- SIBNATH GUPTA
F-*, Anuradha, Neelachal Abasan cooperative society, 98 Rajdanga Gold Park (N), Kolkata -700107;West Bengal;India
Cell: +91-983*******; Res: +91-33-244*****; Email: *******@*****.*** ;
***.*****@*****.***
Present mobile contact NO: +91-983*******, Kolkata, India. & email as above.
PROJECT MANAGEMENT PROFESSIONAL / CIVIL-Structural PROJECT CONSULTANT
Contract Management, Resource & Material Management, Business Logistic & Community Development
Project Management ● Project Consultancy ● Quality Assurance & Control,PROJECT Environment, Heal th &
Safety Compliance ● Vendor Management ● Client / Customer Relationship Management ● Team Management
Synopsis: Accomplished Civil Engineer and techno-commercial professional with over 48 years of experience including 30years of international exposure.
Sound working experience in Civil- structural (RCC & Steel) Project Reviews, appraisals & construction Management - CDM of metal, mining, cement, oil & gas, etc. including industrial process & utility structural-heavy duty Foundation, structures & Industrial building(substation, office, raw material, manufacturing, Utility etc), structure, housing (Residential, commercial, educational & health clinic & hospital) & infrastructure construction of water reticulation (Domestic Industrial process & cooling). Roads & Highways with SWD /rcc,pcc,stone pitch .Bridges. culverts Tunnels./cut & cover,tbm, NATM-Sem Scl,stabilize soil rock by rock bolt or soil nail etc. surround tunnel structure; Telecommunications/ microwave links, GSM communications with Towers, Equipment rooms, Stand by power Gen-set or solar and Earth station. VSATS & all utility services including Air conditioning, lighting, cable trenching and laying cables max size up to 250 sq.mm, underground fuel tanks for gen-set etc. Please be noted NATM-New Austrian Tunneling Method which is referred as sequential excavation method/ SEM, shotcrete or sprayed concrete lining / SCL is the modern design & construction methodology complying expertise( soil & rock classification) monitoring & optimize various wall reinforcement technique based on type of rock or soil encountered as tunneling progresses providing necessary anchorages of suitable designed soil nails or rock bolts to create structural stability foĺowed by final waterproofing & shotcrete finish etc.
Multi tasking skills in steering the entire project management activities and ensuring delivery of functional product quality or service within assigned time, quality and budgetary parameters including advanced planning of CSC(orSCM) with effective multi supplier procurement & supply logistics with execution, monitoring & control will be preferred choices avoiding project performance delays.
Positive-endurance skills in feasibility study, engineering & quantity survey, civil & structural designs, reviewing working drawings, BOQ, item-rate analysis, cost estimations, etc. with familiarity of STAAD PRO-design etc.
Expertise in tendering, adjudication & contract award with the process of advance payment for mobilization, equipment's TEST for safety and ensuring control of cost variances & index by analysis, evaluation & judicious use of manpower, machinery, materials, Methodology, money. Maintenances, Timely measure of Revenues & Recoveries with assessment of CDM, RAMS & mitigation of risk management with project constraints- Time, cost, Quality & balanced Stake-Holders management to involve in Risk mitigation from project beginning followed by resilient sustainable handover to client.
Well versed in STD-ISOs, codes of practice, ensuring safety compliance at site and emphasizing on echo-environments up gradation activities during project execution by improved air quality, reducing wastage & recycling of water, improved building materials quality, energy efficient to achieve sustainable construction process/ CDM/LEED with applicable FIDIC format of contract conditions.
Adroit in attaining zero fatal accident site & achieved by safety audit of BSC-London, executing activities in compliance with quality control and conducting material quality inspections / tests in adherence to quality assurance and inclusive of overall Internal Technical Audit of Civil-Structural works(design, contract & pmc.) ;associated MEP works executions with quality control, also associated HVAC works executions with quality control / assurance to achieve right quality of Project deliverables required for customers satisfactions.
Adept in authorizing daily expenses incurred, controlling bank-account transactions as an Authorized Signatory & managing mandatory requirements of internal & external audits of accounts.
