Hameed Fasahath

Techno-Commercial Proposal, Quantum,

Claims, Contracts & Cost-Control

Hameed Fasahath, Email ***************@*****.*** 1 Position : Associate Director Cost

Memberships: RICS – APC - 6939796

Nationality: Indian

Languages: English, Tamil, Hindi, Arabic

Experience: 13+ yrs

Contact: +966*********,

https://www.linkedin.com/in/hameed-

fasahath-i-cost-consultant-i-126b0b167/

Highlights: Infrastructure, Hotels, Car

Parking, Masjid, Star Hotels, Residential

Apartment, Commercial and Mix Use,

High Rise Buildings, Attraction and

Entertainment Complex.

Career Accomplishments

• Extensive experience in Client, Consultant, Main Contractor & Sub-Contractor Role.

• Supervised team of 8 QS Engineers/staff

members.

• Awarded Re-measurable Project value by 369M

SAR by completing Cost Estimate with accuracy

and efficiency.

• Recovered SAR 87M in long-standing payments

through strategic negotiations& Improved cash

flow by 25% through effective contract

management and claims resolution.

• Implemented cost control measures, resulting in a 15% reduction in project overruns. Developed and

implemented a streamlined contract review

process, reducing review time by 20%.

• Led the resolution of complex variation claims,

resulting in SAR 32M additional revenue.

• Najm (Star) Award nominee in KSA Region 2018

in Al-Futtaim Company

Executive Summary

Electrical Engineer with excellent technical base and Hands-on experience on 100+Billion Dollar Project in all aspects of QS /Commercial

/Contracts/Claims/Design Management with over 12+

years of exposure to quantum analysis principles used in construction industry and have sound fundamentals in prolongation, disruption and general cost claims as a part of claims submission process via various role & predominately work with International Client-side, Consultancy & Contracting Companies within the

construction, property and real estate industry

involved in various Contracts such as traditional, Design Build and EPC Turnkey Projects. I am

proficient in MEP as well as Civil & Architecture works, projects handled from Project Initial Stage to Final account for the workload in Highlights of commercial, residential and High-Rise buildings, Malls, Masjid, infra works, Car Park, Entertainment Complex etc. has Proven records of effectively worked with Developers, Governments, Design Consultants and other

Contractors and would be an asset to employer

milestone achievement.

Key Skills & Knowledge Areas

• Contract Practice & Administration

(FIDIC Rainbow suite & use of bespoke

contracts for construction)

• Quantity Surveying, Cost Control, Planning,

Commercial and Claims Management.

• 30% Pre & 70% Post - Contract Management

experience

• Cost Estimating & Planning Technique

• Managing teams, subcontractors

• Contract Review and Drafting.

• Value Engineering, Variation order under Change

Management experience

• Estimation, Tendering and Procurement Route Selection

• Post-Contract duties including Negotiation of the contracts with the Contractors, Client Variation, Monthly Valuation and Final Account Preparation.

• Electrical Designing, Design Review, MEP Execution, QA QC Practices.

Software Skills Others:

• MS- Office > Driving License-KSA

• Auto Cad, BIM (Inter) >Saudi Council of Eng.

• Plan swift

• Primavera P6

Experience & Responsibilities-ICAD

Saudi Entertainment Ventures, P6 Abha

Entertainment Complex,

Abha

Client – SEVEN- PIF – 247M - SAR

Commercial and Contracts Manager MEP

(May 23- Live)

Managing Commercial Operation/Claims/Corporate Budget Control with the team of MEP Works – Managing and

periodic advice to Construction Team towards project delivery and milestone achievement.

• Ensuring the Commercial Operation, Quality &

Outcome for cost, quantum and Claims assessment.

• Complete Payment Process (Interim, Advance &Final Accounts) including Sub Contractor Payments.

• Generate Cost-Control Reports to Audit BTC and

advise to mitigate the incurred risks.

