William F. Owen
**/****- **/** ******* to Pemex Offshore Mexico Drilling and Completion operations thru ALPHA petroleum Services.
**/**** – 09/2015 ConocoPhillips Alaska ROV Technologies Managed Pressure Drilling advisor on North Slope in Alaska. Implementing Safe Kick MPD system on various drilling rigs in the Kuparuk Field.
03/2012- 09/2014 Hunt Oil Company
Anadarko Petroleum Corp.
Arlington Consultants, Inc. Drilling Supervisor
Eagle Ford Shale South Texas
Supervision of drilling operations in the Eagle Ford formation in South Texas area. Typically would involve the drilling of curve or turnazontal type well to be landed at 10,000 TVD with a total vertical section of up to 8,000 ft. on a down dip formation. BHA consist of steerable directional assemblies as well as rotary steerable BHA’s. Drill hole sizes of 6” to 8
” in the lateral with OBM systems .WBM systems are sometimes used but with greater difficulty. Wells would involve multiple strings of casing with 13 3/8” surface casing, 9 5/8” intermediate casing, 7” liners, and 5 ” production casing. Drilling extended reach well / Horizontal
On a 2 well pad location w/ 20” conduction was preset. Drill 17” surface hole to 300’ w/ WBM. Set and cemented 13 3/8” casing and circulated cement to surface. Nipple up 13 5/8” 10K BOP stack. Drill out with 12 ” bit . At 350’ kicked out 2 degree / 100’. Build up to 4 degree. Hold 4 degree to 5,400’ at 225 azimuth. Dropped back to vertical and TD 12 ” hole at 6,800’. w/ WBM Corbonox / gel mud system. Set 9 5/8” casing and cemented. Drilled out shoe with 8 ” conventional BHA. Displaced to OBM. Continue to drill vertically to 8,900’. Start build 8 degree/ 100’ at 141 degree azimuth. To 9,463 feet hold 45 degree and turn to 133.75 azimuth. Continue to build at 8 degrees / 100’ to landing point @ 9,990 at 86.5 deg inclination. With 132 azimuth. 9600’ TVD . Drill lateral with a 20’ window at 85.6 deg inclination to 17,382 MD at 10,080 TVD. 7,400’ of vertical section. Drilled well with 550 psi differential in production interval @ 500 GPM with 1.5 motor with .497 rev per/ gallon. ROP average 100 plus feet/ hr. Drilling slightly underbalanced. Anadarko Petroleum Corp.
SENIOR/ DRILLING and
COMPLETIONS
SUPERVISOR /FORMAN
11/2010- 10/2011
Lycoming County Pennsylvania.
Marcellus Shale and Eagle Ford
Drilling extended reach well / Horizontal
Moved on multi well pad location on 15’ spacing with 17” conductor preset at 80’. Pick up 12 ” air hammer bit. Drill with air hammer to 2,300’ and set 9 5/8” casing. Cement to surface, nipple up BOP stack. Pick up 8 ” air hammer bit and air drill to 5600’. Displace well to OBM POOH and pick up directional assembly . Drill vertically to KOP at 8,300 feet. Drilled at 6 degrees per hundred at 112 deg azimuth. To landing point a 9,800 feet w/t 91.2 degrees inclination . Drilled lateral with 12’ window to a measured depth of 15,340’. 5,540 vertical section. Drilled w/ 500 GPM w 1.18 motor with .5 rev/gal. at a ROP of 127 ft/hr Drilling with balance mud wt. 11/2011 -03/2012
Brooks Range Exploration Project Chandler 1, Anchorage/ Dead Horse Alaska, Completion of Exploration Gas well in remote location North Slope Alaska. Tight hole
2724 Canyon Crest Ct
Arlington, TX 76006
**.****@*****.***
12/06 to 10/2010 –ACI- Shell Auger/Brutus/URSA TLP GOM. Drilling & Completions Supervisor. SHELL OIL COMPANY, New Orleans, Louisiana, USA Rig Supervisor – Project drilling and Completions foreman, Gulf of Mexico in the Shell TLP deepwater group. Slot recovery operations on Brutus TLP cutting & retrieving 7” production tubing string, setting bridge plugs, balanced cement plugs, whipstock setting & casing window milling operations to facilitate drilling new production wellbore. Sidetracking A-4 wellbore with rotary steerable LWD tools employing managed pressure drilling techniques and equipment through variable frac pressure stability windows including pipe-conveyed logging tools with side-entry sub with annular external wireline. Cleaned and opened A-4 wellbore with 7” devil drill hole opener and Schlumberger Stethoscope tool acquiring direct formation pore pressure readings and fluid samples in the H2 and G series sands. Successfully installed 5.5” liner with Drill-Quip liner hanger assembly at 16,000 feet and cemented liner in place. Circulate & reverse circulate wellbore clean using ball-actuated circulating valve just above liner top. Set CIBP above liner shoe. Run segmented bong log, pulse decay and gammas ray logs. Run casing scrapers through wellbore. Displace wellbore to CaBr2. Wellbore recompletion with gas lift mandrels, sub-surface safety valve, mud line tubing hanger and bottom hole pressure sensor with control lines.