An efficient communicator and team player combining sound coordination, interpersonal, problem solving & liaising skills with analytical and leadership capabilities to enhance organizational object
... Sincere Analytical professional acumen, decision making with strategic thinking & corporate value,Negotiation,Entrepreneurial, Organizational &.Interpersonal skills, Judicious oral & written Communication skills, Creative,Problem Solving, Trusted Leading Mentorship to achieve set goals following company's policies & procedures & the creation of Quality products or services with stipulated job specification compliances, persuasive, proactive, & diplomatic attitude with ensuring protection of all activities of SHE & Labor-welfare inclusive of Traffic-Engineering safety with right CDM & RAMS, monitoring by stipulated time & budget or for Sponsor's update feedback by measuring the cost Variances of EARNED VALUE management & finally controlled by total 09(10 now) knowledge areas and 42(49 now) processes (each process have 05 process groups- initiating, planning, execution, monitoring & control, close up )as per PMBOK-4th & 6th edition guide recommended by PMI-USA.
detailed enclosed.cv for more subjective information. It may please be noted for project management we shall have to choose a methodology depend on size & type of project based on Agile or PMI philosophy for governing principle practices & procedures to apply with chosen methodology to create value.of deliverable/ services to achieve strategic benefits of targeted measurable objectives of company stipulated policy & procedure .
Here is considered scrum methodology With monthly sprint time box normally reviewed on daily basis with teams for corrective actions till one month & at end of the month another prospective
New program added with incomplete jobs if any till project completion as it is an iterative process. & it contains five values- commitment. Courage. Focus. Openness. Respect with core team of min. 10 members. Any way it needs to consider stakeholders requirements with possible risks if any to make required changes at all the time which is possible to accommodate in this process as it is valid for a month only.
EXPERIENCE: : Rodic Consultant. Delhi. Frm. April2021 to April2022
Responsible & performed as sr. Consultant. Team leader. Sr. Contract specialist. For pwd. Chhattisgarh .ADB Road project/ 8packages. 232 km state highways & MDR. Project management supervision of quality compliances of work done with used materials.machineries.manpower manpower.& budgeted cost control & variations.IPC of contractors claims with client liason as pè BOQ contract monitoring & control inclusive of all design approval of road profiles. Cross sections. & necessary DPR structural designs along with justification & grant of EOT to contractor jointly with client followed by environmental & all safety protectìon to creae value of energy efficient place to win all stake holders satisfaction.
RE:GEN:TA, ORKO'S,KOLKATA/BY ROYAL ORCHID HOTELS LTD ( JV WITH SEN GROUP OF HOTELS -.DELHI & KOLKATA):
Responsible & performed as Consultant free lancer for the hotel's new roof top Banquet -approx 3800 sq.ft.( Disco dance floor approx. 2000 sq ft. With Disco lights, soundproof,centrally air conditioned.with bar &.restaurant facilities etc. With full glass roof completed with sll utilities.already completed & handed over for customer's use & design & drawings of 200 sq ft. Area, Fire-Safety evacuation platform at roof level approx18 meter height. at present ready for Construction. WORKING From April. 2019 to April 2021
Professional Experience : LEA Associates South Asia Pvt. Ltd. (A LEA Group Company Consulting Engineers & Planners )/ New Delhi & overseas Canada & Africa.