• Report to HO-Tender team periodically the lesson learned in order to save cost and win BID which is imperative to safe company’s financial health.

• Develop Quantity Audit periodically upon receiving new IFC to proceed with suitable claim process.

• Preparation of EOT and Prolongation Cost by

identifying potential delay event via respective

analysis such as Time impact/window/as-built/, as- planned/ impacted analysis.

• Procurement and SCM tracking and co-ordination.

• PMSR - Project Management Summary Report

preparation and advising Project Manager.

• Contract Administration-Draft Contractual Letter correspondence, warranties, bonds, licenses and

periodic advice on contractual Administrative solution and entitlement to the team and appropriate parties.

• Directing planning and scheduling works including monitor site progress.

• Budget Analysis, Cost Comparison between budgeted and actual and BTC -Budget to Complete.

• NPV - Net Present Value to build Profit &Loss

Hameed Fasahath

Techno-Commercial Proposal, Quantum,

Claims, Contracts & Cost-Control

Hameed Fasahath, Email ***************@*****.*** 2 Statement as well as Earned Value Methodology.

• Project Secondments to Regional Director and PM. Makkah First Ring Road (Infra Works), Makkah-Corderoy Client – Ministry of Finance – Confidential Value Senior Cost Manager – MEP

(August 2020 to April 2023)

Service Building, Tunnels, Bridges, Ring Road

• Preparation of Bill of Quantities, Tender Evaluation.

• Assessment of Variation Orders.

• Evaluation of Monthly Interim Payment Application

• Reporting to Project Director on all commercial day to day issues.

• Preparation of Interim Agreements. Evaluation of claims including Extensions of Time, Delay and

Disruption and Prolongation

• (Sub-Con Management) -Evaluation & Certification to Contractors Payment Certificates.

• Resolved conflicts and negotiated mutually beneficial agreements between parties.

• Analyzing & developing responses to commercial

risks

The Project of the Custodian of Two Holy Mosques

King Abdullah Bin Abdul Al-

Aziz for Mataf Expansion, Makkah

Client – (Ministry of Finance) – Confidential Value Quantity Surveyor – MEP (April2020 to August 2020) Responsible for all MEP works for Mataf, Haram,

Piazza

• Maintained consistent electronic files and

documentation for corporate actions, supporting

finance tracking and long-term budget management.

• Quantity Take – Off for Electrical and M

• To Save cost by implementing cost-saving initiatives that addressed long-standing problems.

• Coordinate and monitor all interfaces between design, procurement and construction phases

SAB Holding - HQ Business

Park – Jeddah, KSA

Client – SAB Holdings Value – SAR

700 Thousand.

Project In-charge cum QS MEP (Aug 2018)

Fit out of an existing shell & Core building to towards office setup

Commercially Managing MEP section of the project with duties entailing:

• Proved successful working within tight deadlines and fast-paced atmosphere.

• Managed projects from inception to completion

across programming, design, bidding and

construction management

• Project surveyor managing section of the project; controlling cash flow forecasts, cost reporting

internally and externally and agreeing payments

with the client

• Managing and monitoring the Contractor & sub-

contractor’s interim valuations, variations, claims and final account settlement.

• Jabal Omar Development Project(P3&P4)-AlFuttaim

Makkah, KSA Client – JODP – SAR 369 Million – MEP

Value Electrical Engineer / QS

Aug-2015 to April 2020

Tendering and Bid

Skills (Pre-Contract) &

(Post Contract):

• Preparation of Value Engineering Proposals, Cash flow forecasts/Cycle costing, feasibility study and change management

• Preparation of Cost at different stages such as

elementary, conceptual ad design stage for Cost

Planning and Estimating

• Preparation of Bill of Quantities Estimation of all variations, additional works, field changes, additions and omissions.

• Assist with the preparation of all technical, financial such as total price sheet, Tender Analysis, Tender Clarifications & recommendations for technical and commercial consideration.

