NOLIBERT ELIGAN
** ******* ******** **********, ****** +63-998*******, Email: ********@*****.***
PROFESSIONAL SUMMARY
Proficient in Electrical and Instrumentation Commissioning Engineer/Technician with more than [10] years of hands-on experience in commissioning, testing, preventive and corrective maintenance, loop checking, function test, calibration, troubleshooting and repair of electrical and instrumentation systems across various industrial sectors. Expertise in ensuring the successful installation, calibration, and operational performance of complex electrical, control, and instrumentation systems, including PLCs, SCADA, DCS, HMI, and field devices. Skilled in interpreting technical documentation such as P&IDs, control diagrams, schematic diagrams, blue print, and electrical schematics to ensure seamless project execution. Experience of MV/LV switchgear, MCC, Transformer, schneider, abb, siemens (VFD), schneider and AEG (UPS and Inverter) electric motors, Alstom Alspa P329 (DCS), motorized actuators (MOV), like limitorque, Bernard, rotorque, auma, pneumatic actuators, Siemens sipart PS2, pressure, flow, level transmitters, voltage and current transducer, addressable fire alarm system, Temperature Sensors,
(RTD, PTC, TE,) pH and conductivity analyzers, land flow gas monitoring, PI, (polarity index test). Strong communicator, able to work collaboratively with clients, project teams, and vendors work experience mainly in power plant industry and water treatment plant.
WORK EXPERIENCE:
Period 08, August 2023 up to 15, December 2024
Position Operation Maintenance Electrical Supervisor / Commissioning.
Company First Aqua / First Balfour and Ted Aqua.
Address Pakil Laguna Philippines.
Project Water Treatment and Waste Water Plant 50 million Liter per Day.
• Supervise and manage the daily operation and maintenance of electrical systems and equipment. Electric Motors, Submersible Pumps, Schneider VFD, Rotork and Bernard (MOV), Inverter and UPS, MCC Cabinets, Insulated MV Switchgear 13.8KV, Schneider LV Switchgears 460Volts, Two units Standby Generators Cummins 2500KV/2000KW, Power Factor Corrector, Transformers 1500KVA 13.2KV / 460Volts.
• Oversee a team of electrical technicians or engineers, ensuring they perform maintenance and repairs efficiently.
• Ensure that electrical equipment is operating within safety standards and regulations.
• Troubleshoot and Repair resolve electrical faults or malfunctions.
• Perform routine inspections of electrical systems, including transformers, generators, switchgear, and other power distribution equipment.
• Coordinate preventive maintenance schedules to ensure reliability and prevent system failures. Manage and monitor the availability of spare parts, tools, and other resources necessary for maintenance activities.
• Ensure that all electrical systems are correctly installed, tested, and operational per the design specifications.
• Proficient in using testing and calibration equipment for electrical systems (multimeters, insulation testers (Megger), clamp meter, vibration meter, pH. tester, tachometer, rotation tester, loop calibrator, power analyzers, etc.).
• Ensure compliance with local, as well as industry best practices for electrical maintenance.
• In-depth knowledge of electrical systems, circuits, and equipment.
Period 15, May 2017 to 31, May 2020
Position Pre and Start-up Electrical Commissioning Engr.
Company Black and Veatch International Company.
Address Duyen Hai 3 Tra Vinh Province Vietnam.
Project Extension Project 688 MW, Supercritical Coal Fired Power Plant Project.
• Ensure all design documentation, drawings, and technical specifications are complete and up-to-date. Verify the electrical systems are installed according to approved design and safety standards. Review equipment manuals and test procedures to confirm compliance with operational requirements.
• Perform detailed inspections of electrical equipment (transformers, circuit breakers, motors, generators, switchgear, etc.) to ensure they are correctly installed. Ensure electrical connections are properly tightened and that all components are free of damage and defects.
• Check grounding and bonding systems for correct installation and continuity. Verify cable insulations, Insulation’s resistance test and Earth continuity checks.
• Perform continuity tests on cables and wiring before energizing. Verify the functionality of control systems, protection systems, and interlocks Perform pre-energization checks to ensure everything is ready for power-up.
• Perform safety assessments to ensure all hazards are identified, and proper precautions are in place before energization. Ensure that safety systems such as lockout/tagout (LOTO), arc flash protection, and PPE (personal protective equipment) are available.
