensure compliance with the standards & specifications.

Stakeholder Communication: Serve as the primary point of contact for all construction-related matters, maintaining effective communication with clients, subcontractors, and all the stake holders for the completion of the project and coordinate with the Government authorities for obtaining the building completions certificates.

Team Management: Lead and mentor the construction team, fostering a collaborative and productive work environment.

Risk Management: Identify and mitigate potential risks to the project, ensuring proactive measures are in place.

Compliance: Ensure all construction activities comply with local, state, and federal regulations. Define, shape, and execute operational plans to support short- and long-term strategy including future growth aspirations.

Specific Responsibilities;

Be the primary contact with the Project Manager / Director for all Projects matters that arise in the field.

Supervise the Contractors’ Construction activities that are to be completed in accordance with good construction practice, in accordance with the Project Schedule, ensuring that the safety rules and policies are fully applied, that all contractual obligations are fulfilled.

Together with the Field Project Control Manager, review and monitor the construction program and ensure that EPC Contractor prepares detail construction schedules for all areas and steel structures’ erection activities.

Support the Project Director in discussing with Contractors the Project changes proposed. Together with Project Director, Field Project Control Manager, review single progress report and construction overall progress report, budget and field construction activities in order to reach final goals.

Receive the information from Engineering team / Contracts team and distribute to the field Discipline Engineers, to the Contractors and ensure that the works are carried out in line with the documents.

Administer the industrial relations and safety policies.

Conduct weekly meetings with Contractors and field staff in order to verify weekly progress, safety and construction aspects, availability of documents, materials, manpower, etc.

Ensure with Contractors representatives that their activities are in accordance with the Master Project Schedules, master deliverables’ documentation and follow up for the shop drawings.

Immediately report to the Project Manager / Director of any factors that are adversely affecting the project.

Coordinate as necessary with the Engineering Manager and his/her staff on all engineering matters.

Coordinate with the Contractors Construction Managers on matters pertaining to Construction progress.

Coordinate the completion of construction and testing with start-up group when applicable.

Technical Expertise: Apply specialized knowledge of Oil and Gas sector & infrastructure construction methods, materials, and regulations.

Quality Assurance: Establish and enforce quality control standards throughout the construction process. Conduct regular site inspections and audits to ensure compliance with specifications.

Environmental Compliance: Ensure all construction activities comply with environmental regulations and standards specific to the oil and gas or energy sector.

Operational Coordination: Coordinate with engineering, procurement, and operations teams to ensure seamless integration of construction activities with overall project objectives.

Technology Integration: Oversee the implementation of advanced technologies and methodologies specific to the oil and gas or energy sector to enhance project efficiency and safety.

Extensive track record managing field engineering activities within the Oil and Gas sectors / infrastructures.

Excellent communication and presentation skills, strong leadership and team management skills, strong problem-solving skills and the ability to make decisions under pressure high level of integrity and professionalism and commitment to continuous improvement and innovation in construction practices.

Resume: SURENDER NAMALA

Page 3 ******.********@*****.***

facilitate & handover the facilities to the facility management / O & M Teams and ensure that the maintenance activities are carried out safely during the DLP. Job Title: Project Engineer-Ras Laffan Petrochemical Project (11-Sep-22 to 08-Aug-24) Project Value: USD 6.0 billion (RLPP)-Chevron Phillips Chemical & Qatar Energy JV Project’s Overview: Ras Laffan Petrochemicals Project (RLPP) to support the design and construction of a 1000 kMTA ASL Polyethylene unit and a 680 kMTA ADL Polyethylene unit, Bagging and Port infrastructure. The Ras Laffan Petrochemical Project (RLPP) is a joint project between Chevron Phillips Chemical Company LP and Qatar Energy in the development of a new petrochemical plant in RLIC, Qatar. RLPP includes a 2,080 KTA ethylene cracker, two high-density polyethylene units, associated utilities, offsites, and pipelines, and a construction camp catering for a conducive living of 28000 persons within RLIC.