• Acquired knowledge in Basics of FIDIC 1999 from of contracts. Interpreted architectural design changes reflecting to MEP works

• Conducted detailed cost estimates for Commercial and Hotel projects.

• Preparation of Monthly Interim Payment Application. Anand Citi Center Holdings– Chennai, ETA STAR

Client side– ETA Properties &

Investments Pvt. Ltd

MEP Engineer cum QS – Client Representative

100Cr INR (May 2012 to Aug 2015)

• Carefully analyzed completed projects and studies for compliance with established budgets and policies.

• Interpreted architectural designs and engineering plans for systems, new construction and existing

facilities.

• Evaluated final results to determine quality levels and isolate root causes of any identified faults.

• Optimized supply levels to keep stock within ideal parameters for expected needs.

• Developed standards and technical specifications for MEP Services and projects.

Conducted detailed cost estimates for Commercial and Hotel projects

MEP Engineer Experience with (International Client Side)

• Audit Value Engineering Proposals, Capital Forecast.

• Evaluation of Payment Application

• Estimation of all variations, additional works, field changes, additions and omissions.

• Project Planning and Management.

• Material approvals and verification

• Attend Site Progress and Technical Meetings towards project completion.

• Coordinate with suppliers for material follow ups. Hameed Fasahath

Techno-Commercial Proposal, Quantum,

Claims, Contracts & Cost-Control

Hameed Fasahath, Email ***************@*****.*** 3 ETA ASTRA Project – Madurai,

India

Client – ETA Properties &

Investments Pvt Ltd

MEP Engineer – Client Representative – 13Cr INR

• Detailed review of Design (IFC) and SHD

drawings.

• Evaluation of Payment Application

• Follow up with sub-contractor in line with planning progress schedule of MEP Services Installation.

• Experienced in Testing & Commissioning of MEP

Services. General Skills

• Knowledge in HVAC-Air Cooled/Water Cooled

Chillers-Primary, Secondary & Condensate

Pumps, Energy Transfer Station (ETS).

• Plumbing knowledge in pump selection based on

application such as, Irrigation, Drainage, Water

Supply, Water Treatment Plants, Sewage

Treatment Plant, Rain Water

• Fire Fighting System- Jockey Pumps, Booster

Pumps, Hydrants, Sprinkler.

• Technically competent in Managing Site Activities

• Having in Installation Technical of all Site MEP Meetings. Services in Demonstrated Site. ability in Commissioning Electrical & Mechanical

Equipment Systems.

• Experienced in ID Areas, Kitchens, Cold Rooms &

Facade Lighting Systems.

• Clear understanding of HSE Policy

Design Field Experience in Electrical

• Load Calculation, Voltage Drop Calculation, Cable Tray Sizing, Cable Size Calculation, etc.

• Preparation of Fire Alarm System with Load

calculation.

• Selection of Panels, Transformers, ATS, Gen Set.

• Preparation of Shop Drawings and As-Built Drawing QA/QC for All Experience Electrical (System Electrical) - Auto Cad.

• Handling Site Inspection with Consultant and ensure the Methodology of Installation as Per IEC Standards.

• Preparation of Project Quality Plan.

• Preparation of ITP - Inspection Test Plan

• Preparation of Risk Management Register.

• Mitigation Plan for Risk reducing and Contingency plan to improve impacts on anticipated Risks

• Prepare and Submit WIR, MIR and Maintaining Log

• Handling Internal Inspection, Attending FAT (Factory Acceptance Test).

Knowledge Areas

Acquired knowledge various international forms of

Contract Like FIDIC, NEC 3, JCT, IEE forms of Contract. Experience in the development of cost estimates & the preparation of Bills of Quantities.