• Perform the energization of electrical equipment according to approved procedures and in phases if required. Start-up and test transformers, motors, generators, and other critical electrical equipment to ensure proper operation. Monitor closely for any signs of malfunction, overheating, or abnormal behavior during initial start-up.
• Perform functional testing of all electrical equipment to ensure proper operation (e.g., protection relay settings, circuit breaker trips, motor startup tests rotation check and solo run test, coupled run test), Verify the operation of protection systems, including overcurrent, earth fault, differential, and other protective relays. Identify and resolve any electrical issues that arise during start-up, such as faults in wiring, failures in control systems.
• Ensure that all commissioning data is accurately recorded and maintained for future reference commissioning test report. documentation of the commissioning process, including test results, equipment checklists,
• Proficient in using testing and calibration equipment for electrical systems (multimeters, insulation testers (Megger), clamp meter, vibration meter, pH. tester, tachometer, rotation tester, loop calibrator, power analyzers, etc.).
• Perform Pre-Commissioning, Commissioning, Start-up Commissioning. Balance of Plant (BOP), Water Treatment Plant and Waste Water Plant, Coal Handling System, Coal Ship Unloader, Coal Stacker Reclaimer, Coal Crusher, Conveyor system.
Period 29, January 2014 to 26, July 2015
Position Pre and Start-up Electrical Commissioning Engr.
Company Black and Veatch International Company.
Address Binugao Toril. Davao City Philippines.
Project 2x150 MW Coal Fired Power Plant, Therma South Energy Project.
• Ensure all design documentation, drawings, and technical specifications are complete and up-to-date. Verify the electrical systems are installed according to approved design and safety standards. Review equipment manuals and test procedures to confirm compliance with operational requirements.
• Perform detailed inspections of electrical equipment (transformers, circuit breakers, motors, generators, switchgear, etc.) to ensure they are correctly installed. Ensure electrical connections are properly tightened and that all components are free of damage and defects.
• Check grounding and bonding systems for correct installation and continuity. Verify cable insulations, Insulation’s resistance test and Earth continuity checks and equipment with tagging and labeling for easy tracking during commissioning.
• Perform continuity tests on cables and wiring before energizing. Verify the functionality of control systems, protection systems, and interlocks Perform pre-energization checks to ensure everything is ready for power-up.
• Perform safety assessments to ensure all hazards are identified, and proper precautions are in place before energization. Ensure that safety systems such as lockout/tagout (LOTO), arc flash protection, and PPE (personal protective equipment) are available.
• Perform the energization of electrical equipment according to approved procedures and in phases if required. Start-up and test transformers, motors, generators, and other critical electrical equipment to ensure proper operation. Monitor closely for any signs of malfunction, overheating, or abnormal behavior during initial start-up.
• Perform functional testing of all electrical equipment to ensure proper operation (e.g., protection relay settings, circuit breaker trips, motor startup tests rotation check and solo run test, coupled run test), Verify the operation of protection systems, including overcurrent, earth fault, differential, and other protective relays. Identify and resolve any electrical issues that arise during start-up, such as faults in wiring, failures in control systems.
• Ensure that all commissioning data is accurately recorded and maintained for future reference commissioning test report. documentation of the commissioning process, including test results, equipment checklists,
• Proficient in using testing and calibration equipment for electrical systems (multimeters, insulation testers (Megger), clamp meter, vibration meter, pH. tester, tachometer, rotation tester, loop calibrator, power analyzers, etc.).
• Perform Pre-Commissioning, Commissioning, Start-up Commissioning. Balance of Plant (BOP), Water Treatment Plant and Waste Water Plant, Coal Handling System, Coal Ship Unloader, Coal Stacker Reclaimer, Coal Crusher, Conveyor.
Period 06, October 2013 to 20, November 2013
Position Electrical Commissioning Engr.
Company YTL Power Services Bhd / Siemens.
Address Kerteh Malaysia Sdn.
Project Petronas Gas Berhad UENICS CUF Kerteh Project.
• Testing and Commissioning rewiring of new protection relay retrofitting.
Period 26, April 2013 to 24, June 2013
Position Electrical Commissioning Engr.
Company YTL Power Services Sdn Bhd / Samsung CT.
Address Jurong Island Singapore.
Project GMR Energy 2x400 MW Combined Cycle Power Plant (CCPP) Project.