As a Project Engineer, contributed for the detailed design / engineering developments for all the buildings (103 Nos. of mixed-use buildings within the plant facilities considering the blast resilient criteria and 5 Nos. of buildings in the RLIC port area) including architectural / Civil / Structural/HVAC and associated equipment / Utilities / Plumbing / Drainage ensuring the safe, reliable operations of the facilities and equipment, meet the expectations of the business unit, operations, process safety, maintenance, environmental requirements.

Manage and coordinate multidiscipline engineering activities to ensure projects such as FEED (front end engineering design) studies and preparation, ITB (invitation to bid) check estimate preparation, EPIC tender package preparation are executed in a safe, efficient, cost effective and timely manner.

Act as primary technical coordination interface with the EPIC Contractor, ensure that the project conforms to the approved Basis of Design and all applicable regulatory and code requirements.

Participated in the review of 30 %, 60% and 90%-3D model reviews of the ongoing facilities and involved in HAZOP / LOPA for all the plant facilities including RCC & steel structure buildings, steel structures, pipe racks

& utilities of the RLPP to contribute the process hazard reviews including the port buildings of RLIC.

Coordinate for Company review of Management of Changes (MOC) and PHA Action Requests. Management, control, coordination, and supervision services as well as assistance for the assigned project inclusive of budget formulation, cost control and quality assurance.

Review of design documents including the method statements relevant to the steel structure modules for the fabrication & transportation (Land/sea-from fabrication yard to port at the port of embarkation, sea transportation & port of disembarkation to the project site Offices.

Participated in the kickoff meetings with critical vendors. Coordinated with QChem / QChem-facility management and interface with external stakeholders. Manage, coordinate, and consolidate responses to queries, clarifications, and document reviews from stakeholders.

Provide design and engineering input and recommendations considering capital costs, safety, environmental, operability, maintainability, and reliability. Coordinate with other disciplines (Piping, steel structures, Instrumentations, electrical, civil, etc.) where cross-functional support is required. Engage subject matter experts (SMEs) when needed.

Ensured that the capital efficient design is implemented through each phase of project execution of the Project. Responsible for overseeing the design and construction of the Polyethylene bulk bagging, loading systems and port facilities. Advise project management of developments that could affect safety, quality, cost and schedule. Assist in preparation of operations system for organizing and maintaining documentation necessary for Operations.

Dec 2020-Aug 2022: Qatar Project Management (QPM-Semi Government Company-Qatar) QPM is an ISO 9001 Company providing Engineering Consultancy Services to the Civil, buildings & Infrastructure sectors including Oil & Gas (onshore & offshore), Petrochemical & power sectors. Position: Senior Infrastructure Engineer-(Project Management & Construction Management) Design & Build Contract for the construction of Infrastructure and HOUSING PROJECT for a population of 67432 catering to the world cup FIFA 2022. Project Value: QAR 1.932 billion The project includes the Design & Engineering, procurement, construct & commission the following:

Accommodation units (177 buildings) for a population of 67432 for conducive living.

17 Nos. of substation buildings and primary substation

Operations & Maintenance building, Ministry of Interior buildings, Clinic, Friday Mosque & daily mosques, Hypermarket, local & central retail, Mess Hall & laundry facilities.

Foul water network systems with Sewage Treatment plant & TSE produced will be utilized for irrigation networks and the excess TSE connected to deep well injections. Storm water network systems with holding tank/filtration systems and finally connected to deep well injections.

Design & construct the HVAC system for the control room, mosques, admin Office, Ministry Of Interior building & O & M (Waseef) building.

Job responsibilities/Principal accountabilities;

Participated in the Design developments of all the projects right through the design phases of Schematic Design, Conceptual design, Detail Design, attending Hazop/Hazid//PHA/ Envid reviews, IFC stage, red line mark-up and up till the As-built stage. Review the designs & recommend the approval status to the Client at all levels of the design.