As well as gained knowledge and practiced Designing of Electrical Systems and HVAC Systems

Other Certifications

• Dec 2021: RICS-APC#6939796-RouteMRICS-48 CPD

• Oct 2023: Primavera P6 Professional – 4 CPD

• Mar 2024: Revit MEP –ID #AC20032817- CAD Expert

• May 2023: Construction Claims Course -24 CPD

• June 2023: FIDIC Contracts Management - 16CPD

• Feb 2024: Analyzing Schedule Delays-0.1CEU- AACE.

• Sept2021:QMSISO9001:2015LeadAuditor ID# 325258

• Dec 2018: HSE Level 2 Health and Safety (ID

#271203/18), Al- Futtaim

• Dec 2021: Lean Six Sigma Black Belt (ID# B100323) Training

• Mar 2023: Licensed [SCE] - [Saudi Council

Engineers]

• Nov 2021: HVAC Design (ID # CD/B1/2074) Training

• Aug 2006: Typewriting English Lower (ID# 927310) Training

• Jun 2021: Energy Audit] Training

• Apr 2012: Solar Tracking System] Training

• Feb 2012: [PLC, SCADA AC DRIVES] Training

• Jun 2011: Boiler Auxiliaries Plant Training (11062011) Training

• Jun 2011: Gas Power Plant Training (17062011)

Training

• Jun 2011: Integral Coach Factory -Indian Railways (ID

#E&E/978)] Training

• Jan 2010: Central Electrical Repair Shop (CERS)

(ID#06616) Training

IFRS GAAP POMI BCIS CESMM4 NRM1

PV EV CSI AC BAC BTC ETC EAC EV CCP RMP PMP

CPI SPI direct cot indirect cost fixed cost cost overrun variable cost capex opex contingency mitigation

anticipation delay analysis ROI RAI ROS RFI RFQ RFP GPMR CCTV Data center CCNA WIFI ARUBA DNS ACS

FAS PAS Lenel Carrier Edward Traka Masterclock

Auravision genetech Hanwah Nexnova CPMS Tracking

SCM Procurement BoQ Reorder Point MSDS OEM HOOH

Emden echley CTC PTO fringe benefit cost benefit analysis productivity resource planning float time impact pro rata PPP construction Law LLM E2 Log Markup Margin SIC

Cashflow inflation opportunity cost finance risk deflation EUAC EUAB ROR DCF estimation parametric top down

bottom up physical dimension capacity factor ratio factor scale of operation TCM hans lang Arthur miller`data normalization DEM DFC IFC HOC depreciation liability dlp TQM break even analysis time based EBTIDA cost

planning adm pdm wbs NET NLT HLD LLD BCWS intrinsic retrospective processor successor CM CWH cost code DPR ledership time value for money CRM ABCM COQ

COO value engineering vp vacp EOI EOY PERT QRAT

SCL RCA PDCA Fault tree capital cost selling price profit Proposal Letter

Commercial /Contracts Manager

Hameed Fasahath

+966*********

***************@*****.*** Dear Team

I am responding to your job posting on Commercial Manager for the position at your organization. I have extensive experience as a Commercial and Contracts Manger. As a team lead, I have thrived on educating and mentoring other agents, employees which fits perfectly with our strong training culture and customer service focus. In my current position, Hands-on experience on 100+Billion Dollar Project Value Recovered SAR 87M in long-standing payments through strategic negotiations. Improved cash flow by 25% through effective contract management and claims resolution. Successfully evaluated half built project and achieved the contract value of 369M SAR. Implemented cost control measures, resulting in a 15% reduction in project overruns Developed and implemented a streamlined contract review process, reducing review time by 15% Led the resolution of complex variation claims, resulting in SAR 32M additional revenue. Excellent technical base in all aspects of QS /Commercial /Contracts/Claims/Design Management with over 13+ years of exposure to quantum analysis principles used in construction industry and have sound fundamentals in prolongation, disruption and general cost claims as a part of claims submission process via various role & predominately work with International Client-side, Consultancy & Contracting Companies within the construction, property and real estate industry involved in various Contracts such as traditional, Design Build and EPC Turnkey Projects. I am proficient in MEP as well as Civil & Architecture works, projects handled from Project Initial Stage to Final account for the workload in Highlights of commercial, residential and High-Rise buildings, Malls, Masjid, infra works, Car Park, Entertainment Complex etc. has Proven records of effectively worked with Developers, Governments, Design Consultants and other Contractors and would be an asset to employer.

