SUHAILUDDIN MANIYAR
Contact No. +966********* ~ E-Mail: ******.********@*******.*** / *.*********@*****.*** Seeking senior level assignments in Senior Project Engineer /Construction Management with an organization of high repute PROFILE SUMMARY
A result-oriented professional with nearly 19+ years of experience in Site and Construction Management, Project Management, Quality Management and Team Management
Adept in completing projects with competent cross-functional skills and ensuring on time deliverable within pre-set cost parameters with exposure in supervision and quality control on constructions.
Deft in spearheading activities involving working out various requirements and monitoring overall project operations for ensuring timely completion while handling production station.
Proficient with present construction methodologies, systems in compliance with safety, quality, quantity, and cost control standards
A proactive planner with a flair for adopting emerging trends and addressing industry requirements to achieve organizational objectives and profitability norms.
Effective communicator and negotiator with strong analytical, problem solving and organizational abilities. WORK EXPERIENCE
August 2022 till date with Al Bawani Construction Company, Saudi Arabia Senior Project Engineer / Act. Construction Manager April 2015 to May 2022 with ARKAD E & C Co, Saudi Arabia Senior QA/QC Engineer/Supervisor Civil/Structural
February 2012 to March 2015 with Mohammad Al-Mojil Group, Saudi Arabia Civil/Structural Quality Control Inspector
May 2008 to February 2011 with Douglas OHI LLC (Inter-serve Group of Companies U.K), Oman Engineer
November 2007 to March 2008 with Sobha Developers P. LTD, Bangalore, India Site Supervisor
July 2006 to November 2007 with Cicon Engineers P. LTD, Bangalore, India Site Engineer
July 2005 to June 2006 with Geo-Engineering LTD, Bangalore, India Site Engineer
Key Result Areas:
Created an efficient and good quality-oriented working environment after reviewing procedures, communicating till the last performer, and streamlining system functions.
Coordinating Quality systems in-between client and contractor.
Monitoring site visits to confirm that work practices match stipulated requirements.
Studying system and work practices and addressing problem areas to improve methods. Highlights:
Diploma in Civil Engineering.
Registered Saudi Council of Engineering Membership No.396614
Gulf experience 16+ years.
Experience of 19+ years in construction field.
Approved by Saudi Aramco as Quality Control Engineer for Civil and structural Steel works in building work, Infrastructures
& oil, gas field. Approved No. SAP No. 80005947 CIVIL CBT PASS
Saudi Aramco – approved as QC CIVIL Inspector. Ref No.-IUD/SP6/T-596/2012.
Saudi Aramco – approved as QC CIVIL Inspector. Ref No.-MPD/COGEN/T-1719/2012
Familiarization of project SATIP & Supporting SATIC & SATR and SAMSS of Saudi Aramco standards & specifications.
Familiar with ASTM, ACI Codes, PIP Standers & Worked as an Architectural QC in Saudi Aramco project TRAININGS/CERTIFICATINS ATTENDED
Civil Inspector Training (MMG)
Quality Awareness Training (MMG)
Hydrogen Sulphide Awareness and Escape (Escape Hood) & Job Hazard Analysis
ISO 9001-2015 CQI-IRCA Lead Auditor Course
ACADEMIC DETAILS
2005 Diploma in Civil Engineering from D.R.R. Govt. Polytechnic, DAVANGERE, KARNATAKA, INDIA IT SKILLS
Operating System (Worked on): Windows 95/ 98/ 2000/ XP/ 7
Tools: Auto CAD, Microsoft Office
REFER TO ANNEXURE FOR PROJECTS EXECUTED
ANNEXURE Al BAWANI CONSTRUCTION COMPANY, Saudi Arabia Project Title: ARAMCO STADIUM PROJECT
Role: Senior QA/QC Engineer
Period: September 2024 to Present
Client: SAUDI ARAMCO
Projects Description: An iconic landmark and aimed to host Saudi Pro League, Asian Football Cup (AFC) and FIFA games. PROJECT DESCRIPTION: The Aramco Stadium Master Plan in Saudi Arabia is a transformative project designed to establish a world-class sports hub. Anchored by a 45,985-seat stadium, it will serve as a premier venue for Saudi Pro League, AFC, and FIFA matches. Positioned in Dhahran within the Dammam area, the development spans 800,000 m with a 50,000 m stadium footprint. The stadium features an innovative bowl geometry for optimized spectator views and a dynamic façade enhancing shading and natural light. The scope includes the design, execution, and completion of the stadium structure, encompassing general admission areas, VIP/VVIP hospitality, player facilities, media sections, training pitches, parking, an energy center, and integrated road and landscape infrastructure. This landmark project aims to position Dammam as a global sports destination, reinforcing Saudi Arabia’s commitment to hosting major international events. Al BAWANI CONSTRUCTION COMPANY, Saudi Arabia