• Perform commissioning activities, an inspection of the equipment installation is carried out to verify that all electrical systems and devices are installed as per design specifications. This includes ensuring proper wiring, grounding, and installation of protection systems identifies all systems, circuits, and equipment with tagging and labeling for easy tracking during commissioning.
• Perform testing individual components such as MCC, MOV, switchgear, transformers, electric motors, cooling pumps, cables, and control circuits to ensure they are correctly installed and functioning. This may include insulation resistance tests and continuity check, loop checking, verifying set points, and ensuring the protection systems can detect and respond to faults in the system.
• Perform electrical wiring checked continuity, and control circuits are verified. This ensures that all the electrical connections are correct and that there are no faulty connections.
• Implement safety protocols must be followed at all times, including lockout/tagout procedures, personal protective equipment (PPE), and hazard identification.
• Proficient in using testing and calibration equipment for electrical systems (multimeters, insulation testers (Megger), clamp meter, vibration meter, pH. tester, tachometer, rotation tester, loop calibrator, power analyzers, etc.).
• Measure starting current, inrush current, and steady-state current to confirm the motor performs optimally.
• Provides a detailed test results record of what has been tested, what equipment was used.
Period 22, February 2012 to 30, April 2013.
Position Electrical Commissioning Electrical Building Nuclear Island.
Company Areva Nuclear Power.
Address Finland -27160 Olkiluoto.
Project OL3 1600 MW European Pressurized Reactor (EPR) Nuclear Power Plant. Startup Pre-Commissioning and Commissioning in Nuclear Island Division 1, 2, 3 & 4 Electrical Systems.
• Perform commissioning activities, an inspection of the equipment installation is carried out to verify that all electrical systems and devices are installed as per design specifications. This includes ensuring proper wiring, grounding, and installation of protection systems identifies all systems, circuits, and equipment with tagging and labeling for easy tracking during commissioning.
• Perform testing individual components such as MCC, MOV, switchgear, transformers, electric motors, cooling pumps, cables, and control circuits to ensure they are correctly installed and functioning. This may include insulation resistance tests and continuity check, loop checking, verifying set points, and ensuring the protection systems can detect and respond to faults in the system. verify voltage and frequency against rated specifications.
• Measure voltage and current during motor start-up and ensure motors are running within safe operational limits
• Verify the correct operation of circuit breakers for various conditions, including overcurrent, undervoltage, and fault conditions breaker tripping test, including timing tests, to ensure breakers operate correctly in response to faults.
• Perform safety interlocks ensure that certain conditions must be met before the motor can be started emergency stop functions work as expected and that the system will shut down safely in case of emergency.
• Measure starting current, inrush current, and steady-state current to confirm the motor performs optimally.
• Proficient in using testing and calibration equipment for electrical systems (multimeters, insulation testers (Megger), clamp meter, vibration meter, pH. tester, tachometer, rotation tester, loop calibrator, power analyzers, etc.).
• Perform electrical wiring checked continuity, and control circuits are verified. This ensures that all the electrical connections are correct and that there are no faulty connections.
• Implement safety protocols must be followed at all times, including lockout/tagout procedures, personal protective equipment (PPE), and hazard identification.
• Provides a detailed test results record of what has been tested, what equipment was used.
• Perform all tests pass and are documented accurately a final testing report and sign-off for the MCC system's readiness for operational use.
Period 07, February 2011 to 22, June 2011
Position Electrical & Control Instrument Commissioning Technician.
Company Black and Veatch International Company.
Address Tanjung Jati Jepara Indonesia.
Project 2x660 MW Coal Fired Power Plant Unit 3&4 Project.
• Assist in the installation of electrical and control equipment such as motors, switchgear, MCC, MOV, Valves, control valve, transformers, control panels, instrumentation, and wiring proper orientation of instruments and electrical components according to design specifications and drawings.
• Perform loop checks to confirm that control circuits and field devices (such as instruments and valves) are correctly wired and configured, calibration and verification of instrumentation such as flow meters, temperature sensors, pressure transducers, and level transmitters.
• Verify control systems, such as PLC (Programmable Logic Controllers), DCS (Distributed Control Systems), and SCADA (Supervisory Control and Data Acquisition) systems, are properly receiving signals from the field instruments and can control the process as required.
• Perform testing, troubleshooting, repair and commissioning electrical systems, control systems, and instrumentation.
