Dipak Kumar
Cell: +1-780-***-****
Phone: +1-780-***-****
E-mail: ******@*****.***,
Address: **** ** ****** **, ********, AB
Red seal Journeyman Millwright,
Maintenance Planner, B.Eng.
Diploma Mechanical Eng. Technician
MIT( member-in -training APEGA)
Rotating equipment specialist, competent professional with about 8 yrs. of experience in pre Commissioning, commissioning start-up and maintenance of static and rotating equipment in addition planning experience of 2 yrs. Focusing on NPI trade coordinator role, best matches with 3 years’ experience at Tli cho logistics working as facility maintainer.
Worked closely with operational department, maintenance personnel other trades and planners to effectively manage work order backlogs. And closely work with Technical Services Department to help analyze, identify, and develop remedial actions for equipment issues.
Maintenance planning and analysis in accordance with the company maintenance process standards.
Communication and coordination of the daily and weekly maintenance schedules. Reporting key maintenance performance indicators
Ensure all work is performed in a safe manner and that all work areas maintain or exceed all OHSC standards.
Reviewing engineering drawing, layouts, diagrams, technical specifications and tolerances.
Effective use of the yearly maintenance budget and strong awareness of cost controls.
Effecting preventative maintenance schedule of various kind of equipment to increase the equipment uptime/reliability and accomplishing project target.
Ensure all work is performed in a safe manner and that all work areas maintain or exceed all OHSC standards, carried out Field Level Hazard Assessment (FLHA), identify Environmental Health and Safety issues during Planning Stage and Include mitigation measures to the detailed plan Journeyman Millwright (Project) August 2024- present Flint Energy Services, Cenovus Foster creek
• Preventive and breakdown maintenance on Atlas copco and Boge air compressor GA7+, GA10, GA15, GA15+, GA22, GA22+, GA30, GA30+, GA35 etc.
• Cavity pump and Centrifugal pumps, removal repair and installation. Laser alignment.
• Vertical turbine pump busing, mechanical seal replacement, rigging etc Journeyman Millwright (Commissioning Project) Nov 2023- July 2024 Bula Millwright Services, LNG Kitimat
• Super core jet removal and installation.
• Turbine cooling water pumps, peristaltic diaphragm pumps gas check, pipe strain. Laser alignment and soft foot corrections.
• Vibration Monitoring using Vibration pen and SCOUT 2201s vibration analyzer.
• Final commissioning and equipment hand over to client. Industrial Mechanic (Offshore Oil Rig) July 2023- October 2023 DAWCO Construction Enterprises Inc., St. Johns NL (Tera Nova)
• Remove and replaced PSVs on various equipment in plant.
• Removed and replaced pump, coupling and Laser alignment, pipe strain on Crude oil pump. PROFILE SUMMARY
EXPERIENCE
• Trained and qualified Basic Offshore Safety Induction & Emergency Training (including HUET)
Millwright (Facility Maintainer) May 2020- June2023 Tlicho Logistics, Lac-de Gras
• Preventive and Scheduled maintenances of air compressors air handling units etc.
• Remove and rebuilt progressive cavity pump, Vertical turbine pumps Mag Drive Preventive maintenance, break down and troubleshooting, Decommissioning and Installation of boiler
• Site wide dewatering and fixed assets maintenance
• Acting lead hand and worked & manage team of 12 personal and work orders
• Assisted in updating and maintain equipment task lists in SAP for future planning/estimating requirements,
• Identify parts, rentals and services required to do the job and initiate the ordering process
• Ordering parts from SAP, doing time sheets of personnel, and managing status of work orders.
• Assisted in developing job plans for rotating equipment related to schedule turnaround. Millwright (Shutdown) Feb 2020- March 2020
The Gisborne Group, Sparwood, BC.
• Installation of float cells units and Laser Alignment of float cell drive pulley using “Pulley Pro”
• Installation and Shimming of the Reflux Classifier unit, feeder liners, air ducting on float cell units.
• Commissioning of float cell unit main drive pulley alignment and torquing.
• Overhauling and replacement of the main feed water pump. Millwright (Shutdown) Sept. 2019- Nov. 2019
AECOM maintenance, Fort McMurray.