Managing Commercial Operation/Claims/Corporate Budget Control with the team of MEP Works – Managing and periodic advice to Construction Team towards project delivery and milestone achievement. I would appreciate an opportunity to discuss how my background and experience could benefit our organization.

You can reach me via email at ***************@*****.***, or by phone at

+966*********

Thank you for your time and consideration.

Sincerely,

Hameed Fasahath

Employer Experience - 3+Yrs ( International Client) Engineer /Consultant Experience - 3+Yrs (International Consultant) Contractor Experience - 3+Yrs(International Contractor) Main Contractor Experience - 3+Yrs (International Main Contractor) 1

Testimonials

P6 ABHA ENTERTAINMENT COMPLEX

INTERIM PAYMENT APPLICATION - 011

Advance Payment Exchange of Retention

SAUDI RIYAL

Interim Payment Application Final Payment and Release of Retention REFERENCE NO. : IPA-011 APPLICATION NO. : 011

PROJECT TITLE : P6 ABHA ENTERTAINMENT COMPLEX PERIOD : 4-Sep-24 CLIENT : SAUDI ENTERTAINMENT VENTURES

PMC : KHATIB & ALAMI

MAIN CONTRACTOR : MORDERN BUILDING LEADERS

MEP CONTRACTOR : INNOVATIVE CONTRACTORS FOR ADVANCED DIMENSIONS Original Contract Value : SAR 247,250,000.00

Variation Orders : SAR 0.00

Revised Contract Value : SAR 247,250,000.00

CUMULATIVE PREVIOUS THIS PAYMENT

(SAR) (SAR) (SAR)

Value of Works Executed

Value of Works executed against Original Contract 89,734,196 46,715,962 43,018,234

- -

Value of Works executed against Variation Order - - - TOTAL GROSS VALUE A 89,734,196 46,715,962 43,018,233.8 VAT In Saudi Riyals 15% B 13,460,129 7,007,394 6,452,735 APPLICATION VALUE INCL.VAT (A+B) C 103,194,325 53,723,356 49,470,969 RETENTION RETAINED 10% D (8,973,420) (4,671,596) (4,301,823) RELEASED E - - -

ADVANCE PAYMENT 13% 32,007,203 0

ADVANCE PAYMENT RECOVERY + Incl.Vat15% 13% F (13,358,793) (6,954,638) (6,404,155)

-

OTHER DEDUCTIONS 0% G - - -

TOTAL REDUCTION (D+E+F+G) H (22,332,213) (11,626,235) (10,705,978) NET VALUE OF WORK CERTIFIED (C+H) 80,862,112 42,097,122 38,764,991 NET AMOUNT PAYABLE AMOUNT ( I ) 38,764,991

In Words: Saudi Riyal Thirty Eight Million Seven Hundred Sixty Four Thousand Nine Hundred Nienty One Only

"All sums claimed in the statement as due and payable to the contractor are propoerly due and payable to the contractor" Prepared & Approved by:

Anwar Saymouaa Wael Salem Hameed Fasahath

Regional Director ELV Project Manager Commercial/Contracts Manager Sudheer Abdulla Mohannad Abu Shehab Mohamed Khalil Kebida MEP Division Director MEP Project Director MEP Project Manager Note: This is not a VAT invoice – on receipt of the Payment Certificate an official VAT invoice will be submitted which shall include the Company’s VAT Registration No. and shall the VAT amount be shown separately. Certificate Type Contract Currency

Page 1 of 2

Innovative Contractors for Advanced Dimensions

Commercial Re gistration – 403*******

P.O. Bo x: 117188, Je ddah 21391, KSA

: +966-**-***-****

: +966-**-***-****

: info@ic ad.c om

www.icad.com

Ref: ICAD-J0447-P6-MBL-COM-0117

Date: 26-Dec-2024

Modern Building Leaders (MBL)

Elite Building, 5th Floor,

Jeddah, Saudi Arabia.