Anadarko E & P / Alaskan Exploration season 2007
Cypress and Devon East Texas. Shell Auger GOM MPD Engineer. 10/05 to 12/06
Nexen Petroleum Inc. as Drilling Supervisor - Vermilion 67, Eugene Island 258, EI 257, EI 259 Platforms - Gulf Of Mexico 09/05 to 10/05
ACI contracted to Remedy Resources for Harvest Vinccler in Maturin, Venezuela. Workover and completions in Temblador field, Venezuela 09/03 to 08/05
Manley McAdam contracted to BP America in Wamsutter Wyoming. H & P Rig 159 Drilling Supervisor and completions . 06/02 to 08/03
ACI contracted to Remedy Resources/ PD Mexicana as Drilling Supervisor PD Rig 721,733 and 736 in Burgos Gas Field for Pemex Tamaulipas and Nuevo Leon, Mexico
10/01 –06/02
ACI contracted to BHP Petroleum as Drilling and Completions Supervisor GSF Adriatic III Jackup
Trinidad Operations Blk 2(ab) Crapaud No.1, Blk 2(c) Canteen No.2 Diamond Ocean Quest
Green Canyon Gulf of Mexico Boris No.1
Ocean Quest Semi-Submersible Rig 2,500 ft. water
05/01-09/01
Anadarko Algerian Corporation
Hassi Messaoud, Algeria
Day Drilling Supervisor in HBNS and BKNE Field Algeria 09/00-04/01
Fairweather E. & P. contracted to
British Petroleum Exploration Alaska
Anchorage, Alaska.
Supervisor on Nabors Rig 4 ES sidetracks, workover, completions. ESP At Milne Point Alaska
SENIOR DRILLING/
COMPLETION
SUPERVISOR:
Supervisor/Trainer
Mud Engineer
TRAINING & SEMINARS:
10/99-09/00
Clover contracted to
BP/AMOCO GOM –SHELF
Houston, Texas
Drilling / Completions Supervisor
Eugene Island 273 on Diamond Ocean King
Matagorda Island 623, 622 on Ensco 82
11/97- 01/99
Fairweather E. & P. contracted to
British Petroleum Exploration Alaska
Anchorage, Alaska.
Drilling / Completions Representative employed by Fairweather E & P Inc. Anchorage, Alaska and contracted to BPXA Alaskan North Slope for Shared Services Drilling (ARCO & BP). In Prudhoe Bay drilling Sidetracks and Badami drilling MLOH (Multi-Lateral Open Hole) wells. Worked on the first MLOH with 3 penetrations drilled in Alaska. 2/82 – 11/97
Enserch Exploration Inc.
Dallas, Texas, Athens Texas and Bridgeport, Texas
Supervision of drilling/ completions and directional drilling operations in Rocky Mountain Region some of which are included in the Williston, Powder River as well as the Permian, Hardeman, Fort Worth and Anadarko Basins. Supervision of new well completions, foam and air drilling, frac treatments, in the East and North Texas 6/81 - 2/82
Gulf Oil E. & P. / Drilling Department
Odessa, Texas
Trained as supervisor for drilling operations. Supervised and trained personnel in mud engineering in Anadarko Basin in Oklahoma. 7/79 - 6/81
NL Baroid - Mud Engineer
1999
CCI Training Center
Microsoft Networking Essentials Certified
Implementing and Supporting NT 4.0 Workstation Certified Implementing and Supporting NT 4.0 Server Certified Society of Petroleum Engineers- SPE Member of Forth Worth Chapter – Current
1997
Stuck Pipe School
Anchorage, Alaska
2003
Prentice Advanced Well Control
Reynosa, Mexico
2009 Sea Survival Helicopter Safety and Egress –Robert, La 2013 IADC Well Control (Wellcap Expires -10-30-2015) EDUCATION:
1976
Texas Tech University
Bachelor’s Degree in Communications
Minor: Agriculture and Spanish
1974
University of Texas at El Paso
1973
Coronado High School
El Paso, Texas
FOREIGN LANGUAGE:
REFERENCES:
Spoken: Spanish
Written: Spanish
Danny Hagins
Retired Energen Supt.
4705 Crista Ln.
Midland, TX 79707-2400
Isidro Garcia
Andrews Texas
Kevin Ward
Shell Senior Drilling Supervisor
PO Box 355
Palmer, Texas 75152
******@********************.***