Project Title: King Faisal Air Academy project, Royal Saudi Air Force (RSAF) Role: Senior QA/QC Engineer Civil/Architectural
Period: August 2022 to Sep 2024
Client: Royal Saudi Air Force (RSAF)
Projects Description: The project is located North of Al-Majma'ah Governorate which is 200 KM from Riyadh City BSSJV Project of Royal Saudi Air Force (RSAF) for Construction and Relocation of King Faisal Air Academy Facilities and Utilities to its new location at Majmaah, KSA with a total area of site 314 KM2. The project consists of the 106 buildings (Service facilities, Intelligence facilities area, Air Police area, Technical & Educational facilities, Electrical Substation, STP etc.) with a built-up area of 393000 M2. The project worth 3.4 Billion SAR. Major responsibilities included: Arkad Engineering and Construction Co., Saudi Arabia Project Title: MASTER GAS SYSTEM PHASE-II PACKAGE-III Role: Senior QA/QC Engineer/Supervisor Civil/Structural Period: September 2017 to May 2022
Client: Saudi Aramco
Brief Project Details:
Detail Engineering Design, Procurement, 56” Diameter Approximately 150 KM long from EWPS # 1 to BGCS#3 for SRG-3 and another 56” Diameter Approximately 40 KM Long from BGCS#3 to KM 245.2 for SRG-2 SEC III. Major Scope is to Construct the ROW along the Pipe line, Construction of Pipe line, 10 Valve station, Burn Pits, Black Powder Filtration System, Corrosion inhibitor Skids, ten (10) Thrust Bore/ Open Cut Road Crossing Duties & Responsibilities: Act. CONSTRUCTION MANAGER
Managing the construction and playing a stellar role in ensuring that the safety, quality and legal norms were adhered to on site
Reporting to the Operations Manager
Review of project proposals along with the QS department before submission to the Clients.
Identifying the materials requirements, initiate and follow up of procurement.
Reviewing the AFC drawings, conducting the site visits along with the end users and sharing the inputs if any to the design team for the modification/revision of drawings.
Handling a team consisting of Engineers, planners and other administration staffs.
Attending meetings with the clients
Tracking the progress schedule and taking a recovery measures in case of any delay due to the unavoidable circumstances
Managing both the nominated and internal sub-contractors, arranging the interface meetings with all the subcontractors to align with the project completion date
Making sure that the cost of construction is in line with the budget Arkad Engineering and Construction Co., Saudi Arabia Project Title: ON-SHORE MAINTAIN POTENTIAL PROGRAMM (OMPP) Role: QC Civil Inspector
Period: April 2015 to September 2017
Client: Saudi Aramco
Brief Project Details:
Construction of all phases of well head sites including flow lines, trunk lines, laterals, manifolds. Transfer lines, water injection lines and test and production lines. Contractor shall construct Overhead Power Line, upgrade Supervisory Control and Data Acquisition (SCADA), Remote Terminal Units (RTU’s) fiber optic cable, optical transmission equipment, Ethernet switches, and other WORK directed by Saudi Aramco
At Mohammad Al-Mojil Group, Saudi Arabia
Project Title: WASIT GAS PROGRAM, INLET & GAS PROCEESSING FACILITIES PROJECT Role: Quality Control Inspector
Period: January 2013 to March 2015
Client: Saudi Aramco (main contractor S.K. Engineering & Construction) Brief Project Details:
The scope of work includes construction of the Arabiah Condensate Handling Facility and Sour Water Disposal Unit Project at the Wasit Gas Plant in the Kingdom's Eastern Province, the contract also includes installation of process equipment as well as related civil and structural, piping, electrical and instrumentation and control systems. Wasit Gas Plant is one of the largest gas plants to come onstream in Saudi Arabia
Project Title: YASREF YANBU ARAMCO SINOPEC REFINARY PROJECT Role: Quality Control Inspector
Period: October 2012 to December 2012
Client: Saudi Aramco.