To: Mr. Mohammed Kotb (Sr. Project Manager)

Subject: Notification for EOT under Delay Drawing & EI – Upon receiving New Seepper Package related to LVSG. Dear Mr. Kotb,

Reference is made to the above subject, for the event occurred up to the date of signature of this contract EOT Brief:

Following to the receipt of Code C regarding the 10Nos’s LVSG panels (Ref Attachment: 1) were submitted as per the existing IFC package are required to revise/reproduce and re-submit due to not considering the additional load for Seepper, Kiosk package against the transmittal reference KAA-TRANSMIT-002772 & 6ABHA-08-KAA-PM-ENI-00045 for which ICAD has received IFC without Load detail on 26 November 2024 (Ref Attachment: 2) has left out ICAD not to proceed with scheduled delivery of LVSG panels on 20 January 2025. In order to tailor the New Requirements (Seepper and Kiosk Package) received from SEVEN/MBL, it is important to record that the above-mentioned LVSG panels will be unavailable on 20 JAN 2025. Thereby, ICAD will entitle the route of EOT for the event occurred during this window. 1. New IFC for Seepper & Kiosk received without LOAD detail and therefore ICAD assumed to receive the load detail IFC by end of Dec 2024 which will have direct impact on project completion timeline from its original duration and (Ref Attachment :3) which are in the pipeline of submission and approvals of feasibility study, preparation of shop drawing, calculations (panel board schedule),panel fabrication drawing, manufacturing of panels and delivery followed by installation, testing, commissioning and handover with documents. 2. To an explicit this is exceedingly depending upon the approval of shop drawing but not limited to the impact on already furnished panel board with circuit breaker shall be used partially/replaced with new breaker ratings as per the final demand load requirement approval. 3. Owing to this event occurrence, ICAD would like Inform that all previous submitted Manufacture/Shop Drawings related to LVSG panels will become abortive and any incurred cost will be reimbursed by providing proper substantiation shortly.

Pursuant to Sub-Clause 3.3 (Instruction of the Engineer) with EI reference No. 6ABHA-08-KAA-PM-ENI-00045 (Ref Attachment 4) are instructed to proceed with execution of additional items in accordance with the new IFC. Thereby ICAD will submit all the supporting documents for evaluation and proceedings under the contract sub-clause 13.3

(Variation Procedure)

Page 2 of 2

Innovative Contractors for Advanced Dimensions

Commercial Re gistration – 403*******

P.O. Bo x: 117188, Je ddah 21391, KSA

: +966-**-***-****

: +966-**-***-****

: info@ic ad.c om

www.icad.com

Thereto pertaining on that ERE (Employers Event), ICAD waves its rights to draw your attention to General Condition of contract under clause 1.9 (Delayed Drawings or Instructions) contractor shall be entitled subject to Sub Clause 20.1

(Contractors Claim)

(a)an extension of time for any such delay, if completion will be delayed, under Sub-Clause 8.4 (Extension of Time for Completion); and

(b)payment of any such Cost, which shall be included in the Contract Price. Hence detailed Statement of Contractor’s Claim Cost assessment will be prepared by the Contractor for submission demonstrating the Contractor’s Claim under sub clause 20.1 in line with Extension of Time and cost towards Project Completion.

This is the formal notice to MBL regarding claims

ICAD remain committed towards successful project delivery. Attachments:

1. Received Code C for 10 No’s LVSG panels.

2. New IFC Seepper & Kiosk Package received without Load detail IFC via email dated on 26November2024. 3. Time Impact Analysis (Current Window).

