CURRICULUM VITAE
PERSONAL DETALS:
Full Name: HOANG DUY MAN
Date of Birth: 10th Feb 1968
Address: Hai Phu Commune, Bo Trach District, Quang Binh Province Status: Married
Gender: Male
Nationality: Vietnamese
Email address: ***********@*****.***
Mobile phone: +84.975728951
Application for Position: Engineering engineer
QUALIFICATIONS:
Mechanical Engineering Degree Graduated from NHA TRANG University, Vietnam.
Good English Skill.
Efficient in using AutoCAD (2D & 3D) CADWORX Plant, AutoCAD Plant, MS Office, NAVISWORK.
HIGHLIGHTS:
Over 25 experience years working for Refinery Project/Oil & Gas field
Able to work under high pressure and target/ dead-line driven, enthusiastic and observant individual
Behave naturally and calmly even in difficult situations.
Proficient using of API, ASME, AWS, ASTM standards. DETAILED PROFESSIONAL EXPERIENCE:
2017– NOW: TRUONG MANH SERVICES ENGINEERING COMPANY LIMITED.
Project: MOPUB PRODUCTION FLATFORM-PERENCO GABON PROJECT - FRIEDLANDER
Project: EOF - SECTEUR GRONDIN / PLTF BAM- PERENCO GABON- FRIEDLANDER
Project: EOF - SECTEUR GRONDIN / PLTF -MAM PERENCO GABON- FRIEDLANDER
Project: OFFSHORE PROJECT - ZULUF- PTSC POS
Project: Offshore Wind Power Generation Phase II – T&I for FOU OSS and SMC Position: Piping and Structure Engineer
Layout and 3D modeling, modified steel structure and piping system.
Isometric, piping support drawing
Prepare shop drawing, NDT map, welding Map, cutting plan for Steel Structure/ piping fabrication
Make MTO
Project: TAN PHU DONG 1 WIND PLANT – PC1
Position: Structure Engineer
Prepare 3D Modeling of Tower, Outfitting.
Prepare Shop Drawing, Cutting Plan
Project: OL1-HYOSUNG
Position: Piping Engineer
Lay out and Modeling Piping system, Check Piping clashing
Produce isometric, piping support drawing
Make Material Take Off
Control piping installation at site
2015-2016: VINA OFFSHORE ENGINEERING CO., LTD
Project: CIP Skid & Membrane Sulfate Removal Unit (SRU) Skid for P76 FPSO Petrobras Project, Brazil- Client: Veolia Water Solution Westgarth Company Ltd. – Scotland
Position: Structure Engineer
Review specification follow code and standard
Prepare 3D Modeling of Skid.
Prepare Shop Drawing, Cutting Plan for Fabrication
2011 – 2014: PETROVIETNAM MARINE SHIPYARD JOINT STOCK COMPANY.
Project: JACK-UP RIG –TAM DAO 03 &05
Position: Piping and Structure Engineer
Lay out and 3D modeling, Piping, Steel Structure, Check Piping clashing
Produce Shop Drawing from Detail Drawing
Produce isometric, piping support drawing
Prepare shop drawing, cutting plant for Steel Structure/ piping fabrication
Line check and close Punch list
Prepare Hydro Test packages and Pre commissioning
Followed up and closed out non-conformance issues. Ensure all punch list items
2008 – 2011: VINA OFFSHORE ENGINEERING CO., LTD.
Project: Offshore site survey, issue engineering isometric drawings, onshore fabrication, offshore Hook-up & Commissioning of Flow Lines such as Process Liquid lines, Gas-lift lines & Water Injection lines on Sutuden & Sutuden NE Well Head Platforms-Client: CUU LONG JOINT OPERATING COMPANY (CLJOC),
Onshore fabrication, offshore Hook-up & Commissioning of Flow Lines such as Process Liquid lines, Gas-lift lines & Water Injection lines on Rang Dong Well Head Platforms-Japan Vietnam Petroleum Company Ltd (JVPC)
Fabrication, loading out and sea-fastening of Subsea Tie-in Pipe spools for Ruby II FPSO Project-SWG OFFSHORE INTERNALTIONAL PTE LTD.
Offshore site survey, onshore fabrication, offshore Hook-up & Commissioning of Flow Lines on Rong Doi Well Head Platform-KOREA NATIONAL OIL CORPORATION COMPANY LTD (KNOC).
Position: Piping and Structure Engineer
Review specification piping system follow code and standard
Lay out and modeling modified Steel Structure, Piping system.
Produce Shop Drawing from Detail Drawing
Produce piping isometric, support drawing
Prepare shop drawing, cutting plant for Steel Structure/ piping fabrication
2006-2008: LILAMA -18
Project: BINH SON REFINERY-BSR
Position: Piping/ Mechanical supervisor
Prepare Method Statement of fabrication and Erection for Piping Steel Structure and Equipment
Make detail plan for Piping construction, steel structure, Equipment
Supervise installation of piping, Tank, steel structure
2004-2006: Project: SONG GIANH CEMENT PLANT
Position: Mechanical Engineer
Manage project subcontract Construction
Close Punch list, Pre commissioning
1997-2004: VIETUBES CORPORATION LIMITED.
Position: Mechanical Engineer
Implement CNC Program for piping cutting threaded pipe.
Manage Operation of all machinery at workshop