ENGR. GEORGE ATIOGBE
Postal: P.O. Box NB **, Nii-Boiman. Accra-Ghana
Phone:+233-**-***-****/55-383-3667 Email:**************@*****.***
LinkedIn: https:\\www.linkedin.com/in/george-atiogbe-41a21a229
Birth Date: 23rd April 1981 Marital Status: Married
PROFILE:
·Very quick to adapt, determined, dependable, and self-motivated
·Good interpersonal and communication skills
·Good team player yet equally at ease working on my initiative.
WORK EXPERIENCE
Position: Site Engineer Jan 2020-Dec 2024 Company: Fridoug Limited
Project: Five (5) Storey Office Block (Labone)
Consultant: Archxenus Evolved
Duties:
·Monitored and ensured all civil works were carried out as per specifications and drawing
·Coordinated and managed all project resources, labor, materials, and equipment
·Check all structural arrangements for all aspects of structural works
·Provided technical guidance and support to project team members
·Ensured compliance with project plans, specifications, and safety standards
Position: Site Engineer
Company: Fridoug Limited
Project: Toyota Ghana (Graphic Rd) Refurbishment of 2-storey offices and workshop (PHASE3)
Consultant: encafrik ltd
Duties:
·executed all Finishing works including Masonry, Tiling, Painting, Door frames, etc
·Calculates quantities required to execute finishing activities.
·Understood specifications/methodology and architectural drawings of finishing activities.
·Coordinates with Contractors/Subcontractors for Finishing Activities.
·Checked Daily Progress Report & Finishing work snag list.
Position: Site Finishing Engineer
Company: Fridoug Limited (Zaddington Estate)
Project: 5-storey apartments(3pcs),34pcs 4 bedrooms one storeys
Duties:
·Supervised finishing works, painting, tiling, and installation of fixtures
·Quality control, ensuring all activities meet required standards and specifications
·Setting out sites
·Coordinated with sub-contractors, suppliers, and team to complete within schedule
·Ensured projects met agreed specifications, budgets, and timescales
· Maintains communication with clients on updates.
Position: Engineering Surveying Assistant Jan. 2020-Dec 2021
Company: Jim and Co Engineering Limited
Project: Multiple Projects (Part-Time)
Duties:
·Calculate heights, depths, relative positions, property lines, and other terrain characteristics.
·Plan and conduct ground surveys designed to establish baselines, elevations, and other geodetic measurements.
·Coordinate findings with the work of engineering and architectural personnel, clients, and others concerned with projects.
Position: Project Manager Jan. 2017– Sept 2019
Company: Leonard’s Homes Limited
Project: Ghana Government Priority Hospital Infrastructure Project-Agenda 111(Birim-South)
Consultants: Adk Consortium
Duties:
·Managed project budgets, schedules, and resources.
· Developed and maintained project documentation and reports.
· Conducted site visits and inspections to monitor progress.
· Identifies and mitigates project risks and issues.
· Negotiates contracts and agreements with vendors and contractors.
· Communicates project status and updates to stakeholders.
·Led project meetings and coordinated project activities.
March 2013-Dec 2016
Position: Construction Site Manager
Company: Royal House Chapel International
Project: Oil Dome (21,000 Capacitor Auditorium)
Duties:
·Strategically deployed construction staff to maximize productivity.
·Maintained health and safety and eliminated any safety hazards.
·Developed overall construction strategy for 8 regional on-site projects.
·Devised realistic schedules and programs for construction activities.
·Managed team members and ensured the availability of materials, guidelines, and skills to function
Position: Assistant Operations Manager
Company: Royal House Chapel International
Project: (Various)
Duties:
·Supervised daily operations, and procurement activities
·Oversaw operational finances, risk, and audit activities
·Developed and maintained operational guidelines for staff
·Performed routine maintenance and repairs for equipment
·Maintained facilities and fleet management.
Position: Estate Officer
Company: Royal House Chapel International
Duties:
·Acquiring permits from the applicable government agencies for various activities
·Conducted Inspecting property grounds, buildings, and equipment to identify maintenance concerns and direct timely repairs.
·Liaises with appropriate authorities to complete the transfer of ownership and registration of newly acquired properties at the Lands Commission.
·Responsible for the properties management including services contracts, maintenance, repairs, renovation, and re-modelling
·~Oversaw and enhanced work of maintenance and sub-contractor team members to promote optimal efficiency and ensure the property is safe to use
Dec. 2010-Jan. 2012
Position: Site Supervisor
Company: West Bay Properties
Project: Construction of Apartment Complexes
Duties:
·Closely managed site operations, keeping team production at an optimal pace.
·Sourced suppliers and purchased necessary materials, researching best prices to reduce costs by 35%.
·Administered budgets, tracked expenses, and documented changes for accurate cost controls.
·Directed 6 projects according to schedule and quality demands.
·Managed site safety and security to prevent intrusion, criminal activity, vandalism, and risk to workers.
Position: Cell Site Engineer Sept. 2008-Nov. 2009
Company: Skarf Telecommunications Limited
Project: Construction of Telecommunication Mast Basements
Duties:
·Surveyed, graded, and leveled construction sites within assigned timeframes.
·Oversaw QC for construction teams and delivered results in line with project specifications.
·Sourced construction materials for numerous sites, negotiating cost-effective solutions.
·Managed lifecycle stages of construction projects, from design inception to timely completion.
·Engaged subcontractors, provided thorough safety and policy briefings, and maintained compliant site.
Position: Site Supervisor (Internship) May 2006-Oct 2006
Company: Kouttam Construction Ltd
Project: Construction of University of Ghana Volta Hall Human Resource Centre
Duties:
·supervised workers and subcontractors.
·helped project managers plan work.
·managed orders and deliveries of construction materials.
·organized staff work schedules.
·check work is carried out safely
EDUCATION
·Bachelor of Science (BSc.) (Hons) Construction Technology & Management
Kwame Nkrumah University of Science and Technology, Kumasi – Ghana (May 2017)
Thesis: Managerial Mindset to risk management in consulting firms in Ghana.
·Higher National Diploma (H.N.D) Construction Technology
Takoradi Polytechnic School, Takoradi - Ghana (October 2007)
Thesis: Assessing the role of building Inspectors (A case study in the Shama-Ahanta East Metropolitan Assembly)
·Construction Technician Part 1 (CTC 1)
Takoradi Polytechnic School, Accra - Ghana (April 2003 – October 2004)
PROFESSIONAL AFFILIATION
Institution of Engineers and Technology-Member
No. PET 05348 (Civil Division)
PROFESSIONAL SKILLS
Computer: MS Project and Microsoft Office Suite
Equipment/Instruments: Survey Instrument used (Automatic level, Theodolite, and laser leveling machine)
Managerial: Site policy implementation, Project budgeting/Financing, Operations Management, Health/Safety, Construction Site Management, Project coordination, Contract Administration/Reviews, Quantities and Financial management
PROFESSIONAL AFFILIATION/ACADEMIC DEVELOPMENT/TRAINING
·Certificate – Building Inspection (Accra Metropolitan Assembly)-2008
·Certificate – Project Management Professional (PMP) Training
·CITAM - Consulting in Technology and Management, Accra – Ghana (October – December 2010
·My Safety Journey Workshop (Graduate Training Institute) (Accra) –2015
·Ghana Institution of Surveyors (GhiS) – Membership pending.
·Resources and Time management in construction work – Polytechnic Association of Construction Students (PACONS) – 2006
HOBBIES AND INTEREST: Researching new engineering technologies, watching movies, and traveling.
REFERENCES:
Available upon request