Post Job Free
Sign in

Project Manager Risk Management

Location:
Durban, KwaZulu-Natal, South Africa
Posted:
June 27, 2025

Contact this candidate

Resume:

LUCKY MAHOMED MSANE

PROFESSIONAL PROFILE

I am man of 47 years old with more then 2 decade of construction experience. Plants or earthmoving resource management on site. Adhere to health and safety regulation to construction sector and mining. Demonstrate quality measurement and control, risk management, project planning and scheduling, cost control, strong technical and methodical amplitude with an innate ability to analyse, co-ordinate and synthesize data. Team management, prioritise the task efficiency based on plan. Ability to multi task.

ACADEMIC HISTORY

National diploma: civil engineering (S3) - 2004 MUT Certificate of AUTO CAD advance level - 2001 MUT

Introduction to spill response and product awareness from DRIZIT Matric certificate - 1996

WORK EXPERIENCE

1. UMHLALI QUARRY

PROJECT MANAGER/CIVIL FOREMAN

6 OCTOBR 2014 TO PRESENT

MAJOR PROJECT COMPLETED (9)

1. ILEMBE PRECAST 50 000 m^2 PLATFORM (bulk earthworks) 2. EAST LONDON QUARRY PLATFORMS with roads and bulk earthworks 3. GUARD HOUSE AND ROAD PROJECT (bulk earthworks)

4. DAM CONSTRUTION- bulk earthworks

4. REHABILITATION CAKEEN AND STORMWATER PIPE INSTALLATION 5. BUILDING OF WORKSHOPS AND EARTHWORKS

(PLATFORMS AND ROADS)

6. PLATFORMS AND ROAD WITH CURLVERT AND GABIONS

7. MANTANANCE OF MINE BUILDINGS AND PLUMBING ISSUES 8. AMATSHITSHI PROJECT PLATFORM (BULK EARTHWORK)

CONTACT

Cell phone: 082*******

WhatsApp:060*******

Address 1 : 28 Thendele road 4835

Kwandengezi

Address 2 : 6340 Tutu Road

Old Crossroad

Nyanga

Email : luckymsane76@gmail,com

ATTRIBUTES

Very strong interpersonal skills

Very analytical

Flexibility strong

Team player and reliable

Creative, determine

Honest

Very assertive

Calm and generous

Open and Conscientious

Self-motivated

Career driven

Hard working

Working under pressure

9. 24 m WEIGHBRIDGE & MECHANICAL WORKSHOP STRUCTURE 10. MINOR PROJECTS

11.ROAD EXTENTION WITH CONCRETE CALVERT AND GABIONS 12.MACNUT DEHUSKING PLANT ‘building a structure with 1200 m paving 13.EAST LONDON -STRACTURE BUILDING -WORK SHOP

14.WEIGHBRIDGE BUILDIONG 18 m with guard-rails

KEY COMPETENCIES

*Working closely with all levels of management, engineers, subcontractors, suppliers and field operation stuff.

*Setting up project procedures and relevant quality forms.

*Using design packages including Auto CAD to produce drawings

*Preparing progress reports and doing most relevant papers on site.

*Ensuring that all design work that is produced on the project is of a sufficient quality to avoid any errors or rework.

*Commissioning work from both in house personnel and external contractors.

*Schedule material and equipment and deliveries.

*Construction cost estimates

*Ensure the active management of quality control by all cost.

*Prepare project programs, scheduling, costing and budgeting.

*Setting out in any structural work (roads, houses, workshop, structures on the crushing plant, doing levelling using dumpy.

*Storm water pipes, storm water, subsoil drain, storm water management, sewer lines and reticulation line.

*Defining scope of work to detail.

*Deep excavations and layer works with density testing.

*Quality control and planning.

*Produce architectural drawings *Documentation.

*Team leader and plant resource or plants / machine management Enforce Health Safety (OHSA) guidelines on site ISO45001 [policies & procedures]

AREA OF EXPERTISE

1. Road projects (new roads and

rehabilitation of roads)

2. Bulk earthworks.

3. Project coordination by integrating

various resource requirements of the

production teams on site.

