Gugun Sihombing
CURRICULUM VITAE
Name
Address
Phone
e-mail Address
Education Back Ground
Place Date Of Birth
Marital Status
Nationality
Personal Interest
: Gugun Sihombing, ST
: Jl. Citanduy Timur – 1 A Block TT 35 Rt.002/015
Perum Graha Asri Kel. Simpangan Kec. Cikarang Utara Cikarang - Bekasi West Java 17550
: **************@*****.**.**
: Metallurgy Graduated
: Sumatera Utara/June 26th, 1969
: Married ( 3 Child )
: Indonesia
: Foot Ball, Volley Ball, Chess, badminton.
TRAINING
1. Research And Development Centre For Metallurgy PUSPITEK 1998 2. Symposium National Besi Baja Bandung Technology Institute. 3. Orient English Course Cilegon West Java 1990
4. Lotus 123, Excel and Microsoft Word Computer Cilegon west Java 1994. AutoCAD UI Jakarta 1999.
5. International Seminar “WELDING REPAIR AND MAINTENANCE” Borobudur Hotel, Jakarta 2003.
6 Conference And Exhibition “Indonesia Pipeline Technology 2004” ITB Bandung. 7. Confined Space Entry/Attendant Survival System Asia Samson Tiara 2012. 8. Global Assistance Healthcare “ Basic First Aid Training ” 2013. ABILITY TO OPERATE :
Microsoft Office Excel
Microsoft Office Windows
Power Point
Gugun Sihombing
- 2 of 22 -
QUALIFICATION AND CERTIFICATION :
Upgrade Barge Loading Conveyor Beyond 44 Mtpa BIB Company
Metallurgy Graduated ( Heat Treatment, PWHT; Metal Forming ;Welding Perform )
Welding Inspector CSWIP 3.1 TWI Malaysia UK ( Attendance)
Welding Inspector B4T Bandung
Radiographer ASNT LEVEL II (SNT-TC-1A)
Painting Inspector In-house Training” International Paint Indonesia”
CSWIP 3.1 Welding Inspector ( Attendance )
PROFESSIONAL OBJECTIVE
1. Familiar With WPS/PQR Welding Spec ASME IX, API 1104, AWS D1.1 2010. 2. Review Installation Piping System For Low Pressure And High Pressure Piping. ASME/ANSI B31.3
3 Reviewed And Inspection Of Pressure Vessel With NDT Equipment By SNT-TC- IA Radiographer Or Interpreter. .Standard Basically Refer To : ASME V ”Nondestructive Test”
4 Familiar With Standard Specification AISC ( American Institute Steel Of Construction” Edition 2005.
5 Inspection And Review Steel Structure, Gallery, Storage Tank/Spherical Tank, Chute/Bin And Hopper, Pressure Vessel, Standard And Code Basic Refer To
AWS D1.1, 2002 “Structural Welding Code Steel”
AWS D14.6,2018 “Specification For Welding Of Rotating Element Of Equipment”
AWS 3.0, 2015 “ Standard Qualification Procedure “.
API 650/BS 2654 “Welding Steel Tank For Oil Storage”
ASMEVIII .”Rules For Construction Of Pressure Vessel”
ASME BPV Sect. V ” Nondestructive Examination” “
AS/NZS 4100 “Welding Structural Steel”
AS/NZS 3678 “Structural Steel-Hot Rolled Plates, Floor Plates And Slabs”
AS/NZS 3679.1 ”Part 1: Hot Rolled Bar And Sections”
AS/NZS 3679.2 ”Part 2: Welded I Section”
JIS G 3192 “Dimension And Tolerance”
AS 1554 “Structural Steel Welding”
AS 1554.1 “ Part 1 ; Welding Of Steel Structures’
ASTM D4040 Salt Test Method “Corrosion B117-19”
Gugun Sihombing
- 3 of 22 -
6. Verified And Reviewed Natural Rubber Lining Used For Feedwell And Others Segment Unit And Related To ISO/ASTM Standard such as :
ANSI/ASTM D 3486 Standard Recommanded Practicess For Installation Of Vulcanazable Rubber Tank Lining.
ASTM D 412 Test For Rubber Properties In Tension
ASTM D 429 Standard Test Methods For Rubber Property- Adhesion To Rigid Substrate
ASTM D 471 Test For Rubber Property-Effect Of Liquids
ASTM D 573 Test For Rubber Deterioration in Air Oven
ASTM D 2240 Test For Rubber Property-Durometer Hardness
ASTM 4285 Standard Test Method For Indication Oil Or Water In Compressed Air
ASTM D 4417 Standard vTest Method For Field Measurement Of Surface Profile Of Blast Cleaned Steel
ASTM D 5162 Standard Practice For Relative Discontinuity
( Holiday ) Testing Of Nonconductive Protective
Coating on Metallic Substrates
ASTM E 337 Test For Relative Humidity By Wet-And Dry-Bulb Psychometer
7. Standard Specification Belt Conveyor And Accessories Mining Equipment/Tools Such :
ANSI/CEMA# C136-71 “Sieve or Screen Analysis of Fine and Coarse
ANSI/CEMA # 350-2015 “ Screw Conveyors For Bulk Material “
ASME B73.1 “ Specification for Horizontal End Suction Centrifugal Pumps for Chemical “
ANSI/CEMA B 205.1 Specification For Welded Steel Conveyor Pulley
ANSI/CEMA No. 576, “ Classification Of Application For Bulk Material Conveyor Belt Cleaning “
ANSI/CEMA # 550-2015 “ Classification And Defenition Of Bulk Materials “.
