Eng. Haitham Abdul-Aleem - CV KSA+966-*********
PROFESSIONAL SUMMARY
Experienced Architect with a strong background in engineering, site management, coordination, and supervision. Proven in project and team management, with excellent negotiation skills and expertise in design and construction, managing governmental compliance. Committed to delivering high-quality successful projects on time and within budget. Ready to leverage my experience as R. Eng., Senior Pr. M. EDUCATION
Bachelor of Engineering Architecture - Ain Shams University, Cairo, Egypt. May 1997. Professional Development
• Fundamentals of Project Management & Effective Leadership. European Mgmt. Center, April 2001
• PMP Preparation Courses. Project Mgmt. EXPERT Center, December 2014. SKILLS
• Project Management, Negotiation skills, Team Leadership & Site Management
• Design Review, Discipline Coordination, lead architect, Applying Building Codes & Regulations
• Quality Assurance & Technical Documentation (Using related software / tools) SELECTED PROJECTS
• NESAJ Residential Compound - Al-Khobar, KSA
Role: PM Assistant / Head of Arch - Site Supervision of Residential Recreation Compound, landscaping & Infra / Utilities. Size: 130,000 sq. m, [SAR 270M] - AL-FAWZAN INV.GROUP. Outcome: Successfully delivered a functional and operational compound.
• KJO - Al-Khafjy Joint Operation – Oil & Gas Co., KSA Role: PMDC / TM Assistant – SO2 prevention, renovation, upgrade & rehabilitation of 23 Control Rooms, utilities & adding new facilities inside refineries’ area. Size: 50,000 sq. m, [SAR 850M]. Outcome: Completed Biding documents (DWGs, Specs, Reports) enhancing operational efficiency.
• Marriott Old Palace 5*Hotel, Resort & Staff Housing - Hurghada, Egypt Role: Pr. Eng. Design / Site supervision - Upgrade & Extensions 450 Rooms including public areas, BOH & Service areas – new construction of staff housing 150 Rooms with its services. [$ 48M]. Outcome: Soft opening, enhancing brand visibility, achieving operator & guest satisfaction.
• Hilton Sharm Dreams Resort - Sharm El-Sheikh, Egypt Role: Pr. Eng. Design, Shop DWGs / Site supervision – 600 Rooms Resort including: Public areas, BOH & Service areas (3stages) - Aquatic Park & Dolphine - Food Court & Mall [$ 120M]. Outcome: Successful completion and operational readiness of the resort with all facilities.
• Cairo Clinic Specialized Hospital - Giza, Egypt
Role: Pr. Eng. Design, Shop DWGs – Reinforcement and rehabilitation of a 7-story, 60-bed hospital, including 2 operation, ICU, premature ICU, X-ray, CT scan, and outpatient facilities, with utilities Outcome: Hospital operation achieved – ensuring the proper logistics for medical equipment installation and facility setup. 870sq.m/FL
Arch. Haitham Abdul - Aliem Al - Mowafy
Mobile: +966 - 5 9 3020500 EGY + 2 01 11 - 2106566 Email: *************@*****.***
KSA
Eng. Haitham Abdul-Aleem - CV KSA+966-*********
WORK EXPERIENCE
Construction Manager / RE Supervision – House of Consulting Office HCO RCU, Royal Commission Al-Ulla, Saudi Arabia 2023 - Present
• Involved in drawings review, material approvals, and technical coordination across all projects, ensuring seamless execution and adherence to project specifications and standards aligned with project time sched.
• Supervised the construction of Hayat Place Hotel AlUla (250 rooms, public facilities & utilities) as Supervision Cons. Manager under ATKINS PMS, overseeing 60% project completion.
• Managed & supervision up to commissioning stages of AlUla Fledge Gym sports building project.
• Oversaw the construction of three Heritage gas stations in AlUla, ensuring compliance with RCU standards, Saudi regulations, and operational requirements.
• Led the development of key facilities such as AlUla Visitor Center, food outlets, mosque, and EV stations, ensuring full compliance with local regulations and municipal approvals.
• Directed a team of 20 professionals in design reviews, technical guidance, site execution, and project close-out, ensuring timely milestone achievement, operational readiness, and compliance with quality and regulatory standards.