Resume: SURENDER NAMALA

Page 4 ******.********@*****.***

Review EPIC Contractor’s work schedules / baseline program / Work Breakdown Structures / dashboard programs/monthly to ensure that, the construction activities including procurement and other engineering deliverables that are effectively organized to meet the Projects’ completion dates with due consideration on achieving the KPI’s / milestones of the Project and report the KPIs to the line manager.

Play a key role in coordinating the project’s scope of works for the Mechanical Completion, pre-commissioning, commissioning of all the buildings systems & handing over of the final dossier along with the snagging/de- snagging/punch lists close out, red line mark-ups and as-built status of the project.

Coordinate, facilitate & handover the facilities to the facility management / O & M Teams and ensure that the maintenance activities are carried out safely during the DLP. Aug 2015-Nov 2020: Qatar Design Consortium-Qatar

Position: Resident Engineer - (Project Management & Construction Management)

QDC is an ISO 9001 Company providing Engineering Consultancy Services to the Civil, buildings & Infrastructure. Civil / Buildings & Infrastructure / Sewage treatment process unit project, Qatar Construction of logistics hub (560 Nos. of ware houses) at Bu Sulba for Gulf Warehousing Co-Al Wukair-Qatar, including 19 Nos. of warehouses (A/C & Non-A/C), 6 Nos. of Substations, cold storage warehouses, 2 Nos. of sewage treatment plants, roads, drainages, fire water networks including tanks, potable water networks, CCTV and Accommodation blocks for the workers / staff, mosques and all other related infrastructure works. Design & Build of Mannai Office Headquarters, Automobile showroom (Cadillac & GMC) and warehouses @ Doha Industrial area (Street # 5) including the installations of all the wet utilities, dry utilities, MEP systems

& HVAC systems. Acted as the Project Manager to oversee the interior fit-out, coordinate with Government authorities to obtain the building completions certificate along with the consent to operate the facilities. Design & Build Contract for Rehabilitation of Doha South STP project for Ashghal / PWA-Doha: Rehabilitation works for the whole plant which include:

Refurbishment of Inlet reception/grit chambers, upgradation of old valves at storm water tanks, ASP plant & FST, SAS wasting capacity, secondary clarifiers with bottom scrappers, TTP, Ultra Filtration (UF) balancing tank, liquor pumping stations, TSE/VFD, MOV valves for isolation of lagoons, aerobic digesters, gravity filters, anoxic tanks, thickening building, pumping stations & common conveyor structure for dewatering centrifuge system.

Repair/Refurbishment or replacement of Civil/Structural works for 35 nos. of buildings including the installation of HVAC / Buildings services.

Construction of Odor Control Units, new/additional aerobic digesters, Side Stream Filtration, bulk chemical storage & substation buildings.

Micro tunneling works for the wastewater drainage system for PWA/ ashghal by coordinating with all the respective stake holders.

Job responsibilities/Principal accountabilities

Review EPIC Contractor’s work schedules / baseline program / Work Breakdown Structures / dashboard programs/monthly to ensure that, the construction supervision activities including procurement and other engineering deliverables that are effectively organized to meet the Projects’ completion dates with due consideration on achieving the KPI’s / milestones of the Project and report the KPIs to the line manager.

Administer contractor’s works and submissions, evaluate quality of materials and workmanship, outline contract changes orders. Quantify the completed tasks & certify the quantities for Contractor’s progress and the interim / final invoices. Provide feedback to the project Manager for EOT/change orders/variations.

Play a key role in coordinating the project’s scope of works for Mechanical Completion, hook-up, pre- commissioning, commissioning & final handover of the project including handing over of the final dossier along with the snagging/de-snagging/punch lists close out, red line mark-ups and as-built status of the project. June 2007-May 2015: Qatar Energy (Major capital projects-onshore-Ras Laffan Industrial City (RLIC) & Offshore Halul Island).