• Proficient in using testing and calibration equipment for electrical systems (multimeters, insulation testers (Megger), clamp meter, vibration meter, pH. tester, tachometer, rotation tester, loop calibrator, power analyzers, etc.).
• Follow strict safety procedures and guidelines during commissioning activities, including electrical safety, lock-out/tag- out (LOTO) procedures, and hazard analysis.
• Document the commissioning activities and create detailed reports, including test results, calibration data.
Period 04, January 2010 to 15, May 210
Position Electrical & Control Instrument Commissioning Technician.
Company Doosan Heavy Industries.
Address Cebu Philippines.
Project 2x103 MW Coal Fired Power Plant Project.
• Assist in the installation of electrical and control equipment such as motors, switchgear, MCC, MOV, Valves, control valve, transformers, control panels, instrumentation, and wiring proper orientation of instruments and electrical components according to design specifications and drawings.
• Perform loop checks to confirm that control circuits and field devices (such as instruments and valves) are correctly wired and configured, calibration and verification of instrumentation such as flow meters, temperature sensors, pressure transducers, and level transmitters.
• Verify control systems, such as PLC (Programmable Logic Controllers), DCS (Distributed Control Systems), and SCADA (Supervisory Control and Data Acquisition) systems, are properly receiving signals from the field instruments and can control the process as required.
• Perform testing, troubleshooting, repair and commissioning electrical systems, control systems, and instrumentation.
• Proficient in using testing and calibration equipment for electrical systems (multimeters, insulation testers (Megger), clamp meter, vibration meter, pH. tester, tachometer, rotation tester, loop calibrator, power analyzers, etc.).
• Follow strict safety procedures and guidelines during commissioning activities, including electrical safety, lock-out/tag- out (LOTO) procedures, and hazard analysis.
• Document the commissioning activities and create detailed reports, including test results, calibration data.
• Period 12, March 2008 to 30, January 2009
Position Chief Electrician.
Company WJ Ground Water Limited.
Address Dubai, UAE.
Project Dewatering Project.
• Oversee the design and implementation of electrical systems, including power supply lines, distribution panels, motor control centers (MCCs), and dewatering pump systems. electrical load is correctly calculated based on the power requirements of the dewatering, pumps, compressors, and other equipment.
• Supervise and ensure the proper installation of electrical systems, including wiring, cabling, control panels, dewatering pumps, submersible pumps, and power standby generators, distribution systems.
• Perform commissioning of electrical installations, including circuits, motors, and control systems, ensuring everything operates as intended before the system is brought online. regular inspections and preventive maintenance of electrical systems to ensure reliability and minimize downtime of dewatering equipment.
• Implement LOTO procedures during maintenance work to prevent accidental electrical shock or equipment activation
• Manage and lead a team of electricians and technicians, providing guidance and training to ensure the team works efficiently and safely.
• Prepare and maintain electrical drawings, wiring diagrams, and schematics for all electrical systems used in the dewatering project, daily logs of work completed, equipment inspections, electrical faults, and corrective actions taken.
• Proficient in using testing and calibration equipment for electrical systems (multimeters, insulation testers (Megger), clamp meter, vibration meter, pH. tester, tachometer, rotation tester, loop calibrator, power analyzers, etc.).
• Strong leadership and team management skills to supervise and mentor electrical technicians.
Period July, 2007 to October, 2007
Position Electrical Supervisor.
Company Alstom Japan KK.
Address Villanueva Cagayan de Oro City, Philippines.
Project 2x205 MW Coal fired Plant, Power Shutdown Project.
• In charge in all modification, commissioning troubleshooting and repair work as per required by Alstom designers handling manpower tools equipment, PTW to execute daily schedules and progress to meet the deadline before the plant re- started, replacements of bearings for mixers and hydrators, initiate installations of additional machine and process line troubleshooting and implement corrective action to avoid recurrence of the problem, Practice of working safely in carry out his duties and responsibilities.
Period 02, February 2003 to May, 2006
Position Cellphone Technician / Trainor.
Company Celtecs Cellphone Repair Training Center.
Address Lingayen, Philippines.
Sole owner.
• Engage of mobile phone repair through software and hardware troubleshooting Conduct proper hands-on training and develop new skills.
Period 10, May 2001 to 14, December 2002
Position Control & Instrument Commissioning Technician (BOPM).