• Remove, Install and Laser Alignment head pulley high speed Coupling using “ROTALIGN”
• Inspection and overhauling of the grid coupling of main drive and greasing
• Remove and replace apron feeder liners, replacing conveyer various rollers eg. flat roller, v return
• Installation of breaker seal and breaker liners, Flushing of Lubrication system Millwright (Seasonal) June 2019- Sept. 2019
York Search group, Baffin land, NU.
• Winterisation of the ship loading equipment’s, conveyors and lubrication, greasing of conveyers, Tracking and Alignment of feeder hopper, Remove and replace feeder liners,
• Inspections, Preventive maintenance of conveyor rollers. Flat roller, v return etc.
• Troubleshooting and Inspection of metal detector, feeders and conveyor Millwright (Shutdown) April 2019- June 2019
AECOM maintenance, Fort McMurray.
• Remove, Install and Laser Alignment head pulley high speed Coupling
• Inspection and overhauling of the grid coupling of main drive and greasing
• Remove and replace apron feeder liners, replacing conveyer various rollers eg. flat roller, v return
• Installation of breaker seal and breaker liners, Flushing of Lubrication system Millwright (Shutdowns) Jan. 2019- May 2019
West Rock Inc, Grand prairie.
• Laser alignment of the gearbox and motor unit and replace feeder liners.
• Inspection, remove & Installation of the heat exchanger drain line gaskets Millwright (Shutdown) March 2019- April 2019
Ledcor Pipe & Infrastructure, Fort Murray.
• Installation & maintenance, winterisation of pumps, diesel engines and polymer units
• Remove and replace polymer feeder liners, and polymer agitators replacing screens
• Installation of breaker seal and breaker liners, Flushing of Lubrication system Millwright (Temporary) Dec 2018 – March 2019
RoughRider International, Fort McMurray.
• Rebuilding and overhaul of high temperature glycol Pumps, Godwin CD 400 pump, wear plate and Impeller clearance, and torqueing according to torque specs,
• Rebuilding, overhaul and Laser alignment of Progressive cavity moyno gear pump,
• Blinding and deblinding of the line, replacement of lubrication pump, agitators
• Rebuilding, overhaul and Replace pressure piston hydraulic cylinder, Installation of material cylinder. Millwright (Temporary) Nov. 2018- Dec 2018
AECOM maintenance, Fort McMurray.
• Overhaul of Pumps, commissioning of Impeller clearance, according to torque specs, Blinding and deblinding of the line, replacement of lubrication pump,
• Replace rollers/ Idlers of froth screen, replacing of bearing, Changing Froth screens, hydraulic system, lubrication system maintenance
Millwright (Shutdown) August 2018- Oct 2018
AECOM maintenance, Fort McMurray.
• Interpret and read schematic blue prints to install screens in the crusher according to torque specs, Blinding and deblinding of the line.
• Conveyor belt, crusher, replacing rollers and Idlers surge bins and hydraulic system, lubrication system maintenance.
Millwright (Temporary) July 2018 – August 2018
RoughRider International, Fort McMurray.
• Installation & PM of the Centrifuge decanter, grease pump and sensors.
• Installation of Booster, gland water pump and Reassembling of Volumetric feeder and seals.
• Troubleshooting and maintenance of PSV, install and servicing of bearing, Maintenance of bearing seals of the Centrifuge Decanter
Millwright (Shutdown) June 2018 – July 2018
LOK Energy services, Fort McMurray.
• Installation of Turbine rotor, Diaphragms, ESV valves, bearing seals etc.
• Remanufacturing of Hydraulic Electro Servo valve and seals.
• Measurement of Clearance and alignment of Diaphragms stages, labyrinth seals and bearing
• Laser Alignment pre-check/post check of Turbine and Generator Coupling
• Interpret and read schematic blue prints to install bearing, Maintenance of thrust bearing and bearing seals of the Steam turbine Rotor
• Maintain records and keep track of the parts numbers according to blueprints for reinstallations as per specific procedure.
Millwright (Shutdown) May 2018- June 2018
Kinetix Energy Services, Christina Lake.
• Measurement of Clearance and alignment of compressor blades, turbine stages, labyrinth seals and bearing
• Installation of Turbine blades, Shroud blocks, Cans flow lines, bearing seals etc.
• Installation of Riverhawk Auxiliary coupling for the lower end of the turbine
• Maintenance of Kingsbury thrust bearing of the turbine Rotor
• Interpret and read schematic blue prints to install bearing and mechanical seal of the Gas turbine
• Maintain records and keep track of the parts numbers according to blueprints for reinstallations as per specific procedure.