Outcome: Delivered all three gas stations on schedule, boosting service delivery and operational performance for RCU, while adhering to government and regulatory frameworks (SEC, Civil Defense). Budget: [SAR 150M] – Project Size: 3500 sq. m per each Gas Station Tech. Manager, Head of Arch. & Tech. Coordination - China Railway Const. Co. CRCC. MOI, KAP5 - Riyadh, Saudi Arabia 2018 - 2023
• Developed a coordination strategy for facility buildings, including administration buildings and security facilities across 240 sites in Saudi Arabia. (Infra Structure & Building tech. coordination)
• Led the development of design to shop DWGs, ensuring compliance with project specifications and land-based regulations. Development included materials & systems to comply with regulatory and governmental standards within the applicable codes
• Streamlined processes and ensured alignment with government approvals and project tender documents to improve project efficiency, with closing documents of 19 sites. Outcome: - Secured necessary governmental approvals from NEC, SEC, Civil Defense, and municipalities, ensuring the operational functionality of public utilities connectivity
-. Enhanced project delivery speed by 20% through effective coordination, streamlined design development, and documentation management. Budget: [SAR 10B] – Governmental project PM Assistant / Head of Arch. - Engineering Consultants Group ECG NESAJ Residential Compound -Al-Fawzan Group - Khobar, Saudi Arabia 2016 – 2018
• Led the architectural supervision of a residential compound with 458 units (villas, townhouses, apartments) and a 3-story clubhouse. PRE-CAST construction type
• Managed key amenities including a covered playground, cinema, gym, squash court, guestrooms, multipurpose hall, cafeterias, and a swimming pool (4,400 sq. m).
• Supervised utilities, underground services, Fences, Gates and staff housing.
• Coordinated design reviews, finishing Mat., developing design and landscape with other disciplines. Outcome: Ensured soft opening on schedule, meeting all operational targets. In addition, all project closeout documents. Budget: [SAR 270M] – Project Size: 130,000 sq. m Tech. M. Assistant / RE Supervision - Al-RABIAH Consulting Engineers – ARP KJO - Khafjy Joint Operation, – Khafjy Saudia Arabia 2013 - 2016 Eng. Haitham Abdul-Aleem - CV KSA+966-*********
• Project Management Team Member (PMDC)- Managed design stages to SD and bidding documents for a fire station, facility buildings and 23 control buildings upgrades.
• Coordinated with KJO departments, recommendations to Upgraded HVAC, firefighting systems, and safety measures to prevent SO2 dispersion across refinery areas, with infrastructure connections
(utilities, power, water). meeting all supplier availability & related codes requirements. Outcome: Completed projects bidding doc. & reports of system applicability to upgrades with proper connectivity to existing infra structure Budget: [SAR 850M] – Project Size: 50,000 sq. m Royal Commission - Jubail, - KSA
Design of 4 kindergartens according to IBC & RC requirements/regulations located in Al-Jubail
(each ~ SAR 60M). All Bidding Documents were prepared & distributed Maintenance complex - Al-Hassa Municipality, - KSA Supervising new constructions and Renovation of main garage, offices, workshops and car parking lots. Also supervising 3 projects of roads furniture. (SAR 53M) -Buildings operation was achieved Head of Design Department - Allied Engineers Consulting Office – AE - Cairo, Egypt. 2005 – 2012
• Led design development through to construction documentation, coordinated reviews, supervised on-site work, ensured quality and timeline adherence, and managed all DWGs and project documentation for multiple projects, including a 10-story residential complex in El-Saraiya, Giza, 2 mosques, private villas in New Cairo, Obour, and 6th October, and a 12-story residential tower in Port Said.
• Supervised soft opening and final installations for the Renovation / Extensions of Marriot Old Palace, 4- story hotel (320 rooms) with interiors by WATG( USA), managed the completion of ATOUN Hotel & Resort
(50 rooms, health club), ITWORX Office Building (structural repairs), ENERGIA HQ (showroom and offices), Giza Cables Factory (office building and hanger- Fire Fighting network), Marriott Staff Housing
(180 rooms, amenities), and the Cairo Clinic Specialized Hospital (7-story hospital with ICU and medical facilities).
Senior Architect- head of design dept – 1998 - 2004 Consultancy Group for Studies & Projects Management – WECG - Cairo, Egypt Led design development from concept through to construction across various sectors, overseeing hospitality, public, educational, office, and residential projects. Hospitality Projects:
• Managed design for 8 hotels & resorts across Egypt, including Hilton Sharm Dreams, Nubia Sharm, Tulip Marsa Alam, Elain AL Sokhna Tulip Resort and Ras Seder Pearls, each with 350 guest rooms, main buildings, staff housing, shopping centers, and utilities. Projects featured close coordination with international design teams, such as John Pier Hammed (France) for Hilton Sharm & WATG (USA) for Tulip Marsa Alam
Public, Educational, Residential Projects & Office Buildings:
• Designed and coordinated Sama Misr Office Building (Giza), Caltex Office Building (Cairo), and multiple educational complexes, including the Cairo English School and Germany School (Sharm El Sheikh)- 3 mosques1,800 sqm. private villas and residential towers in New Cairo, Luxor, Port Said, and Emadi, ranging from 8 to 13 stories.
In this role, I ensured high-quality design delivery, project coordination, and compliance with local and international standards.
Architect & Drafter Dr. Talat El-Dally Office, Cairo, Egypt 1995 - 1998
• Higher Constitutional Court competition 1st prize
• Elsewise & Aswan Museums competition 2nd prize