Imran Shaukat Khattak
MECHANICAL ENGINEER
Gulraiz 2, Rawalpindi 46000, Pakistan +923********* ************.*********@*****.***
PROFESSIONAL SUMMARY
Seeking a job as a mechanical engineering where I can use my extensive knowledge to help your organization achieve its goal of excellence in the mechanical engineering industry. WORK EXPERIENCE
[08 /2024 – 09 /2024]
Adams Fire And Tech PVT LTD-PAKISTAN
Mechanical Sale’s Engineer
Served as Mechanical Sale’s Engineer And Technical Supervisor: Projects supervised:
Jacaranda family club (fire sprinkler system & addressable fire alarm system)
PepsiCo Hattar (maintenance of fire extinguishers)
Bahria university h-11 campus (fm200 suppression system)
Habib bank ltd (HBL) Centaurus branch (conventional fire alarm system)
[10 /2023 – 11 /2023]
OGDCL PLANT DAKHNI-PAKISTAN
Mechanical Trainee Engineer (Power & Plant)
Oil and Gas Development Company Limited Construction Project for Pipeline of Processing Plant at Oil and Gas Development Company.
Served as Mechanical Trainee Engineer
Activities:
HSE (Tool box talk, PPE, Work Permits)
Tools:
Hand tools, Power tools, Measuring tools.
Hot Work Activities:
Grinding, Cutting, Drilling, Bevel Preparation etc. Documents:
Isometric Drawing: (Size of pipe, pipe direction, Valves, Gas kits [Metallic and Non-Metallic, Ring type for high Pressure and Feral wound], Nut bolts, flanges of blind, spade, spectacles, Plug, elbow 450and 900, spool, Support Structures) etc.
[08 /2020 – 09 /2020]
OGDCL PLANT DAKHNI-PAKISTAN
Mechanical Leadsmen (Intern)
Oil and Gas Development Company Limited Shut Down Project for Gas Processing Plant with 3rdparty contractor: (SKM Engineering and Construction Company).
Activities:
HSE (Tool box talk, PPE, Work Permits)
Removing And Installation of Spools:
(Flanges of Main Way Vessels, Columns, Gate Valves, Ball Valves, Butterfly Valves, Globe Valve, Plug Valve, Demister pads, Flushing, Heat exchangers)
Assisted in the installation and troubleshooting of mechanical equipment, ensuring adherence to safety protocols and efficient completion of projects.
Collaborated with senior mechanical engineers on design and fabrication of components, contributing to the development of innovative solutions for complex engineering challenges.
Conducted regular inspections and maintenance of mechanical systems, identifying and addressing potential issues to prevent costly breakdowns and maximize equipment performance.
Coordinated with project managers and team members to streamline workflow and meet project dead lines, resulting in successful completion of multiple projects within tight timelines. EDUCATION
BSc Mechanical Engineering University of Wah
[2023]
FINAL YEAR PROJECT
Development and Mechanical Testing of Fiber Reinforced Nylonfor 3D Printing.
The purpose of this project is to make a fabricate a Nylon thread in order to strengthen the work piece made from 3D printer. This project is converting a Nylon, carbon and other different composite to make strengthen composite for 3D printing material to use in our daily life and as an alternative for industrial applications. ACADEMIC PROJECTS
• Investigation of Landing Techniques of Athletes during Long Jump using FEA.
• Experimental investigation of thermal energy storage tank with solar thermal applications.
• Water Level Detection System
FSc Pre-Engineering (HSSC) Cadet College Wana (SWA)
[2017]
Matric (SSC) Army Public School and College System Bahawalpur Cantt
[2014]
CERTIFICATES
[09/2023] Technocrats Institute of Occupational Safety and Health Institution of Occupational Safety and Health
Managing Safely
[9/2023] Project Management Institution
Project Management Foundations
Project Management
SKILL
• Problem-solving abilities
• Advance computer and technical ability (SOLID WORKS, AutoCAD, MS Office)
• Knowledge of machines and fabrication processes Leadership ability.
• Primary point of contact for client technical issues related to mechanical systems.
• Diagnosed and resolved equipment issues, ensuring client satisfaction.
• Collected client feedback, providing insights to engineering for improvements.
• Worked with design teams on recurring issues and enhancement suggestions.
• Maintained and improved technical support resources.