Consultant / Project manager & RE for the Road project in Ethiopia.; From April,2018 to March.2019
Working for consultancy services of construction supervision of Mombasa-Nairobi- Addis Ababa Road corridor phase III contracts, Hawassa- Ageremariam road project contract -2:; 60km CHUKU- YIRGACHEFE ; project management of supervision works of contractor awarded as per contract with ERA (Ethiopian Roads Authority) Was responsible & performed with compliances of Quality & cost, within stipulated time & no cost overrun with due protection of safety, health & environment degradation . Review project design drawing with approval, day to day works,Quality assurances, monthly progress review, consultants monthly Invoice, Interim contractors payment review & certification, project related issues like program of works, financial issues with advice of Head office, handing over certificates, defects notification certificate followed by Certificate of Final Statement. Etc. Project construction cost/60 km/ETB-882, 908, 838 (85% in usd-26,802,590; 15%-ETB-132,436,326 AND Supervision cost of LASA-/ETB-10,306,414 (usd-2,153,228) both are funded byAfrican Dev. Bank. Achievement recorded as approved progress 30 km Black Top. with 4nos TUNNELS( each @ 1.5 km to 2.5 km) 3nos completed, 6nos major bridges(one completed . 4nos under construction) & 35 nos culverts( 4nos box, 15 nos pipe completed & others under construction). SWD-40 km ( rcc & stonepitched. 60% completed & balance under construction.); & 24 km black top completed.
Sen Group of Hotels / Delhi, Kolkata- India.
Responsible & performed as Consultant Free Lancer for the hotel’s renovation and extension supervision of quality, cost & safety issues within stipulated time with start planning, go, feed-back, check jobs for another two Banquet & Roof top restaurant inclusive of Structural designs & working- drawings with glass roofs with all utilities. HVAC. MEP .Fire safety etc with 4-star facility services completed to win the satisfaction of stakeholders. From March,2017 to March 2018.
AARVEE Associates architects engineers & consultants Pvt. Ltd./ Hyderabad- India- as Consultant/Project manager & RE : From Oct. 2015 to Till Feb. 2017:
Working in awarded project of TANROADS in Tanzania / Upgrading of Tabora- Koga-Mpanda Road (350 km) to Bitumen Standard Lot 1: Tabora Sikonge Section (30 km) ; project cost- USD 14.323Million. & Consultancy services for construction & Upgrading to Bitumen Standard Lot1 : section Tabora Sikonge (30km) ; cost : USD637,000.00
Delegation of the following authority & responsibilities & tasks performed:
-To review the project designs & drawings furnished by the contractor for their conformance to the specifications & standards.
-To review the Environmental Management Plan( EMP) & Resettlement Action Plan (RAP) submitted by the Contractor.
-To contractors day today works for their compliance to quality as per the approved Quality Assurance Manual
-To prepare all the reports as per the Terms of Reference of Consultancy Agreement.
-Conduct & Chair Monthly Progress review meetings.
-To prepare & submit consultants monthly Invoices.
-To scrutinize & certify the contractors Interim Payment Certificate (IPC)
-To liaise with the client on all the project related issues including issues those have financial implication.
-Issues related to determination of Extension of Time.
-Instruction for variation to the works contract.
-Issue of taking-over certificate to the contractor.
-Issue of defects liability/ defects notification certificate. -Certificate of Final Statement.
Accomplised- 16 km black top completed with 7nos BOX CULVERT & 18 pipe culverts out of total 56 nos spread over 30 km. . Balance are undé construction.
Yongma Engineering Co. Ltd/Delhi/ Sr. Project Manager/ Project Director.: From Nov.2013 to Oct.2015:
Detailed Task assigned- Supervision of works contract to ensure that the works comply with approved design, drawings, specifications. Condition of contract and sound supervision practices. ; Approval of contractors working drawings; Implement & comprehensive report every six month on the environmental & social management plan; Preparation of final construction report & as built drawings of all completed works; Preparation of the project completion report.; Supervision of maintenance activities during the defects liability period. TASK PERFORMED as mentioned below:
Project : Consultancy services for Authoritys Engineer for supervision of widening of existing single lane to Double lane with paved shoulder from km256.880 to km296.515 of NH-59 in Odisha State in EPC. Mode ; Length-30 km; Project Cost-INR 110 cores; worked as Authority Engineer and Team Leader . Accomplished 12 km black top complete & two major bridges 16 nos pier piling works with abutments under construction. Completed 5nos BOX CULVERTS & 10 pipe culverts out of total 46 nos. Others construction ongoing.