4. Engineer Instruction - 6ABHA-08-KAA-PM-ENI-00045 (Additional power & light current outlets and plumbing connections).

Mohannad Abushehab Hameed Fasahath

MEP Project Director Commercial/Contracts Manager

6

Portfolio pages

Portfolio Pages

Technical Qualification

Bachelor of Engineering (Duration 3 Years)

Department - Electrical and Electronics Engineering

Technical Diploma Engineering (Duration 2 Years) Department - Electrical and Electronics Engineering Expertise Area & Professional Skills

1. Manage Commercial/Contract 1. Auto CAD

2. Cost Control 2. Microsoft Office

3. Planning & Program 3. Primavera P6

4. Auditing 4. QMS-ISO 9001: 2005

Lead Auditor

5. Designing 5. Revit - MEP (BIM)

6. Procurement 6. Plan swift

7. Tendering

8. Estimation

9. Site Execution & Co-ordination

10.Quality Assurance & Control

11. Health and Safety

ICAD

Prepared by: Hameed Fasahath

2

Why I deserve?

I have a perfect blend of Professional Qualification and Professional Experience with proven records.

Achievements & Milestone

• Directly Managed 8 QS Engineers

• Awarded Re-measurable project by providing nearest Cost Estimate via analyze, feasible study & risk assessments.

• Nominated Najm Employee in Middle East region – Al-Futtaim Group. Work Breakdown Activities in P6 Abha Project

Quantity Surveying

• Project Quantity Take-off.

• Prepare and Submit Variation Order.

• Quantity Comparison between IFT, IFC and SHD

• Ensure & compare between E2b Log vs MRF Log vs JAF Quantity.

• Prepare and submit MTO whenever necessary.

Payments

• Prepare Interim- Payment Application. (Including ELV and MEP)

• Review Interim-Payment Certificate. (Including ELV and MEP)

• Follow up all entitled payments.

• Record pending payments.

• Prepare and Submit Petty cash.

• Rate Analysis for New Items

• Prepare and Propose Percentage Breakdown.

• Sub-Contractor Payment assessment and certification.

• Prepare earned share value between MEP & ELV.

3

Contract Administration & Documentation

• Identify Potential Entitlements upon events.

• Draft Contractual Letter Correspondence accordingly with suitable contractual clause.

• Read Contractual Obligation and Notices.

• Ensure proper project documentation and document control.

• Drafted subcontract work agreements whenever necessary. Procurement & SCM

• Record MRF to PO issuance procedure.

• Update Procurement E2a Log periodically

• Update E3 Log (Samples) periodically.

• Ensure Material Delivery.

• Record Material reconciliation statement.

Cost Control

• Periodical update on BTC, BAC, VO and Revised Budgets.

• Update Cost Code to its respective BoQ reference.

• Monitor Planned (JAF) and Actual Value.

• Advise on forecast cost plan according to the project nature.

• Ensure to mitigate the financial risk.

• Prepare Cash Flow

• Prepare Project KPI

• Prepare Commercial Statement.

4

Planning

• Initiated progress monitoring procedure.

• Ensure daily progress and compare to Cost BoQ

• Ensure DPR prior to Client Submission and advise on comments if necessary.

• Follow up Site Progress and Ensure WIR is done in order to reflect in Progress Claim.

• Prepare project Risk Register.

Quality

• Ensure proper documentation work.

• Technically sound and effective communication with upstream and downstream.

• Advise on WIR an MIR Submission.

• Drafted Method statement, ITP and Project Quality Plan according to Project specification.

• Ensured Risk assessment as per project and safety requirements.

• Guided Juniors to improve the quality of workmanship and work procedure in accordance with project requirements. General

• Prepare and provide Project Construction & Commercial Progress Summary to management.

• Prepare and provide Project Commercial Progress Summary to management.

• Prepare and provided progress presentation of progress and payments.

• Prepare and provided Management Summary Report.