4. Pipe lines (bulk water supply and

reticulation.

5. Architectural Drawings and all types

working of drawings.

6. Building houses (NHBRC)

7. Concrete works.

8. Costing.

9. Working with structural drawings and

structural buildings.

10. Quality control.

11. Storm water control.

12. Ms Office packages.

13. Ms Project.

13. Auto Cad.

14. Culvert bridge.

15. Ability to demonstrate technical

knowledge.

16. Dam construction.

17. Troxler on checking density test.

18. Understanding of COLTO and GCC

*Pre-task planning for all projects on the planning phase.

*Evaluate site before the project resume with great understanding of implementation of the ISO 14001 standard on site ( environmental issues)

*Risk assessment procedures on plants and task at hand. 2. LONG ISLAND TRADING 326

SITE MANAGER/CIVIL FOREMAN

3 JUNE 2014 ENDS 26 SEPTEMBER 2014

GLEDHOW SEWER UPGRADE PHASE 1A

KEY COMPETENCIES

* Interpret engineering drawings and implement all process required from the bill of quantities with checks of design from consultant engineers and sort errors on it.

*Conducting site meeting. *Traffic accommodation. *Excavation for pipes and manholes with backfilling.

*Erecting storm water pipes, sewer lines (gravity sewer main line and rising main line), reticulation lines and road crossings.

*Installation of sewer pump on existing sewer pump station.

*Working with live sewer pipes and manholes. *Defining scope of work to detail. *Ordering of material on site.

*Liaison with engineers, client (municipality personal) and all personal on site including community at large.

*Quality control, planning and stock control. *Setting out and use of dumpy level.

*Relocate the existing services on site like electricity, water lines sewer lines.

*Documentation (payment certificate and daily report) with all relevance site documents.

*Team leader and plant resource.

*Construction cost estimates based on budget of the project.* Storm water management controls.

* Liaison with community leaders and all senior level personnel involve in the project from the consultant to municipality.

3. SIMAKHO CONTRUCTION AND TRADING ENTERPRISE

CIVIL FOREMAN

9 JANUARY 2012 TO 20 DECEMBER 2013

ETHEKWINI WATER SUPPLY AND RETICULATION

GABIONS INSTALLATION, ABLUTION BUILDING, STORMWATER AND KERBS INSTALLATION KEY COMPETENCIES

* Conducting site meeting. * Payment certificate * Planning and scheduling. *Traffic accommodation.

*Excavation for pipes and manholes with backfilling. *Installation of sewer pump on existing sewer pump station.

*Working with live sewer pipes and manholes *Defining scope of work to detail.

*Ordering of material on site. *Payment certificate.

*Liaison with engineers, client (municipality personal) and all personal on site including community at large.

*Quality control, planning and stock control. *Healthy and safety on site. *Gabions and pipes installation.

*Setting out and use of dumpy level.

*Documentation (payment certificate and daily report) with all relevance site documents.

*Team leader and plant resource.

4. SHULA CONSTRUCTION

CIVIL FOREMAN

11 JANUARY 2010 TO 10 DECEMBER 2010

MPANGENI BULK WATER SUPPLY

KEY COMPETENCIES

*Conducting site meeting.

*Traffic accommodation.

*Concrete work.

*Excavation for deep tranches and backfilling with density testing in layer works

*Erecting of ductile pipes (200 mm to 800mm diameter) for bulk water main and road crossings.

*Subsoil drain & Defining scope of work to detail

*Concrete chambers, gabion basket, gabion mattress, concrete anchors and manholes

*Liaison with engineers, client (municipality personal) and all personal on site including community at large.

*Quality control and stock control.

*Health and safety on site in reference SANS14001 AND SANS 54001

*Setting out and use of dumpy level. *Payment certificate.

*Construction estimate control. *Relocate the existing services on site like electricity, water lines sewer lines.