Project :World Bank funded design & construction supervision of Disaster Recovery project, DSC-04 & length 450km of 2lane road works under FIDIC condition of contract & icb, in the state of Uttarakhand. Client-PWD,Govt of Uttarakhand; Funding: World Bank; length: 450 km ; Project Cost: INR 220Cores.
Project : Consultancy services for preparation of Feasibility study & detailed Project report for2 lane, state highway of 290 km on DBFOT basis( PPP Project) in Rajasthan State.
Client: PWD, Govt of Rajasthan.; Funding: DBOFT basis (PPP Project); Length: 290 km ; Project cost: INR 580 Cores.
Project: Consultancy Services for preparation of Feasibility study & detailed project report for2 lane, state highway roads, length325 km on DBFOT basis (PPP Project) in Rajasthan State.
Client: PWD, Govt. of Rajasthan ; Funding: DBFOT basis (PPP Project); Length: 325 km.; Project Cost- INR 650 Cores.
Project: Consultancy services for preparation of Feasibility study & detailed project report for 2lane, state highways, length 174KM on DBFOT (PPP Project) in the Rajasthan State(package-EwcN
Client & Funding: PWD, Govt. of Rajasthan.; Length: 174 km. ; Project Cost: INR 350Crores.
Project: Consultancy services for preparation of Feasibility study & detailed project report for 2 lane, State Highways, length 213 KM on DBFOT basis (PPP Project) in Rajasthan State/ package-9.
Client & Funding : PWD, Govt. of Rajasthan; Length: 213 km.; Project Cost: INR 426 Cores.
Project: ADB Funded Construction Supervision of widening & strengthening for 2 lane of Gurgaon Chandu Badli section from km 18.20 to 39km. of length20.8. km. in Haryana State.
Client: Haryana state Roads & Bridges Development Corporation Ltd.; Funding: Asian Development Bank; Length: 20.80 km./ 2lane; Project Cost: INR 93.83 Cores.
Sens Group of Hotels /Kolkata & Core Engineering & Allied Services, Kolkata- From Sept,2010 to Nov.2013, on Free LANCING basis at Calcutta, with client's
approval as an Independent technical Consultant, examined with clear objectives & evaluated the TECHNICAL & functional quality of project deliverables & recommended the necessary corrective actions on reports of findings being implemented immediately & necessary controls for future also /FOR 3-STAR HOTEL STRUCTURES (7 storied )& other Construction at Kolkata . Position: Independent Consultant.; Tasks Involved and performed are mentioned below:
-Responsible for project site visits & guide, supervise, coordinate & monitor the work of other experts in the team as well as those of the concessionaire.
-Ensuring that the construction works are in accordance with the technical specifications including use of construction plant & equipment.
-Review all designs & concrete mix designs proposed by the contractor, Make independent measurements & check all quantity & quality & calculations needs for the payment purpose.
-Verification of quantities of all items in the BOQ & suggest modifications for the approval of the Employer.
-Monitor & check the day to day quality control keep all measurement records, Direct the contractor in all matters concerning the construction safety.
- Assisting in preparation of construction Supervision Manual & Maintenance Manual in consultation with the employer.
-Assisting in preparation of monthly & quarterly progress reports, also assisting in preparation of Project Completion Report. Accomplished one Design Build banquet hall-180 sqm. at ground level with all utility. Facilities & HVAC.& MEP. Fire safety complete to win satisfaction of owners.
Chemical Africa Mines,(Chemaf S.P.R.L.) Lubumbashi, DR Congo (Appointed by ACE Ltd. FZE, Sharjah,
UAE);Head of Civil (Aug 2009 Aug. 2010) -12months
Key Profile: Project management plan & processes-PMP(Life cycle/ Construction :Feasibility, scope, Planning, Design, Production/ Execution, Turnover/ Monitoring & control, Close up/From start to Handover ) for materials resources, supply, processes & operations of RMC-plant(20 & 45-60)cum/hour or transported by 6 nos of transit Mixture audit with monthly project appraisals & cost benefit ratio maintained -2 of civil works, steel structures, MEP & HVAC works with std.QA /QC of products & services to the satisfaction of the End users for above Project support services & below Production plant projects with all infrastructures & utilities facilities for right quality construction project deliverables in time & budgeted cost,monitoring contract administration, site visits, cost accountability. Responsible for PMP of EPCM contract of Cobalt EW/SX Plants (6600TPY)& 1200KVA MRS & NEW Sub- station(1no) with 5nos Transformer foundation, electrical cut-outs & trenches, false floors, rectifier & battery rooms etc), achieved engineering & structural design & drawings of rcc structures of sub-stations, plant floors etc. at CHEMAF SPRL / Lubumbashi, D.R.C. and ACHIEVED project deliverables accepted by end users.
