Pete Kasper
**** ******** **** 317-***-****
Indianapolis, IN 46217 ********@*****.***
OBJECTIVE
Project Management or Mechanical engineering position making full use of my proven ability with in-depth troubleshooting, problem solving, and diagnostic troubleshooting. An ideal position would also utilize my extensive computer knowledge, ability to learn with minimal amount of training, and diversity to work independently or in a team.
EXPERIENCE
ZF—LAF Lafayette, IN Oct 2022 – Present
Senior Systems Innovation Engineer
Oversee all powertrain applications
oDiesel engine/Automatic Transmission/Electric Center Drive/eAxle
Oversaw PowerLine T/M installation in Tico Terminal Tractor (TT)
Oversaw PowerLine T/M installation in Autocar TT for Autonomous Program
Work with UPS (Plainfield) for Test Vehicles
Work with Fleet Sales & OEM Sales to expand the ZF Product applications/vocations
ZF—LAF Lafayette, IN Apr 2019 – Oct 2022
Systems Integration Engineer
Oversee the integration of the PowerLine T/M into the PACCAR MY2021 NMD (New-Medium Duty) Program
Work with PACCAR Mechanical & Controls Teams to review open issues and track potential solutions
Perform PM functions as needed for the NMD Project:
oWork with ZF Controls team (NA & Germany) to cover SW/Cal development @ PTC (PACCAR Technical Center)
oWork with ZF-FRD Mechanical team on design, development, and re-work based on ZF/PACCAR testing
oCoordinate with Cummins regarding Mechanical engine interface issues & Controls solutions
oCoordinate with PACCAR Key Account personnel regarding Commercial topics
Work with Service to support the CFT (Customer Field Test) portion of the PACCAR NMD Program
Escalate open issues/topics with ZF/PACCAR Management to achieve support and resolution
Keep open lines of communication with PACCAR/ZF/Cummins personnel
Research potential testing strategies utilizing TRC facility
Research Logistical (Shipping/Receiving) policies and procedures
Troubleshoot Diagnostic issues using ZF Service Tool (Testman)
Collect Vehicle CAN & ZF CAN using CANalyzer & Vector tools
Provide support to the PACCAR St Therese plant for Dyno issues & perform Mechanical Checklist for Production
Performed calibration development with PowerLine T/M with Cummins (table based) Gas engine
Scheduled to perform calibration development with PowerLine T/M with Cummins (physics based) pre-Production Gas engine in Q3/Q4 of 2022
Cummins (via Bartech) Columbus, IN Jan 2018 – Apr 2019
Contract Service Engineer
Review Warranty Claims on various Engine Platforms (X, B, L-Series)
Perform deep dive on Warranty Issues & Trends—including ECM replacements & re-calibrations
Update & present Infant Care Incidents to the EFRIG team
Review Service Publications for correct procedures & troubleshooting steps
Contact Dealers & Distributors to gather Scene of the Crime information to better understand the failure modes of various engine types
Report findings on assigned Infant Care Incidents—Soot analysis, Cummins lab test results, Supplier test results, etc
Ensure failed field parts are returned to the plant for failure analysis
Used INSITE Service Tool to help evaluate Warranty Claims
Ameribridge Inc. Indianapolis, IN Jul 2017 – Oct. 2017
Refurbishment Manager
Oversee work schedule for 10-15 shop employees—including painters
Review Project costs (monthly) for accurate ETC reports
Interact with Project Management, Engineering, Accounting, and Purchasing to ensure Projects are under budget and research ways to reduce product costs
Work with Suppliers and sub-contractors to complete Project tasks on schedule
Maintain shop equipment maintenance—forklifts, scissor lifts, part washer, etc
Work with Suppliers to attain quotes and lead-times to minimize costs
Coordinate loading of bridges for transport to the field for installation
Hill & Griffith Indianapolis, IN Jan. 2017 – Jun 2017
Maintenance Manager
In charge of directing work schedule for three (3) maintenance personnel
Oversee all repairs to Production equipment—tanks, pumps, piping, etc
Order all parts for equipment repairs and special Project units
Reduced overall cost on Tip Lube Applicators and 30-gal / 60-gal Proportioning Units by 30%
Overhauled all PM instructions and schedule
Presented quote packages on roof and driveway repair to the Plant Manager vs. budgeted annual numbers
Provide Technical assistance to the Sales team on all special Projects / equipment
Coordinate work and schedule with outside Contractors
Attend Safety Training classes / seminars to incorporate into H&G work environment
Hirata Corporation of America Indianapolis, IN Nov. 2011 – Oct. 2016
World leader of production engineering systems, serving many diverse manufacturing industries from semiconductors that demand a high degree of precision and cleanliness, to more conventional large scale manufacturing applications like engine / transmission assembly or tire production
Project Manager Nov. 2014 – Oct. 2016
In charge of meeting with customers and suppliers to ensure Project budget is not exceeded
Worked in conjunction with Japanese counterparts to meet delivery dates
Spent multiple weeks on-site to oversee installation of conveyor system at Toyo Tire (White, GA)
Interacted with customer personnel, contractors, and internal personnel to meet schedule milestones
Worked on multiple projects requiring both Mechanical Engineering background and Project Management, including ordering parts and reviewing drawings.