*Daily reports *Team leader and plant resource management 5. VULENDLELA ASPHALT

SITE MANAGER/CIVIL FOREMAN

1 OCTOBER 2007 TO 18 DECEMBER 2009

MAJOR PROJECTS COMPLETED (4)

1. MPANGENI WATER RETICULATION PHASE 2A

2. UPGRADE OF LOCAL ROAD L1835 (PMB)

3. UPGRADE OF QUARTS /DAFFODIL ROAD

4. DOCTOCTERSKOP INFRASTRUCTURE

KEY COMPETENCIES

*Conducting site meeting. *Excavation for deep tranches and backfilling with density testing in layer works.

*Platforms ( bulk earthworks) * Rehabilitation of roads and layer works.

*Building of new road from start to finish.*Storm water installation.

*Reticulation lines and pressure testing.*Performing road under cut like subsoil drain

*Gabion installation *Concrete works. *Road crossings.

*Health and safety on site. (ISO 14001 & ISO 54001)

*Concrete culvert bridge and gabions.*Defining scope of work to detail.

*Concrete chambers, concrete anchors and manholes.

*Liaison with engineers, client (municipality personal) and all personal on site including community at large.

*Quality control and stock control. *Setting out and use of dumpy level.

*Layer works *Relocate the existing services on site like electricity, water lines sewer lines.

*Daily reports. *Team leader and plant resource.

*Documentation (payment certificate and daily report) with all relevance site documents.

*Payment certificate *Interpretation of working drawings 6. AFRISCAN CONSTRUCTION

CIVIL FOREMAN

16 JANUARY 2006 TO 28 SEPTEMBER 2007

MAJOR PROJECTS COMPLETED (3)

N2 MAINTENANCE

KWACHILI WATER PROJECT PHASE 3

RESEAL R22 TO MOZAMBIQUE BOADER POST

KEY COMPETENCIES

*Conducting site meeting. *Health and safety on site.(ISO 14001 AND ISO 54001)

*Traffic accommodation, rehabilitation of road with single seal and double seal.

*Erecting road sign and speed humps. *Concrete work. *Material handling.

*Bulk earthworks.*Pipe laying, backfill and testing.

*Excavation for deep tranches and backfilling with density testing.

*Defining scope of work to detail. *Concrete chambers, concrete anchors and manholes

*Liaison with engineers, client and all personal on site including community at large.

*Quality control and stock control.*Setting out and use of dumpy level. *Relocate the existing services

*Daily reports and costing. *Team leader and plant resource. 7. MILLING TECHNIKS

TECHNICIAN

2 MAY 2005 TO 9 DECEMBER 2005

UPGRADE OF M4 (DURBAN TO ROSSBURG) ROAD REHABILITATION KEY COMPETENCIES

*Quality control and measurements.*Liaison with engineers, contractors, labours and other personnel on site.

*Daily report and other site administration work. *Enforce Health Safety (OHSA) guidelines on site.

*Plant resource and material testing.*Risk management and traffic accommodation.

*Concrete work. *Material handling.

*Milling and resurfacing of asphalt.*Telly sheet and stock pilling 7. MAJOLA DEVELOPERS

ARCHITECTURAL DRAFTER/PROJECT MANAGER/BUILDING FOREMAN 4 FEBRUARY 2002 TO 10 DECEMBER 2020 FREELANCE

WORK (SERVE UNDER NZUZOM ARCHICTURAL PROJECT)

KEY COMPETENCIES

* Drawing house plans (SACAP standard submission drawing)

* Holding site meeting *Liaison with client * Price adjustment

*Read & interpret working drawings

*Health & safety OHSA) guidelines ISO 1001*Environmental issues ISO 54001

*Planning and scheduling (design the master program)

*Site Administration *Liaison with all personnel on site

*Supervise & delegate *Material control

*Building houses NHBRC standard based on SANS regulations

*Quality control & measurement *Dumpy levelling *Plant control

*Storm water management *Steel drawing draw and interpreted

*Excavations and concrete works, sewer pipe, plumbing, setting out, payment certificate, plans approvals, project management

REFERENCES

1. NAME : HLENGWA EDWIN

ORGANISATION : BLENCOR

PHONE : 078*******

2. NAME : SITHOKOZA KHOZA

ORGANISATION : ETHEKWINI MUNICIPALITY

PHONE : 064*******



Contact this candidate