Qatar Energy Project (Ras Laffan Industrial City): Common Cooling Sea Water Project (CCWP, Ph- 2, Categories 1 & 2)-Project value USD 1.530 Billion (2007 to 2010) Position: Construction Supervisor

The Overview of the project: The $ 1.53 Billion CCWP / PH-2 Category-1 & category-2, (EPIC) project is based on a combination of “Once through” and “Recirculation system” providing cooling water to the various consumers including Qatar Gas-LNG 1, Ras Gas-LNG 2 & Q-Power.

Working as a team member for the overall Construction supervision of all the on-going site activities of nearly 590,000 Cum of RCC works, 40,000 MT of Rebar, 15000 MT of structural steel in various areas including Piling works (1258 piles), Construction of Intake areas, Cofferdams, Intake Pump Houses (2 pump houses with 18 pumps), Manifolds, Distribution & Collection of Piping System (78 km GRE pipeline with an average of 3000 mm dia.) and Related Auxiliary, ancillary facilities/Buildings as follows.

Category-2 Consists of 52 km length of pipelines including U/G and A/G, GRE/GRP (Dia. varies from 600 ID to 3200 ID), 60,000.00 Cum of RCC works for the sleepers, anchors, manifolds, pipe bridges, valve pits/chambers, LLCC buildings (3 nos.), MOV building etc and earthworks of 300,000 cum.

Resume: SURENDER NAMALA

Page 5 ******.********@*****.***

Coordinate for the HVAC systems for all the buildings like Electro-chlorination building, Control building, VSDS buildings (2 nos.), Operations Building, LLCC buildings (5 nos.), Substations/220 kv building, 33 kv building, 33 kv electrical Switchgear building, workshop & Warehouse structures, Gate houses etc.

Roads, Paving, Road Crossings, Utility Crossings like Product Corridors, Power Corridors, WET utility Corridors, HP Gas Corridors, Pipe Bridges, platforms/crossovers, valve chambers, Pipe sleepers, anchor blocks, thrust blocks, piling works, Receiving Basin, Discharge Channel, Stoplog Gates, Transition channel, Diversion channel, Outfall Structure, Site grading/earthworks, Fencing the facilities within the project battery limits @ RLIC.

CCWP / PH-2 Category-2, is an EPIC project includes the construction of supplying cooling water to the end users like IPP3, Shell GTL, Barzan Gas & Laffan Refinery.

Marine works: Coordination for Subsea cable laying project from Halul Island to Ras Laffan, Coordination for Single Buoy Mooring for exporting Oil from Halul Island.

Site survey to verify the sea bed levels before & after the dredging activities to assess the scope of works of the dredging & reclamation works. Engage the appropriate ROVs to verify the as-built conditions of the underwater pipelines, sea bed concrete structures.

Construction of Cofferdams / sheet piling, dredging & Reclamation works.

Diving: Participating in review/ approval of Diving documents–Diving operations–Diving Management.

Rock Works: Breakwaters / Rock Revetments / Shore Protections works at Halul Island for Qatar Energy. Qatar Petroleum-Offshore Projects:

EPIC of Integrated Oily water/sludge handling system:

Construction of fire protection system/modification for Crude Oil Manifold system, surge tank area & produced water system. Operating, Control & safeguarding philosophy of drain system, produced/formation water system and sludge mitigation & handling system etc. EPIC of Low Pressure Associated Gas Compressor Facilities:

Design philosophy of the project: To achieve zero flaring of the low-pressure TOTAL gas. To reduce the current environmental pollution due to the burning of the sour fuel gas coming from PS-2 Platform. Blending sweet TEPQ (Total Exploration and Production Qatar) wet gas and sour PS-2 dry gas to improve the gas turbines lifespan. All available sweet gas will be used for blending which shall be supplemented by drawing sour gas from PS2.