Ensured safety, Achieved zero fatal accident & loss of injury time (LOIT) Assessed echo environment and met of cobalt / EW, SX Plants & inclusive Infrastructure(52km ROADS & SWD-cost Inr 211 croes, water supply & distribution) construction & maintenance etc. Achieved engineering design, drawings & executions of old & new Strom water drains at optimum functional level to avoid FLOODING OF PLANT ROADS(Inside & Outside) in Rainy season (Huge water flow from surrounding Hilly area towards the Chemaf plant / Usoke was controlled .) Copper ores are hauled by 40 ton-Tippers from Mine to Plant- Usoke/6km long, width 10m(2lane cw-7m + shoulder-3m) /Asphalt concrete(4.5% bitumen by Wt.) surfaced road (Flexible paving) constructed by Chemaf and maintained by departmental machineries & workers for all repairs(patching etc.) whenever identified .
Haulage & access roads construction & all weather maintenance for Usoke plant-( 12km long RCC road, width 10m/2lane was constructed by M20 & repaired by M25 GR. Concrete, Rebar Tor-8mm@200 mm c/c one layer with reinforced expansion/ contraction joints(sealed by sand-bitumen mix. as specified ) provided for each designed panel area (30-36 sqm.) of thickness 200mm, followed by Rd-camber slope 1.8-2% towards the SW Drains.
Sub-station building (4storied) constructed with office area 4000sft only at the top floor of building .
In addition to civil works, structural-work shop steel structures with gantry crane, Pipe racks frames, tanks etc.; Mech. Elect. & plumbing(MEP)-Equipments(cobalt cutting & polishing machines, DM Plant, WT Plant,Pumps etc.) ; Electrical Control paneled,transformers, generators,AC- Main supply & distributions with MCBs & with specified cables, earthings & earth pits etc. ; HVAC (High ventilation air conditioning ) with installation of 2.5tons split air conditioner dividing the room space/vol according to manufacturers supplied specifications / central air conditioning systems, Plumbing- MS pipes flange bolted joints for industrial water, slurry etc & welded joints for industrial gas etc. mainly installed in the project including overall supervision of fire-protection equipments installations in controlled room, paneled rooms and electrical trenches etc.
Konkola Copper Mines Plc, Chililabombwe, Zambia (under management of VEDANTA PLC-London)
Head of Civil (Sep 2006 Apr 2009) -2years 8months
Key Profile: PMP-Cycles,of material resources supply & operation of RMC(Ready- made concrete) plant for concrete-supply at site & Crusher plant for aggregates & crusher dust supply for concrete preparation and water from water mains with suitability tests of concrete production and concrete supplied at site by Transit mixtures of capacity 6 cum per trip.
Responsible for REVIEW DESIGN & PMC of engineering, procurement, construction management of New CU-Concentrator Project; 6 MTPA-GRINDING mill capacity was constructed over an area of 36000 sq m with RCC poured 18000 cum and reinforced steel used 1800 MT with total fabrication and erection of steel structures used 1200 MT (Inclusive of Piping & Tankages etc.); total cost of plant $82 million &civil works cost about $18million inclusive cost of 2500 no RCC piles (Dia:500mmx12m deep/each) execution of in situ RCC pile driving as per typical layout drawings using pile-rigs etc. by Dura Pile Co./ South.Africa.
