PROFESSIONAL SUMMARY

PMP-Certified Project Manager with 33 years of experience in Industrial projects.

EDUCATION & CERTIFICATIONS

•May-1988, The University of Texas at Austin, BSME

•Aug-1988, Intergraph Basic 2D Training Cert

•Oct-1988, North American Mfg. Co, Combustion Technology Seminar

•May-1991, Principles of CPM/ Basic Primavera

•Jun-1991, OSHA 10-Hour Course

•Jun-1991, H.B. Zachry Quality Management Training

•Jun-1991, H.B. Zachry Cost Projections & Reporting Course

•Jul-1991, H.B. Zachry Supervisory Training II

•Nov-1995, Fluor Daniel PDS Equipment & Piping Modeling Course

•Oct-1997, Intergraph HVAC-3D Modelling

•Sep-1998, Fluor Daniel Safety Leadership Training

•Jun-2008, Saudi Aramco Estimating PMT-102

•Jul-2011, Saudi Aramco Risk Assessment Training PMT-214

•Nov-2011, Saudi Aramco Industrial Hygiene Training

•Nov-2011, PMP Certification# 1470205, Current thru Nov-2026

•Jul-2020, Zachry Industrial Fall Protection Training

•Jul-2020, ExxonMobil GCGV Site Hazard Awareness Training

•Apr-2023, Contractors Safety Council - Asbestos Awareness Training, Benzene Training, Safe Work Practices, Safety Lead Training, FHR Site Specific Training, Alkylation Area Training, Hydrogen Sulfide Training

•Apr-2023, Contractors Safety Council – U.S. Coast Guard- Maritime Security Training

•May-2023, Transportation Security Administration- TWIC Credential, current to May 2028

TECHNCIAL SKILLS SUMMARY

Software: ACCE, Microsoft Project, MicroStation, AutoCAD and Primavera

Manufacturing/ Testing: Managed while Working for the Saudi Aramco, Technip USA and Fluor roles:

1.Large-scale Pipe Fabrication- Inspection and NDE

2.Weld Clearance/NDE and Pressure Testing of Industrial Piping Systems

3.Precommissioning of Piping Systems- Hydrotest, Pneumatic Test, Steam & Air Blows, Chemical Cleaning

4.New fabrication - Factory Acceptance Testing FAT

5.Field Installation of Rotating Machinery, Precommissioning and SAT

6.On-site modification of Rotating Machinery and Site Acceptance Testing- SAT

7.Shop Fabrication and Field Erection of Fired Heaters and Boilers- NDE, SAT

8.Shop Fabrication and Field Erection of Gas Scrubbers- NDE, SAT

9.Field Installation and Pre-commissioning of Gas Turbines- SAT

10.Continuity testing/Loop Checks on I&C cable

11.Megger Testing and Hi-Pot Testing of medium to high voltage Power Cables

PROFESSIONAL WORK HISTORY

Senior Project Manager, CPS (Contract), Feb 2024 to Mar 2024

Worked with Operations and Maintenance, to evaluate Small-Cap Scopes. Evaluated Contracting Strategies for a portfolio of expansion, and upgrade proposals from Stakeholders.

Senior Estimator, Flint Hills Resources (Contract), Mar 2023 to Jul 2023

Worked with Project and Construction Managers and Engineering Contractors to develop ROM, Budget and Detailed Estimates for multiple, small-cap brownfield projects within the Corpus Refinery. (Software ACCE, Microsoft Project)

QA/QC Engineer, ExxonMobil (Contract), Jun 2020 to Jan 2021

GCGV Grassroots Petrochemicals Manufacturing Complex ($10BB), performed Inspection and Signature approval of welding, testing and torquing for critical systems.

Project Manager, Saudi Aramco, Oct 2007 to Apr 2020

Contracted Preliminary Engineering to Develop Funding Estimates for brownfield projects. Contracted EPC/EPCM projects selected for execution. Placed special focus on procurement of long-lead/engineered equipment. Man aged the development of ITP/s and associated activities:

•Replace Pressure Vessels - South Ghawar ~$20MM

•Upgrade Field Water Injection– Abqaiq ~$45MM

•Upgrade Water Injection and Water Disposal Systems - Abu Ali Plants $35MM

•Manifa Well Platforms, Flowlines and ESP’s ~$75MM

•Manifa Crude Gathering & Water Injection ~$60MM

•Upgrade Water Handling System - Hawiyah GOSP-3 ~$28MM

•Upgrade Oil & Oily Water and Recycle Systems - Southern Area GOSP’s ~$85MM

•Upgrade JGP Wastewater & Spent Caustic Systems ~$25MM

•Fuel Gas System Upgrade- Juay’mah Gas Plant ~$17MM

•Upgrade Auxiliary Equipment at Ras Tanura South Terminal ~$15MM

•Replace Control Systems, Crude Stabilizer & Sulfur Recovery, RTR ~$20MM

•Replace Heavy Lift Barge ARB-1 ~$350MM

•Improve Hydrocracker Reliability - Ras Tanura Refinery ~$65MM

•Install Boiler Economizer - Ras Tanura Refinery ~$15MM

•Upgrade Fire Protection System - Ras Tanura Refinery ~$90MM

•Cogeneration Interconnection Facilities - Ras Tanura Refinery ~$65MM

•Replace Process Analyzers - Ras Tanura Refinery ~$12MM

•Replace Substations 12 & 65 - Ras Tanura Refinery Tank Farm ~$45MM

•Install Hydrocracker Gas Scrubber - Ras Tanura Refinery ~$35MM

•Replace Emergency Steam Turbine Generators - Ras Tanura Refinery ~$80MM

•Install Sour Water Stripper - Ras Tanura Refinery ~ 35MM

•Remove Hg From NGL Condensate at Ras Tanura Refinery ~$14MM

•Replace Storage Tanks at Ras Tanura Refinery ~ $22MM

•Upgrade Industrial Drainage System at Ras Tanura Refinery ~$19MM

Senior Project Engineer, Technip USA, Sep 2006 to Oct 2007

Managed engineering on XOM Projects in Katy, resolved conflict with Pipe Fabricator in Pasadena, for a $20 Million Fab Order for the Freeport LNG Project, Developed the Indirect Estimate for the Gulf LNG Project. (Software- Primavera and MicroStation).

•ExxonMobil Umbrella Projects- FCC and Boiler Enhancements, Beaumont, TX ~$25MM

•Freeport LNG Regasification and Receiving Terminal, Quintana Island, TX~$875MM

•Gulf LNG Clean Energy Project- LNG Receiving Terminal, Pascagoula, MS ~950MM

Project Estimator, CCC Group Inc, Apr 2004 to Aug 2006

Evaluated all bid deliverables, performed all Take-offs, worked with customer for scope clarifications, identified scope appropriate for sub-contracts, prepared execution schedules, compiled all direct costs, participated in risk management with executives to achieve a Final Bid Proposals. (Software- WinEst/Trimble, Primavera)

•LCRA De-Aerator Replacement Project, Bastrop, TX, Project Value: $340,000

•LCRA Condensate Polisher System Project, La Grange, TX Project Value: $365,000

•LCRA FWDS Improvement Project, Bastrop, TX, Project Value: 200,000 USD

•LCRA FWDS Improvement Project II, Bastrop, TX, Project Value: 120,000 USD

•US SUGAR Turbine Structure-7 Project, Clewiston, FL, Project Value: $650,000

•US SUGAR West Pipe Rack Project, Clewiston, Florida. Project Value: $450,000

•SYNSIL LRO12006A Structural/Mechanical Project, Cleburne, TX, Project Value: $3,100,000

•TITANIUM METALS CORP- Cooling Tower Package, Henderson, NV, Project Value: $730,000

•TITANIUM METALS CORP- VDP Furnace Package, Henderson, NV, Project Value: $4,500,000

•ABC COKE CORP- VDCS Emissions Package, Birmingham, AL, Project Value: $2,500,000

Project Engineer/ Construction Superintendent, Fluor Corp- May 1992 to Mar-2004

Performed 3D modelling with MicroStation and Intergraph PDS, and site engineering when required. Made routine field verifications of progress. Worked with Contractors to optimize Quality and Safety, and to prioritize completions as per Operations start-up sequence. (Software- Intergraph PDS, MicroStation, AutoCAD, Primavera).

•Jubail-United Petrochemicals Complex, Utilities & Offsite Jubail, Saudi Arabia ~$750MM

•CITGO Crude Unit Fire Rebuild Project, Lemont, Illinois ~$25MM

•Yanpet Expansion Project, Ethylene Glycol Unit, Yanbu Al-Sinaiyah, Saudi Arabia ~$350MM

•Yanpet Expansion Project, Utilities & Offsite Areas, Yanbu Al-Sinaiyah, Saudi Arabia ~$675MM

•Kodak Offshore Projects 6 (Classified) ~$450MM

•DuPont Cooper River Y1 Restart Project, Charleston SC ~$15MM

•Alcan Rolled Metal Products Co. - Recycle Project, Oswego, NY ~$165MM

•DuPont Qingdao Nylon-66 Project, Beijing China ~$325MM

•Milliken- Live Oak Rebuild Project, La Grange GA ~$225MM

•DuPont- Spruance Xytel Project, Richmond VA ~10MM

Construction Engineer, H.B. Zachry Company, Apr-1990 to Mar-1992

Monitored and verified progress, resolved design conflicts, and performed field-design for drainage systems that were left out of the detail design package:

•AES Cedar Bay Cogen Project. Construction Engineer ~$275MM

Construction Engineer, The M.W. Kellogg Company, Jul-1988 to Mar-1990

•Westlake Polymers Ethylene Project, Lake Charles, LA. ~$350MM

•Lyondell Butadiene Recovery Project, Channelview, TX. ~$125MM

•Shell D.P.M.C. Olefins Plant II- Furnace Addition, Deer Park, TX. ~75MM

•Pequiven Olefins Plant Expansion Phase 1- Maracaibo, Venezuela. ~12MM

•Finaneste Ethylene Project- (Houston Office Engineering)

•Westlake Polymers Ethylene Project- (Houston Office Engineering)



Contact this candidate