Company Alstom Power Plants Services Ltd.
Address Hoping Taiwan R.O.C.
Project 2x660 MW Coal Fired Power Plant Project.
• Assist in the installation of electrical and control equipment such as motors, switchgear, MCC, MOV, Valves, control valve, transformers, control panels, instrumentation, and wiring proper orientation of instruments and electrical components according to design specifications and drawings.
• Perform loop checks to confirm that control circuits and field devices (such as instruments and valves) are correctly wired and configured, calibration and verification of instrumentation such as flow meters, temperature sensors, pressure transducers, and level transmitters.
• Verify control systems, such as PLC (Programmable Logic Controllers), DCS (Distributed Control Systems), and SCADA (Supervisory Control and Data Acquisition) systems, are properly receiving signals from the field instruments and can control the process as required.
• Perform testing, troubleshooting, repair and commissioning electrical systems, control systems, and instrumentation.
• Proficient in using testing and calibration equipment for electrical systems (multimeters, insulation testers (Megger), clamp meter, vibration meter, pH. tester, tachometer, rotation tester, loop calibrator, power analyzers, etc.).
• Follow strict safety procedures and guidelines during commissioning activities, including electrical safety, lock-out/tag- out (LOTO) procedures, and hazard analysis.
• Document the commissioning activities and create detailed reports, including test results, calibration data.
Period 15, June 1998 to 09, May 2001
Position Control & Instrument Commissioning Technician (BOPM).
Company Alstom Power Plants Services Ltd.
Address Sual Power Station Brgy. Pangascasan Sual Pangasinan.
Project 2x660 MW Coal Fired Power Plant Project.
• Assist in the installation of electrical and control equipment such as motors, switchgear, MCC, MOV, Valves, control valve, transformers, control panels, instrumentation, and wiring proper orientation of instruments and electrical components according to design specifications and drawings.
• Perform loop checks to confirm that control circuits and field devices (such as instruments and valves) are correctly wired and configured, calibration and verification of instrumentation such as flow meters, temperature sensors, pressure transducers, and level transmitters.
• Verify control systems, such as PLC (Programmable Logic Controllers), DCS (Distributed Control Systems), and SCADA (Supervisory Control and Data Acquisition) systems, are properly receiving signals from the field instruments and can control the process as required.
• Perform testing, troubleshooting, repair and commissioning electrical systems, control systems, and instrumentation.
• Proficient in using testing and calibration equipment for electrical systems (multimeters, insulation testers (Megger), clamp meter, vibration meter, pH. tester, tachometer, rotation tester, loop calibrator, power analyzers, etc.).
• Follow strict safety procedures and guidelines during commissioning activities, including electrical safety, lock-out/tag- out (LOTO) procedures, and hazard analysis.
• Document the commissioning activities and create detailed reports, including test results, calibration data.
Period 21 July 1997 to 26 May 1998
Position Electrical Lead Man / Sub Con.
Company Ecco Asia.
Address Sual Power Station Brgy. Pangascasan Sual Pangasinan.
Project 2x660 MW Coal Fired Power Plant Project.
• Perform Cable tray layout, MCC, switchgear, installation, and instrument cable termination.
Period 08 April 1997 to 21 July 1997
Position Electrician 3.
Company GEC Alstom.
Address Sual Power Station Brgy. Pangascasan Sual Pangasinan.
Project 2x660 MW Coal Fired Power Plant Project.
• Perform Cable tray layout, MCC, switchgear, installation, and instrument cable termination.
Period 01 October 1996 to 07 April 1997
Position Electrical Technician.
Company Southern Company & Construction.
Address Sual Power Station Brgy. Pangascasan Sual Pangasinan.
Project 2x660 MW Coal Fired Power Plant Project.
• Perform Installing various electrical devices such as outlets, circuit breakers, and lighting systems, motor control, magnetic contactor, electric motor, troubleshooting and repair electrical issues in equipment or wiring, such as faulty circuits, short circuits, or malfunctioning machinery.
• Proficiency in understanding electrical systems, motors, PLCs, control circuits, and troubleshooting techniques, implement safety procedures like Lockout/Tagout when working on electrical systems to prevent accidental energization.
• Maintaining power generation and distribution equipment. ensuring the electrical systems of machinery and production lines are functioning correctly.
• Proficient reading blueprints, schematic diagram. reports and logging all maintenance and repairs performed, and adheres to safety standards.
