Post Job Free
Sign in

Pick Up Drilling

Location:
Arlington, TX
Salary:
negotable
Posted:
June 26, 2025

Contact this candidate

Resume:

William F. Owen

**/****- **/** ******* to Pemex Offshore Mexico Drilling and Completion operations thru ALPHA petroleum Services.

**/**** – 09/2015 ConocoPhillips Alaska ROV Technologies Managed Pressure Drilling advisor on North Slope in Alaska. Implementing Safe Kick MPD system on various drilling rigs in the Kuparuk Field.

03/2012- 09/2014 Hunt Oil Company

Anadarko Petroleum Corp.

Arlington Consultants, Inc. Drilling Supervisor

Eagle Ford Shale South Texas

Supervision of drilling operations in the Eagle Ford formation in South Texas area. Typically would involve the drilling of curve or turnazontal type well to be landed at 10,000 TVD with a total vertical section of up to 8,000 ft. on a down dip formation. BHA consist of steerable directional assemblies as well as rotary steerable BHA’s. Drill hole sizes of 6” to 8

” in the lateral with OBM systems .WBM systems are sometimes used but with greater difficulty. Wells would involve multiple strings of casing with 13 3/8” surface casing, 9 5/8” intermediate casing, 7” liners, and 5 ” production casing. Drilling extended reach well / Horizontal

On a 2 well pad location w/ 20” conduction was preset. Drill 17” surface hole to 300’ w/ WBM. Set and cemented 13 3/8” casing and circulated cement to surface. Nipple up 13 5/8” 10K BOP stack. Drill out with 12 ” bit . At 350’ kicked out 2 degree / 100’. Build up to 4 degree. Hold 4 degree to 5,400’ at 225 azimuth. Dropped back to vertical and TD 12 ” hole at 6,800’. w/ WBM Corbonox / gel mud system. Set 9 5/8” casing and cemented. Drilled out shoe with 8 ” conventional BHA. Displaced to OBM. Continue to drill vertically to 8,900’. Start build 8 degree/ 100’ at 141 degree azimuth. To 9,463 feet hold 45 degree and turn to 133.75 azimuth. Continue to build at 8 degrees / 100’ to landing point @ 9,990 at 86.5 deg inclination. With 132 azimuth. 9600’ TVD . Drill lateral with a 20’ window at 85.6 deg inclination to 17,382 MD at 10,080 TVD. 7,400’ of vertical section. Drilled well with 550 psi differential in production interval @ 500 GPM with 1.5 motor with .497 rev per/ gallon. ROP average 100 plus feet/ hr. Drilling slightly underbalanced. Anadarko Petroleum Corp.

SENIOR/ DRILLING and

COMPLETIONS

SUPERVISOR /FORMAN

11/2010- 10/2011

Lycoming County Pennsylvania.

Marcellus Shale and Eagle Ford

Drilling extended reach well / Horizontal

Moved on multi well pad location on 15’ spacing with 17” conductor preset at 80’. Pick up 12 ” air hammer bit. Drill with air hammer to 2,300’ and set 9 5/8” casing. Cement to surface, nipple up BOP stack. Pick up 8 ” air hammer bit and air drill to 5600’. Displace well to OBM POOH and pick up directional assembly . Drill vertically to KOP at 8,300 feet. Drilled at 6 degrees per hundred at 112 deg azimuth. To landing point a 9,800 feet w/t 91.2 degrees inclination . Drilled lateral with 12’ window to a measured depth of 15,340’. 5,540 vertical section. Drilled w/ 500 GPM w 1.18 motor with .5 rev/gal. at a ROP of 127 ft/hr Drilling with balance mud wt. 11/2011 -03/2012

Brooks Range Exploration Project Chandler 1, Anchorage/ Dead Horse Alaska, Completion of Exploration Gas well in remote location North Slope Alaska. Tight hole

2724 Canyon Crest Ct

Arlington, TX 76006

915-***-****

**.****@*****.***

12/06 to 10/2010 –ACI- Shell Auger/Brutus/URSA TLP GOM. Drilling & Completions Supervisor. SHELL OIL COMPANY, New Orleans, Louisiana, USA Rig Supervisor – Project drilling and Completions foreman, Gulf of Mexico in the Shell TLP deepwater group. Slot recovery operations on Brutus TLP cutting & retrieving 7” production tubing string, setting bridge plugs, balanced cement plugs, whipstock setting & casing window milling operations to facilitate drilling new production wellbore. Sidetracking A-4 wellbore with rotary steerable LWD tools employing managed pressure drilling techniques and equipment through variable frac pressure stability windows including pipe-conveyed logging tools with side-entry sub with annular external wireline. Cleaned and opened A-4 wellbore with 7” devil drill hole opener and Schlumberger Stethoscope tool acquiring direct formation pore pressure readings and fluid samples in the H2 and G series sands. Successfully installed 5.5” liner with Drill-Quip liner hanger assembly at 16,000 feet and cemented liner in place. Circulate & reverse circulate wellbore clean using ball-actuated circulating valve just above liner top. Set CIBP above liner shoe. Run segmented bong log, pulse decay and gammas ray logs. Run casing scrapers through wellbore. Displace wellbore to CaBr2. Wellbore recompletion with gas lift mandrels, sub-surface safety valve, mud line tubing hanger and bottom hole pressure sensor with control lines.