Foundations for the LP Gas Compressor A-5052 @ TEPQ (TOTAL), LP Condensate pumps, A5052 P1 A/B, 2 units of FGTP A-5050 & A-5051– both suitable for sweet and sour gas service located towards north of Phase I & II Turbine areas. On-line mixer N-5002 and Buffer vessel V-5096 for blending the treated sweet and sour gas. EPIC of Crude Oil Import/Export upgrade facilities and beach landing facilities:

Operating and control philosophy: The crude oil system comprises of pig receivers for the sub-sea pipelines from Off-shore fields (Namely PS-1, PS-2, PS-3 and Al-Khalij) and Single Buoy Moorings (SBM-1 and SBM-2) for routing the crude oil received to wet crude oil storage tanks T5001 to T5005 in the South Tank farm. Following dehydration, the crude oil is then pumped (transferred) to six dehydrated crude oil storage export tanks T5006 to 5009 and T5050/5051 in the North Tank farm. ROVs were engaged to assess the conditions of the subsea pipelines.

The crude Oil is pumped to 2 SBMs using the existing EVSD pumps and 4 new EVSD pumps. EPIC of Desalination Plant & Potable water storage tanks at Halul Island: Design philosophy of the project: The new desalination plant is designed to produce 2,400 m3/d of potable water from seawater by using reverse osmosis technology. The RO (Reverse Osmosis) process comprises of construction of the following elements.

Sea water intake and brine outfall, Intake pumping stations feeding the new desalination plant, New desalination plant (including pre-treatment and RO units), Tanks and associated pumping stations within the new desalination plant (pumping stations to and from existing potable storage tanks and pumping station to supply Total Exploration Qatar-TEPQ), Chemical dosing facilities associated to the intake, pre- treatment and potabilization of RO permeate produced, New potable water storage tanks (2500 Cum/each), associated pumping stations and piping network, Wastewater and sludge treatment facilities. EPIC of 33/11 kv Power Distribution Substation:

Construction of 33/11 kv PDS building with all associated cable trenches, cable cellars, Transformer foundations, HV/LV equipment foundations, road crossings and other associated finishing works. Interface coordination with the construction team of sub-sea power cable project (Ras-Laffan to Halul)/132 kv substation building at Halul.

EPIC of CCTV/PAGA and Access Control Systems:

The project involves the installation of a fully functional state of the art closed circuit television (CCTV) system, public address/general alarm (PA/GA), access control system (ACS) and intrusion detection system

(IDS) together with integration of the new systems to form one electronic security system (ESS) which will be interfaced with the existing Qatar Energy information technology server for communication to QE’s Doha central security center.

EPIC of Diesel dispensing /bunkering and associated facilities at Halul Island:

Resume: SURENDER NAMALA

Page 6 ******.********@*****.***

Construction of diesel dispensing/bunkering facilities, including construction of new diesel storage tank with automation stock control methodology. Optimization of associated facilities such as fire protection and other safety system for the diesel storage tanks & ancillaries. Infrastructure Project: Construction of Integrated Chiller, Freezer, Laundry, Dining& Accommodation facilities for 600 bed accommodation complexes (Halul Island):

The 600-bed accommodation complex project on the Halul Island involves the construction of 4 accommodation blocks, chiller, freezer, dining/mess/multipurpose hall facilities, administration block, laundry block, supermarket, HV/LV substations/transformer units, pump house/water tank, septic tank, and sports facilities etc., including coordination for the commissioning of the HVAC systems Infrastructure Project: Construction of Centralized Industrial Area (Halul Island):

The infrastructure project on the Halul Island involves the construction of Office block, marine stores, workshops/warehouses, compressor/gas cylinder storage facilities, blasting and painting booth, shoreline protection works etc. that could cater additional Offshore Industrial facilities. Infrastructure Project: Construction of New Security Building/Telecom building complex including the North Ring Road of Halul Island:

New security building complex is a G+3 storied building with many facilities like sub-station building and an armory building, external service yard building and the connecting Heliport, access/internal roads, land scarping, fencing and other external works.

New Telecom Building with the following support facilities: This is a G+2 storied building with car parking and external pump room and diesel generator set including the coordination for the commissioning of HVAC systems.

Job responsibilities/Principal accountabilities;

Worked as a project team member in the Construction team of



Contact this candidate