Millwright (Shutdown) January 2018- April 2018
AECOM maintenance, Fort McMurray.
• Interpret and read schematic blue prints to install bearing and mechanical seal in pump and troubleshoot to minimize downtime.
• Maintenance of oil & gas machinery and preventive and predictive maintenance and keep records for follow up.
• Conveyor belt, crusher, surge bins and hydraulic system, lubrication system maintenance. Millwright (Temporary) March 2017- Sept. 2017
Phoenix Industrial, Nisku
• Interpret and read schematic blue prints to install bearing and mechanical seal in pump and troubleshoot to minimize downtime.
• Operate manual lathe and milling machine for necessary repairs.
• Maintenance of shop and preventive and predictive maintenance of industrial machinery and keep records for follow up.
• Conveyor belt and hydraulic system, lubrication system maintenance.
• Installation and levelling of machines.
Apprentice Millwright June 2014– January 2016
Nexus CNC Machining Ltd, Edmonton
• Maintain plant equipment and trouble shoot to ensure minimal downtime of Machine parts production facilities
• Repair and service of Centrifugal pumps, Reciprocating Pumps, compressor, pneumatic valves and cylinders
• Prepare preventive maintenance schedules.
• Replacement and Maintenance conveyer belt, roller and ball bearings including packaging system
• Setting of the different dies and performs all operation on the power press for sheet metal works.
• Carry out scheduled preventive maintenance and annual shut down maintenance
• Work scheduling and training of apprentice millwright. Maintenance Planner/Scheduler October 2009– Feb. 2012 Reliance Petrochemicals. Gujarat, India.
• Implemented maintenance management system in compliance to ISO certification to achieve operational excellence SAP.
• Supervised and done balancing of the rotors on Balancing Machine and prepared reports
• On site Vibration Analysis, Conditioning Monitoring and Field Balancing of rotating equipment like pump impellers, Blowers, Centrifuge, ID & OD fans of boiler, Cooling Tower Fans etc.
• On site, LASER Alignment of the Horizontal Coupler Driven machines using LASER Alignment kit.
• Scope out each job through site visits, discussion and/or meetings with relevant stakeholders in order to ascertain required level of planning details and documentation appropriate for each individual job.
• I have strong Computer literacy with (MS Office suite), SAP/Primavera systems
• Identify parts, rentals and services required to do the job and initiate the ordering process
• Liaise with offsite vendors, collect quotes/discuss schedules and set up requisitions
• Lead safety initiatives for continuous safety improvement at worksite.
• Tracked, analyzed and improved maintenance key performance indicators such as asset allocation, maintenance cost, PM compliance, schedule compliance etc.
• Journeyman Industrial Mechanic Millwright.
• Diploma in Mechanical Engineering Technology, Canada (2012-2014)
• Bachelor of Engineering (2006-2010), MIT(members in training APEGA)
• CMMS and Maximo Training
• WHMIS 2020, FIRST AID Training, Forklift Certification, Overhead crane Training
• CSTS-09, H2S ALIVE AND CONFINED SPACE ENTRY/MONITOR TICKETS
• OSSA FALL PROTECTION
• Basic Inspection Methods certified by CWB
• Comply with Company safety rules, policies and procedures
• Follow Lockout/Tag out procedures
• Working outdoors, varied temperatures, and weather conditions
• Working indoors in varied conditions (i.e. hot, noisy, dusty)
• Effortless mobility through all areas
• Working in confined spaces
• Working at heights
• Physical capable to perform assigned duties and apply safe lifting techniques. Over the course of my career, I have learned highly effective team-building and team-management skills. I believe my experience both in working as an employee in a collaborative set-up as well as in a Management position gives me a valuable understanding of work place dynamics and relationships that will contribute substantially to my ability to excel in the present position, working with a wide variety of co-workers and superiors.
• Microsoft Office – Advanced
• Microsoft Excel – Advanced
• Power Point Presentation- Advanced
• Primavera/ SAP working knowledge
• Strong CAD design
References available on request
Sincerely,
Dipak Kumar
CERTIFICATES AND TRAINING
WORKING CONDITIONS AND PHYSICAL DEMANDS
INTERPERSONAL SKILL
PROFFESIONAL SKILLS
EDCUCATION