Period 01 July 1994 to 16 September 1994.
Position Industrial Electrician.
Company MCEI Asphalt Plant and Crusher.
Address Binalonan, Pangasinan Philippines.
Project Asphalt Plant and Crusher.
• Perform preventive corrective maintenance of control and instrument and electrical system, Electric Motor rewinding single phase three phase induction motor 230/430volts, install and wire control panels, electrical distribution boards, and motor control centers (MCC), for industrial operations.
• Implement regular inspections of electrical equipment and systems (motors, transformers, generators) to identify wear, malfunctions, or safety hazards.
• Perform preventive maintenance tasks like cleaning electrical equipment, tightening connections, lubricating motors, and replacing worn components, troubleshooting and repair and replace faulty electrical components, such as switches, relays, fuses, and circuit breakers, to restore systems to full functionality.
• Proficient in electrical blueprints, wiring diagrams, and circuit, schematics diagrams, understand the layout and operation of electrical systems. follow safety protocols to protect workers and the environment, including lockout/tagout (LOTO) procedures during equipment maintenance and repairs.
Period 25 January 1994 to 25 June 1994.
Position Production Operator.
Company Star Light Company.
Address Quezon City, Philippines.
Project Florescent and incandescent bulb.
• Perform vacuum fluorescent tube Viking, charging argon gas and mercury.
Period 23, January 1992 to 08, December 1993.
Position Industrial Electrician (OJT).
Company MCEI Asphalt Plant and Crusher.
Address Binalonan, Pangasinan Philippines.
Project Asphalt Plant and Crusher.
• Perform preventive corrective maintenance of control and instrument and electrical system, Electric Motor rewinding single phase three phase induction motor 230/430volts, install and wire control panels, electrical distribution boards, and motor control centers (MCC), for industrial operations.
• Implement regular inspections of electrical equipment and systems (motors, transformers, generators) to identify wear, malfunctions, or safety hazards.
• Perform preventive maintenance tasks like cleaning electrical equipment, tightening connections, lubricating motors, and replacing worn components, troubleshooting and repair and replace faulty electrical components, such as switches, relays, fuses, and circuit breakers, to restore systems to full functionality.
• Proficient in electrical blueprints, wiring diagrams, and circuit, schematics diagrams, understand the layout and operation of electrical systems. follow safety protocols to protect workers and the environment, including lockout/tagout (LOTO) procedures during equipment maintenance and repairs. EDUCATION:
ELECTRICAL TECHNOLOGY TWO YEARS COURSE S.Y. April 1990-March 1992 Pangasinan School of Arts and Trade Lingayen, Philippines.
COURSE: SPECIALIZED IN ELECTRICAL TECHNOLOGY
EDUCATION AND TRAINING RECORDS:
1. Zeversolar Training.
Jiangsu Zeversolar Solar New Energy Co., Ltd.
Quezon City, Philippines. August, 2015
1. Basic Technology of PV system and PV inverter.
2. Introduction of Zeversolar string inverters.
3. Monitoring solution for residential and commercial application. 4. Inverter selection and PV system design.
5. Inverter installation, commissioning, daily maintenance and troubleshooting. 2. Click Safety.
G3 NFPA 70E for Managers and Electricians 2015.
Serial Number: 13722467 Completed. June, 3 2015
3. Safety at Electrical Work SFS6002 Training.
Winnova Electrical and Automation Technology.
Pori Finland, Ulasoorinatie. February, 2012
4. Occupational Safety Card Training.
Hotel Cumulus, Rauma Finland. March, 2012
5. Construction (OSHA) 10-hour Outreach Program.
2x660MW Coal Fired Power Plant Unit 3&4.
Tanjung Jati, Japara Indonesia. March, 17-23-24 2011 6. 2008 Submersible Motor Workshop.
Practical & Theoretical Submersible Motor Workshop and Application, Installation, Maintenance. Franklin Tech. Training Center, Wittlich Germany. November, 3-7 2008 7. R3 Fire Detection System Network.
Sual Coal Fired Power Plant, Philippines. September, 1 1999 8. Gas Monitoring Land Combustion Flue.
Sual Coal Fired Power Plant, Philippines. October, 1999 SKILLS:
1. Commissioning of electrical and instrumentation systems, including control panels, field instruments, electrical circuits, and