Post Job Free
Sign in

Fire Alarm Fiber Optic

Location:
Tudela, Misamis Occidental, Philippines
Salary:
40/hr
Posted:
June 24, 2025

Contact this candidate

Resume:

CURRICULUM VITAE

Position Desired: ELECTRICIAN

Experiences:

Fiber Optic Cable Splicer

Instrument Technician

Loop Test

Electrical Low current

Fire Alarm Technician

Personal Details

Name: Gilbert Bravo Lague

Date of Birth: December 3,1983

Nationality: Filipino

Gender: Male

Height: 5”5’ft

Weight: 55 kg

Religion: Roman Catholic

Civil Status: Marriage

Home Address: P5.Basirang,Tudela Misamis Occidental .

Contact number: +63-921-****-*** / +63-981-***-****(Phil)

Email address: ***********@*****.***

Name of Company: Saudi Oger Company Ltd.

Address: Riyadh Saudi Arabia

Project: Ministry of Interior (MOI)

Ministry of Education (MOE)

Ministry of Foreign Affairs (MOFA)

Position: Low Current Technician

Date: March 19, 2014 To March 13, 2016

Duties and Responsibilities:

Installation and termination of all accessories of data panel and switcher fiber optic cable splicing /RJ 45 Termination,T568A & T568B.wire mapping, fluke test and DTXs and Cable IQs.

Installation and termination of all devices for fire alarm system interface and supervisory module.

Installation and termination Of Public address and intercom with video switch and audio switch.

Installation and Setting of CCTV camera PTZ, FIXED, DOME Camera for

Indoor and Outdoor.

Installation and termination of MATV .RG6,RG11 outlet socket. And accessories.

Testing and commissioning

Name of Company:Saudi Services for Electro Mechanic Woks Co. LTD. (SSEM)

Address:Riyadh P.O Box. 6341, Riyadh 11442, KSA

Project:Power Plant No.10 13.8 kV/132kV GIS Substation

Position: InstrumentTechnician

Date:October 2,2009 to May. 20,2011

Duties and Responsibilities:

Wiring and termination and modification of LCC, CT,PT, SCADA and all parts of GIS 13.8kV,132kV

Installation of cable trays, cable ladders and conduitting.

Wiring termination and modification works on Bussbar Protection panel.

Strong background on fire alarm systemand telephone system.

Termination of control cable DCS panel

Termination of power cable

Installation and termination of battery DC supply

Piping and Installation for lighting fixtures (2way&4way switch )

Name of Company:Saudi Services for Electro Mechanic Woks Co. LTD. (SSEM)

Project: Al Qurayat Power Plant No:2Expansion

Position: Instrument Technician

Date: May 25, 2011 to June22,2012

Duties and Responsibilities:

Wiring and termination of feeder line cable

Termination of 4.16Kv and 13.8kv switchgears.

Set up of 4.16kv switchgear cabinet.

Terminate AHU motor and its motor control

Wiring layout and troubleshoot of fire alarm system

Termination/Testing and commissioning of DCS and BMS.

Electrical Wiring lighting and switches (3Way)(4Way)

Name of Company:Saudi Services for Electro Mechanic Woks Co. LTD. (SSEM)

Project: Al Rafha power Plant No.2

Position: Instrument Technician

Date: June 27, 2012 to October 20, 2013

Duties and Responsibilities:

Installation of cable trays,cable ladders.

Wiring termination of feeder line cable of all motors and controls.

Terminate at VFD,Wye delta control circuit and soft starter motor controls.

Terminate AHU motor and motor control.

Wiring layout of MOV and DDC Panel.

As built drawing of electrical plant

Name of Company:Philippine Long Distance Telephone Comp.(PLDT)

Project:Rehabilitation of New Generation Network(NGN)

Position:Fiber Optic & Cooper Cable Splicer

Date:November 5, 2007 to September 28, 2009

Duties and Responsibilities:

Fiber Optic Cable Splicer

Cooper Cable Splicer

Installation of Areal and Underground Cables

Construction Line Works

Pole Erection and Accessories Attachment

Surveying and Design of Panel Location

Panel Termination and Troubleshooting

Installation of Unit to the new costumer

Replace and Install of Telephone Unit

Costumer Assessments

SUMMARY OF QUALIFICATIONS

Over 7 years experienced in Instrumentation And Control works

Over 3 years experienced in Telephone and Communication works

Instrument Technician

Fiber Optic cable Splicer

Low Current Technician

Can read and understand electrical plan.

Can troubleshoot and repair electrical equipments.

Knowledgeable in wiring and installation of electrical fixtures.

Can do rough-in installation of electrical works such as cable trays, ladders and bus duct lay out.

Knowledgeable of termination on electrical equipment such as switchgear,transformer, generators and motor controls.

Can troubleshoot and repair telephone system and fire alarm system.

Can maintain Building Management System

Can troubleshoot and repair motor controls

Can handle subordinates and schedule workloads.

With strong interpersonal skills and outstanding work ethics and capable to function across all discipline at every level and can work independently with minimum supervision.

EDUCATIONAL ATTAINMENT

College: Oroquieta Agro Industrial School (OAIS)

Course: Electronics Technology

Year: 2004-2006

Secondary: Molave Vocational Technical School (MVTS)

Course: Electronics Technology

Year: 1997-2001

Primary: Esperanza Elementary School

Year: 1991-1997

Name of Company: CHANGWON CORPORATION (HYUNDAI PROJECT)

Project: UZBEKISTAN Construction of CPF Complex and Development of Kandym Group of fields. Oil and Gas Processing Plant.

Position: Instrument Technician (Termination/Loop test)

•Date: February 14,2017 to March 03, 2018

Duties and Responsibilities:

Termination of control cable

Termination of power cable

Fiber optic cable splicing for DI/DO

MOV /SDV/PV/TV Termination

LIT/FIT/PIT/PDIT Termination

IRP/Inverter and converter termination

Instrument termination

Instrument installation

Instrument calibration

Instrument loop check

Paper works

Testing and commissioning

Vendor Assessment

Name of Company: CHANGWON CORPORATION (HYUNDAI PROJECT)

• Project: GRUPA AZOTY Polimery Police project Poland

• Position: Instrument Technician (Termination/Loop Test / Commissioning

• Date: May 8, 2021 to November 30, 2023

Duties and Responsibilities:

• Termination of Control Cable

• Termination of Power Cable

• Fiber Optic Cable Splicing

• LIT/FIT/PIT/PDIT Termination

• MOV/SDV/PV/TV/CV Termination

• IRP/Inverter and Converter Termination

• Instrument cable Termination

• Instrument Installation

• Instrument Calibration

• Instrument Loop Test/Check

• Testing and Commissioning

• Vendor Assessment



Contact this candidate