Total job including pile design modification Achieved in 05 months and handed the site to civil contractor, The Concentrator consists of BELOW units & Achieved mechanical completion in1.5 year as was responsible as owners Engineer to hand-over to end user (Plant Operation dept.).underground conveyor tunnel 400m for transporting crushed ore supply to Ball & sag miis constructed to meet operational need.
Materials/ ore Handling System /Tipper conveyors & hopper tunnels. (High rise steel structures-fabrication inspections followed by supervision of transport, handling, erections of above structures- used to stock-pile copper ore over & around Hoppers, later pushed in hopper by dozer/ wheel loader. )
Conveyor Galleries Steel structures fabrication inspections followed by supervision of transport, handling, erections with installation of motors/ pulleys, belts etc, test-run with specified slopes/elevations
etc.
Grinding and Milling Plant- Supervision of transport, handling, safety, erections of Ball & Sag mill with heavy duty motors, gears, Holding down long bolts made of EN-90 Steel placed within M.S. Sleeve &
Erected by using 800 tons capacity crane, followed by epoxy grouting .
Floatation Plant – Main Plant consists of flotation tanks supervision of transport, handling, erections with pumps, pipe lines etc with specified levels inclusive of fabrication inspections.
Reagent Preparation Building Steel structures fabrication inspections, supervision of transport, handling, erections with gantry cranes, mixing tanks, pumps etc.
Compressor Blower House- supervision of heavy duty compressors erections etc .Regrind Mill and Tailing Pumps- supervision of erection of Regrind mill and talling pumps with ms pipes etc.
Concentrate Line/ms pipe 30cm dia. on pipe Rack-supervision of fabrication & erections approaching to thickener inclusive & final concentrate produced from Larox Filters and used for manufacturing copper metal recovery more than 98% by standard .production processes.
3 No sub-stations.(2 storied ) MEP & HVAC WERE INSTALLED similar types equipments AS described in CHEMAF/DRC above & 1000m3 capacity process & cooling water tank with supply & delivery pipe lines pumps. inclusive of Internal technical audit with monthly project appraisals & cost benefit ratio maintained>2 of civil works, steel structures, MEP & HVAC works (Quantity surveying )QS/(Quality assurance & control)QA,QC of construction products & services to the satisfaction of the End users for above executions.
Project support services & above Production plant projects with all infrastructures & utilities facilities for right quality construction project deliverables in time & budgeted cost,monitoring contract administration, site visits, cost accounting of R/A & Final claims & full control of PMC documents & correspondences with all project service providers including project appraisal reports as when needed by the management .
Back Fill Plant with 6.8 km long disposal MS pipe ( 45o mm diameter) up to tailing pond etc. with support foundations.
Ensured safety, Achieved zero fatal accident & loss of injury time (LOIT), attained echo environment.
Engineering of 6-MTPA concentrator audited & handed over to Operation & Maintenance department / KCM Achieved 1.4 km RCC road, width 12m & drains DESIGN, drawings, BOQ. &Budget Cost estimation US$1,479,300/- and contract awarded with management approval and work completed with storm water drains etc.,road concrete thickness 250 mm with one layer of rebar Tor 8mm @200c/c with the reinforced expansion & contraction joints(bitumen & sand filled as specified) of panels of36 sqm &M25-RCC used as road to haul copper ore by 150ton, 300 ton Tippers & also for plant maintenance.
●Sr. staffs house 2BHK /20 nos & hostels-10 rooms with central dining, indoor game & TV rooms, car parks
●Total constructed residential area -30000sft and commercial office area-8000sft in assorted places.
●Engineering, design, drawing review of 3 MTPA West-Rock Crushing plant, for backfill/UG, 200piles for Civil & Structural foundations( RCC) of crushers, Back Fill Tanks(without mixing cement ),heavy duty slurry pumps, & Back Fill Tank ( with mixing cement ), Pipe rack foundations, erection of ms pipe & support structures etc.