Spent time on-site at Customer facility ensuring conveyors were installed properly and addressing issues
Directed Contract employees on daily tasks to completely ensure schedule was met
Oversaw the daily tasks of contract employees to assemble material handling equipment
Interviewed potential contract employees for assembly
Approved work hours for contract employees
Made decisions regarding contract employees hiring / firing
Assembled equipment based on schedule and manpower available
Field Service Engineer Nov. 2011 - Nov. 2014
Responsible for building various material handling equipment, including conveyor, robots, piston lines, etc. from blueprints (AutoCad drawings and SolidWorks eDrawings)
Work with the Design Engineer and Project Manager to order equipment, receive and check-in parts, and recommend improvements
Oversee and install equipment at customer locations
Check machined parts against prints to ensure quality
Ordered parts and supplies as needed or required by the particular project
Updated multiple Electrical drawings on Cummins Piston Line project
Updated pneumatic drawings to reflect changes made on-site to accommodate customer needs
Proficient in AutoCad, AutoCad Lite, and DraftSight
Dart Controls Zionsville, IN May 2011 - Oct. 2011
Application Engineer
Responsible for working with Sales and customers to match various electronic motor drives for AC / DC motor applications
Responsible for pre-production S/W testing on prototype motor drives
Field technical and application calls from customers, distributors, and OEMs
Assist Repair department with overflow of warranty and technical assistance calls
Horton Inc. Carmel, IN Mar. 2008 - Jan. 2009
Application Engineer
Responsible for working with Sales and customers to match various fan products with the correct applications
Responsible for standard air flow tests in the wind tunnel, evaluating and reporting the results, writing special test plans for wind tunnel testing including fans, radiators, and any special test fixtures
Responsible for standardizing processes and procedures for fan drawings
Intelligrated Mason, OH Jul. 2007 - Jan. 2008
Project Engineer
Responsible for creating and modifying system layouts (using AutoCad 2007) in accordance with the lead Project Engineer and the customer
Responsible for creating panel points and laying out header steel on roof and mezzanine drawings
Performed point loads utilizing BeamPro software
Received training in Continuous Improvement and Lean Engineering
Allison Transmission Indianapolis, IN May. 1998 - Apr. 2007
Field / Application Engineer
Responsible for updating customer test vehicles with pre-production hardware and software
Customers included UPS, Coca-Cola, and Ray's Trash
Provided application engineering support to OEMs, Distributors, Sales, and Service
Extensive experience with providing diagnostic troubleshooting skills to resolve vehicle system and installation problems - both production and pre-production applications
Continuous evaluation of troubleshooting literature to reduce warranty costs
Continuously worked with Dealers/Distributors to find the best practices of troubleshooting the latest production transmissions
Extensive experience in dealing with GM dealerships in troubleshooting the Allison Transmission in the 3/4 & 1-ton pick-up trucks
Supported the Controls Teams on Development trips
Rapistan Systems Grand Rapids, MI Jan. 1996 - May. 1998
Project / System Engineer
Involved in SPBS and TMS projects for the USPS
Responsible for performing site surveys and creating system layouts (using AutoCad13) on-site with a laptop for the SPBS projects
Responsible for ordering all equipment, including purchased items
Responsible for co-coordinating with the design department for special equipment orders
Troubleshooting on and off the site - interacting with installation, customers, and project management
Responsible for header steel on the TMS projects - assigned to investigate ways to reduce cost (structural steel vs. formed channel)
Automotion, Inc. Worth, IL Jan. 1994 - Jan. 1996
Project Engineer
Responsible for writing bills of material (BOMs) for all equipment on both standard product line and special equipment (axle isolator applications)
Assigned team leader to create the bills of material for three (3) Levi Strauss & Co. projects - largest conveyor systems the company had designed to date
Assigned to the group responsible for creation of CTO (Configure-to-Order) module
Spent three (3) months as the on-site coordinator for the installation of the Levi Strauss distribution center in Canton, MS
Coordinated with specials engineering, project management, manufacturing, and installation personnel on the Levi Strauss projects
Direct dealings with customer for onsite scheduling of installation, safety issues, and resolution of engineering related issues
Responsible for creating shortage and punch lists and for keeping project management informed of problem areas and issues requiring review from upper management
American Electronic Components Elkhart, IN Jun. 1993 - Jan. 1994
Engineering Technician
Manufactured and tested various prototypes of mercury switches and Hall-effect sensors for automotive applications
Compiled reports from test data for Project engineers
Performed time-study tests on manufacturing equipment, including Isoplots vs. normal distribution curves
EDUCATION
Rose-Hulman Institute of Technology Terre Haute, IN
B.S. Mechanical Engineering 1993
Inducted into the Hall of Fame for baseball and football - 2003
IUPUI Indianapolis, IN
Graduate School and Pre-requisites - Computer Science 2009 - 2011