Anadarko E & P / Alaskan Exploration season 2007

Cypress and Devon East Texas. Shell Auger GOM MPD Engineer. 10/05 to 12/06

Nexen Petroleum Inc. as Drilling Supervisor - Vermilion 67, Eugene Island 258, EI 257, EI 259 Platforms - Gulf Of Mexico 09/05 to 10/05

ACI contracted to Remedy Resources for Harvest Vinccler in Maturin, Venezuela. Workover and completions in Temblador field, Venezuela 09/03 to 08/05

Manley McAdam contracted to BP America in Wamsutter Wyoming. H & P Rig 159 Drilling Supervisor and completions . 06/02 to 08/03

ACI contracted to Remedy Resources/ PD Mexicana as Drilling Supervisor PD Rig 721,733 and 736 in Burgos Gas Field for Pemex Tamaulipas and Nuevo Leon, Mexico

10/01 –06/02

ACI contracted to BHP Petroleum as Drilling and Completions Supervisor GSF Adriatic III Jackup

Trinidad Operations Blk 2(ab) Crapaud No.1, Blk 2(c) Canteen No.2 Diamond Ocean Quest

Green Canyon Gulf of Mexico Boris No.1

Ocean Quest Semi-Submersible Rig 2,500 ft. water

05/01-09/01

Anadarko Algerian Corporation

Hassi Messaoud, Algeria

Day Drilling Supervisor in HBNS and BKNE Field Algeria 09/00-04/01

Fairweather E. & P. contracted to

British Petroleum Exploration Alaska

Anchorage, Alaska.

Supervisor on Nabors Rig 4 ES sidetracks, workover, completions. ESP At Milne Point Alaska

SENIOR DRILLING/

COMPLETION

SUPERVISOR:

Supervisor/Trainer

Mud Engineer

TRAINING & SEMINARS:

10/99-09/00

Clover contracted to

BP/AMOCO GOM –SHELF

Houston, Texas

Drilling / Completions Supervisor

Eugene Island 273 on Diamond Ocean King

Matagorda Island 623, 622 on Ensco 82

11/97- 01/99

Fairweather E. & P. contracted to

British Petroleum Exploration Alaska

Anchorage, Alaska.

Drilling / Completions Representative employed by Fairweather E & P Inc. Anchorage, Alaska and contracted to BPXA Alaskan North Slope for Shared Services Drilling (ARCO & BP). In Prudhoe Bay drilling Sidetracks and Badami drilling MLOH (Multi-Lateral Open Hole) wells. Worked on the first MLOH with 3 penetrations drilled in Alaska. 2/82 – 11/97

Enserch Exploration Inc.

Dallas, Texas, Athens Texas and Bridgeport, Texas

Supervision of drilling/ completions and directional drilling operations in Rocky Mountain Region some of which are included in the Williston, Powder River as well as the Permian, Hardeman, Fort Worth and Anadarko Basins. Supervision of new well completions, foam and air drilling, frac treatments, in the East and North Texas 6/81 - 2/82

Gulf Oil E. & P. / Drilling Department

Odessa, Texas

Trained as supervisor for drilling operations. Supervised and trained personnel in mud engineering in Anadarko Basin in Oklahoma. 7/79 - 6/81

NL Baroid - Mud Engineer

1999

CCI Training Center

Microsoft Networking Essentials Certified

Implementing and Supporting NT 4.0 Workstation Certified Implementing and Supporting NT 4.0 Server Certified Society of Petroleum Engineers- SPE Member of Forth Worth Chapter – Current

1997

Stuck Pipe School

Anchorage, Alaska

2003

Prentice Advanced Well Control

Reynosa, Mexico

2009 Sea Survival Helicopter Safety and Egress –Robert, La 2013 IADC Well Control (Wellcap Expires -10-30-2015) EDUCATION:

1976

Texas Tech University

Bachelor’s Degree in Communications

Minor: Agriculture and Spanish

1974

University of Texas at El Paso

1973

Coronado High School

El Paso, Texas

FOREIGN LANGUAGE:

REFERENCES:

Spoken: Spanish

Written: Spanish

Danny Hagins

Retired Energen Supt.

4705 Crista Ln.

Midland, TX 79707-2400

432-***-****

Isidro Garcia

Andrews Texas

432-***-****

Kevin Ward

Shell Senior Drilling Supervisor

PO Box 355

Palmer, Texas 75152

214-***-****

******@********************.***



Contact this candidate