Brief Project Details:
This package included Detail Design and Engineering, Procurement, Construction, and Pre-Commissioning for YASREF/ YR Clean Fuels Interfacing Facilities. The scope included procurement of pipes (RTR, CS), Metering Skids, Dye Injection Skids, Octane analyzers, Vales, Electrical & Instrumentation items, & all bulk piping/ E&I/ civil & structural materials. Construction includes civil, structural, piping, electrical, instrumentation, mechanical, and painting work for completion of the facilities and its pre-commissioning including lines two (2) number of 30” dia pipes of 14 kilometers for Clean Fuel Transportation from YASREF to Yanbu Refinery, conversion of the existing fixed roof to IFR for three (3) tanks, custody metering installation, surge skids, etc.
Project Title: Manifa Co-Generation & Main Stations (SAUDI ARAMCO PROJECT) Role: Quality Control Inspector
Period: June 2012 to September 2012
Client: Technicas Reunidas Gulf
Brief Project Details:
The Manifa Site is located 200 km north of Dhahran, Kingdom of Saudi Arabia. Civil Works, Architectural & Structural works, Earthworks and Road works for the Flare area, Construction of Pipe Racks foundations, construction of Pipe Supports, Pipe Sleepers, construction of Swales, construction of Manholes, Sumps, Lifting stations, construction of substations buildings, construction of process interface buildings, flare foundations, KO drum foundations, Sand arrestors, Tank foundations etc. Construction of Evaporation Ponds including HDPE Liner works and fence, Construction of Drain Trenches, Construction of Perimeter Fence, Plant pavements, and Road work, Supply, Fabricate and installation of all the embedded items and structural steel works for pipe and cable rack supports. Mechanical Piping Works - Installation
Project Title: ABF & Anode Handling Project - Saudi Arabian Bechtel Company (SABCO) Role : Quality Control Inspector
Client : SAUDI ARABIAN MINING COMPANY (MA ADEN)
Period : February 2012 to June 2012
Brief Project Details:
ABF & Anode Handling Project has awarded this contract to "Mohammad Al-Mojil Group" which in turn has requested ETE to perform the complete work on back-to-back to basics. Construction of Two Concrete Silos by slip forming method within 5 months Silo T02 height 18.2 m and 26 m dia, Silo T03 height 29.6 m and 26 m dia, Construction of foundations of conveyor, Construction of pile caps, foundations, columns, Construction of suspended beams, slab and Silo Structure Construction of Storage Building
Duties & Responsibilities: Senior QA/QC Engineer Civil/Architectural
Monitoring contractor`s inspector and quality system to ensure adequate performance and compliance with Company Quality requirements.
Prepare Inspection and surveillance reports.
Assist in the review of Project Drawing and Specifications for compliance with Company and International Standards.
Promote and build awareness of the project quality requirements.
Perform focused assessments of specific work elements to ensure that the project quality activities and processes are effective.
Performed as a Quality control Inspector for the supervision of Reinforcement and monitoring of concrete pouring.
Performed as an inspector for Concrete curing inspection and maintenance according to specifications.
Monitoring and conducting all type of tests dealing with concrete and soil.
Raise Request for Inspection (RFI) for the work performed to Saudi Aramco Project Management Team & Project Inspection Department for checking, verification, and approval.
Implements actions and requirements as detailed in the Project’s Inspection and Test Plans
Assist in correcting issues and closing of all non-conformance & corrective action reports relating to the Project.
Reads, verifies, and ensures that specifications, plans and drawings are correctly implemented.
Cooperate for the correct implementation of all procedure relating to the Project in accordance with the Contracts, Saudi Aramco Engineering Standards, Procedures, and all applicable regulatory requirements and to enhance Saudi Aramco satisfaction.