●Conveyor-tunnels, ramp & retaining walls, tanks, grinding-mills, sub-station, compressor -lines etc
●2 stream civil works pipeline to Mine shafts from backfill plant / 6.8 km / MS pipe line 45cm dia / HDPE lined were laid up to Tailing dam and the pipe line was tested for specified designed pressure.
●Trained Local Junior Engineers on technical & general management.
●Conceptualized and implemented standard operating procedure in plants for Future Maintenances.
Karlsons Co. Ltd. Kitwe,, Zambia (Consulting Engineers & Project Managers)
Contracts Manager (Oct 2005 Aug. 2006)-10months
Key Profile:
●PMP-cycles of engineering foundation-design modification, assisting tender process, procurement, construction management of Foundation/ Ball Mill-0.3 MTPA capacity erections with Girth-Gear Motor, Roof mounted of maintetance rcc TUNNEL etc. in Konkola Copper Mines at Chililabombwe, Zambia / Project-cost(civil)-one million U.S.D, Achieved mechanical completion in 9months inclusive Modification of Vendors Foundation Design, BOQ, Project cost estimation etc.
●Rehabilitation of Sr. staff house of area 3000sft with major amenities & interior design changes to high stds.
G M International, Lusaka, Zambia (Building & Road Construction Co.
Contracts Manager (Feb 2004 Aug 2005) -1year 7months
Contracts Manager (Sep 2000 May 2001) -9months
Key Profile:
Contracts Manager (Feb 2004 Aug 2005)
PMP- cycles of OFFICE buildings and roads (T2-Highway of EPCM-Civil projects / Chingola-Solowezi, 10 km/ 4lane, & 3nos BOX CULVERT TUNNELS & 12 NOS PIPE CULVERTS RECONSTRUCTED with laying of new Asphalt layer over 10 km length with rehabilitating all SWD ETC. Cost was us$5,500,000 under Chingola Municipal Council, Zambia with Asphalt concrete finish(Production of asphalt concrete at 176 degree-Centigrade in hot mixing-plant, checking lab test of quality-materials, Marshall-strength,bitumen content-4.5% by wt. as per IRC manual etc) inclusive of SWD,Culverts,Bridges rehabilitation job & Lusaka Air Port(Approx. usd100 million) new Taxi ways construction and other rehabilitation jobs at main terminal buildings etc. Achieved total completion in+1yr & working hand in hand with consultant( Zulu Burrow-Zambia) & Client Ministry of Local Govt./Zambia & Ministry of Civil Aviation/Zambia including responsible for processing and control of all approved claims & Bills (running & final) from consultant & client, required for payment processes at right time, necessary to maintain harmony in project/ company- materials flow, cash flow activities in effective planned ways & oversee the IDA funded rehabilitation and expansion projects of Clinic- Hospital at Rural areas, Trade Training Institutes in Districts of Copper-Belt, Solowezi & Munilunga / Zambia .
Contracts Manager (Sep 2000 May 2001) Responsible for assisting tender process, control & monitor of
Materials flow, cash flow at site activities in effective planned ways & all types of R/A & Final claims,
Oversee site office administration (logistic, technical, and commercial) & coordination etc. PMP-cycles of rehabilitation of ZCCM-mine / Nkana- EPC contract of Office; Officer-
Hostel and houses in Kitwe renovation jobs.
Involved in PMP- cycles of executing Alliance Francies -French teaching class rooms construction in Lusaka-Zambia .
200km road repair and construction of 20km/2lane roads with bituminous surface finish of High-ways in Eastern and Southern province & was used premix
asphalt concrete resurfacing .
2 lane highway,cost was us$7,500,000/-
Constructed commercial building areas- 30,000sft(Italian school, hospital, offices etc), residential-6000sft (bungalows & sr. staff house.)
J J Lowe (Z) Ltd., Lusaka, Zambia (Earthworks and Road Building Co.)
Contracts Manager (Jul 2001 Dec 2003)-2years 6months
Key Profile:
Involved in PMP-cycles of EPCM Contract of road and bridge construction projects.& Kashikishi Air strip
rehabilitation job, quantity estimation, BOQ,