5

Project Highlights

Consultant Role

CORDEROY INTERNATIONAL LIMITED – (INTERNATIONAL COST CONSULTANT) We are Ministry of Finance approved Cost Consultant – Position held (Senior MEP Cost Consultant) 1. Previous Project – Masjid Al Haram – Confidential Cost in Billion Dollars 2. Makkah First Ring Road – Infra Works – Cost Confidential in Million Riyals Main Contractor Role

ALFUTTAIM ENGINEERING AND TECHNOLOGY – (INTERNATIONAL CONTRACTOR) We are Main contractor for MEP works - Position held (MEP QS) 3. Project – Jabal Omar Development Project Phase 3– 369 M SAR

4. Project – Jabal Omar Development Project Phase 4 – 680 M SAR

5. Project – Business Head Quarter Jeddah –Fit-out Works Client Representative

EMIRATES TRADING AGENCY (ETA- Properties & Investments) – (INTERNATIONAL CLIENT) We are Client for Real Estate and Property Development - Position held (MEP QS) 5.Project – Anand Citi Center Holdings – 110 CR INR 6.Project - Astra Properties – 15 CR INR

439***-******

06 March 2021 1442 ͚ͣ̚ 23

ͷ ̡̻̺͙ ௪௬̗̜ ͳ̗ ͳ̜̓ ̴ .Ͳ ͡ ̻̜̺͙ ̻̮̓ ͳ̗ Ͳ௬͙̽ ̗͙ .Ͳ ̡ͣ̓ ௬̼ ̻̜̻͡ ̴̜̠̓̓̓͜ ͡ ௬̻̜

̠̼͂̽͡ : ͮ ௬̢̼ ௪̺͙

͂௬̗̓ͅ ̹̾ ̠̼͂̽͡ : ̢̞ͧ ௪̺͙

HAMEED FASAHATH MOHAMED

NISHAR

Classification: Engineering

Specialization : Electrical Engineering

7

Membership & Professional Certification

MRICS - APC Journey - Membership ID - 6939796 (Active)

Saudi Council of Engineering - Membership ID - 439890 (Active) Technical

Electrical Energy Audit Electrical Load

HVAC Design and Drafting CCTV - System

8

Construction Claims

Claims in FIDIC Schedule Delay Analyze

MRICS – APC Structured Training Program

10

Quantity Surveying & Estimation

Revit MEP

Plan swift Revit MEP BIM Modeling

11

Contract Administration & Practice

Contracts Management - FIDIC Rainbow Suite of Contracts Contract Management

Construction Technology

Managing Contractual Risk

9

Project Management

Planning & Cost Control Primavera P6

Procurement & SCM Health & Safety

Project Management - PMP

12

Quality Assurance & Control – Audit

Quality Management System – ISO 9001:2015 Lead Auditor – IRCA-UK Lean Six - Sigma Black Belt Lean Six - Sigma Green Belt AUTHORIZED SIGNATORY

AUTHORIZED SIGNATORY

THIS IS TO TO CERTIFY THAT,

MR. HAMEED FASAHATH

STUDENT ID: NKMBIM202

HAS SUCCESSFULLY COMPLETED 6 DAYS OF WORKSHOP ON

"CONSTRUCTION PROJECT PLANNING & BIM TECHNOLOGY"

AS PRESCRIBED AND DESIGNED BY NKM PLANNING SOLUTIONS AND BIM MANTRA CONSULTANT

DATE: 6 SEP TO 11 SEP 2021

EMAIL : *********@***********.***

EMAIL : ************@*********.***

VISIT US ON: WWW.NKMPLANNING.COM

VISIT US ON: WWW.BIMMANTRA.COM

CONTACT :

+91-779**-***** /

+91-883*******

C E R T I F I C A T E O F A C H I E V EMENT

Hameed Fasahath

ENSAVEID ES 21669

https://ensaveindia.in



Contact this candidate