Study & Review of Aramco standards relevant to Project scope of work.
Perform other inspection related duties as directed by the Inspection Supervisor/PQM
Performed as an Architectural QC for all architectural work.
Performed as an inspector for installation of gypsum board work, waterproofing work, plastering works. At Douglas OHI LLC, Oman Job Profile: Engineer
Title: AL SUKRI COMMERCIAL BUILDING
Role: Engineer
Period: July 2010 to March 2011
Client: Services & Trades
Brief Project Details:
The works comprised the construction of a reinforced concrete framed structure with 2 basement levels below ground, and 7 floors above ground. The structural frame consisted of a raft foundation, in-situ structure for basement and ground slab and pre-cast concrete slabs for the typical building floors. Internally the building was fit-out to a high-quality specification. Title: Oxy-Mukhaizna
Role: Engineer
Period: Jan 2010 to July 2010
Client: Occidental Mukhaizna LLC
Brief Project Details:
The work included construction of various type of heavy-duty foundations (Steam Generator, Transformer and Pumps), foundation of various tanks (Raw Water Tank, Softener Feed Water Tank, Waste Water Disposal Tank), various other foundations, chemical storage, RCC sleepers and pipe supports (pre cast and cast in situ), water tight pits, pipe trench, deaerator structure and control building up to sub-structure. Title: Oman Dental College Project B+G+3 Floors (Muscat) Role: Engineer
Period: June 2009 to Dec 2009
Client: Ministry of Oman
Brief Project Details:
Oman Dental College is the first and currently the only dental college in the Sultanate of Oman providing undergraduate clinical education to students. The works comprised the construction of a one-story basement, ground level, plus three upper levels constructed using a steel framed structure with metal decks and in situ concrete slabs. Internally the rooms comprised a mix of clean room and clinical environments for medical treatments, classrooms, offices and public spaces incorporating canteens and reception facilities Title: Barka Power and Desalination Plant
Role: Engineer
Period: May 2008 to May 2009
Client: Doosan Heavy Industries Company
Brief Project Details:
Douglas OHI completed the construction of temporary offices, workshops, and a warehouse building to support Degremont and its subcontractors at the Barka Desalination Plant. The project included setting up essential infrastructure, such as temporary fencing and access roads, to ensure a safe and efficient workspace, reinforcing Douglas OHI's commitment to facilitating large- scale industrial projects in Oman.
At Sobha Developers P. LTD, Bangalore, India
Title: Construction of Bungalow
Role: Site Supervisor
Period: November 2007 to March 2008
Client: Sudha Gopalakrishnan, C.E.O Infosys
At Cicon Engineers P. LTD, Bangalore, India
Title: Construction of I.T Mind Tree Tech Park
Role: Site Engineer
Period: Jul 2006 to November 2007
Client: Mind Tree Tech
At Geo-Engineering LTD, Bangalore, India
Title: Construction of Piles, Soil Auger Boring for testing of soil Role: Site Engineer
Period: July 2005 to June 2006
Duties & Responsibilities – As a Site Engineer
Managing the construction and playing a stellar role in ensuring that the safety, quality and legal norms were adhered to on site
Reporting to the Operations Manager
Review of project proposals along with the QS department before submission to the Clients.
Identifying the materials requirements, initiate and follow up of procurement.
Reviewing the AFC drawings, conducting the site visits along with the end users and sharing the inputs if any to the design team for the modification/revision of drawings.
Handling a team consisting of Engineers, planners and other administration staffs.
Attending meetings with the clients
Tracking the progress schedule and taking a recovery measures in case of any delay due to the unavoidable circumstances
Managing both the nominated and internal sub-contractors, arranging the interface meetings with all the subcontractors to align with the project completion date
Making sure that the cost of construction is in line with the budget
Carried out Supervision & quality control on constructions o Quantity surveying & measurement
Played a stellar role in checking of Alignment and RL of roads and culverts as per drawing
Efficiently checked the running amount bill of the contractor
Liaised with the MMRDA authorities and accordingly attended them on site
Essayed a key role in originating the non-conformance report against the contractor in case of violation of the specs