Over 15 Years Experience In Oil And Gas On Shore, Pipeline, Refinery Station, Gathering Station, Station Block, Storage Tank, Piping Work In-Field. And Over 7 Years Experience In Mining Structural Steel Fabrication And Site Sector; Over one Years at Site Mining Plant Installation And Fabrication . Familiar And Responsible to Above Mentioned Subject.
Gugun Sihombing
- 4 of 22 -
R . E . S . U . M . E
( WORKING EXPERIENCE )
DUTIES AND RESPONSIBILITIES
01. Company : PT. Leighton Contractors Indonesia (CIMIC Group) Period : J a n 2 2, 2 0 2 4 - M a r c h 0 9, 2 0 2 5 . Beginning Classification : QA/QC Senior Eng./ C oordinator. Project : Replacement Shell Dryer#1;Dust Agglomeration And AI. Client : PT. Vale Indonesia Tbk.
Location : S o r o w a k o – S o u t h S u l a w e s i I n d o n e s i a Reason For Leaving : Finish Contract
Duties And Responsibilities :
o Coordinate QC Manpower Every day and manage working to be execution. o Meeting Coordinate Every Week Per section area.
o Quality Management System Assessment Related To Work Application. o Coordinate Test Material Concrete Per Building And Area Execution. o Verification And Check All Equipment For Calibration Submitted. o To Manage QC Personal For Training And Assessment. o To Manage Working Execution Per Job Area
o Joint Inspection With Client To Decided And Solve Job on the Site. o Reporting Quality Working Per Period To Project Manager. o To Manage Flow Working Quality Work Every day
o To Create And Compile Quality And Procedure Work All Project o Submitted Quality Control Procedure To Client Spec. Project Specification. o Meeting With Client Per Project To Minimize Miscommunication And Monitoring Flow Progress And Quality.
o Joint Inspection With Client To Verification Material; Working Procedure And Methode Of Statement Running Smoothly according to Project Contract. o To Minimize Mistake Work All Material Structural If Cutting And Welding in Fabrication o Ensure that all procedures run in accordance with expectations in the field o Creating a method of statement in accordance with the Client Specification and its application in the field
o Carry out the division of quality labor according to the qualifications of each individual. o Make quality work decisions according to Client project specifications o Make NDT procedures according to the weight of the Category Service line production. o Ensuring the quality of material testing that can be accounted for to the Client. Gugun Sihombing
- 5 of 22 -
02. Company : PT. Merdeka Copper Gold-Group (PT.MMS ) Period : S e p t 0 5, 2 0 2 2 – D e c 2 3, 2 0 2 3 Beginning Classification : F a b . I n s p . A n d P l a n t I n s p e c t o r ( M a t e r i a l A n d W e l d i n g I n s p . ) . Project : Acid Iron Metal Indonesia Phase-I.
Client : PT. Vale Indonesia Tbk. Sorowako-South Sulawesi-Indonesia. Location : I M I P M o r o w a l i - C e n t r a l S u l a w e s i - I n d o n e s i a R eason For Leaving : Finish Contract
Duties And Responsibilities :
o Inspection And Reviewed Vendor For Unit/Material On Fabrication. o Expedite Flow Material In-coming And Out-coming To Workshop ( Row Material And Product Progress That Delivery To Site ).
o Conducted Of Welder Test Refer To Welding Procedure Specification Client According to Client Specification.
o Meeting And Coordination To All Vendor Fabrication To Speed Up Progress. o Coordination Meeting With PT. Merdeka Cooper Gold Group. o Check And Verified Material Regarding To ASTM,ANSI And GB China Standard. o Meeting Coordination With Vendor Fabrication Workshop And Site Workshop ( Local And China Vendor ).
o Inspection And Verification Unit And Piping To Hydro And Pneumatic Test. o Check And Inspection Mechanical And Unit Performance After Installation And Fabrication. o Assessment And Verified Piping To Hydro And Pneumatic Test. o Request NDT After Welding And Ready To PWHT Regarding To Project Spec. And IOM Vendor Manual.
o Reviewed Project Specification And Vendor IOM Manual Spec. To Unit And Machine Manual Standard/SOP.
o Reviewed And Making Working Method For Dryer Feed End Shell From Start To Finishing/Commissioning.
o Compile Data And Document After Commissioning For MDR Fabrication With Client Representative.
o Conducted Inspection Mechanical Alignment Pump, Machine, Ball Mill, And Others Unit. Gugun Sihombing
- 6 of 22 -
03. Company : PT. Thyssenkrupp Solution Indonesia
Period : May 10, 2021– 10 July,2022.
Beginning Classification : QA/QC Manager.
Project : Dryer#3 Feed End Shell ; Bull gear Replacement Kiln#3 PTVI. Client : PT. Vale Indonesia Tbk. Sorowako-Sulsel Indonesia. Location : Sorowako-South Sulawesi Indonesia
Reason For Leaving : Finish Contract
Duties And Responsibilities :
o Reporting Fabrication And Meeting With Client PT. Vale Indonesia. Tbk. o Make sure Reviewed And Verification Material Related to Client Specification Check by PMI Test.
o Conducted Of Welder Test Refer To Welding Procedure Specification Client According to Alloy Material ASTM A 387 Grade 91Class-2. o Prepared Equipment And Tools For Client Requirement And Tools Specification. o Verified And Request For RFI Non-destructive .
o Check And Verified Material Related to Client And Material Standard. o Welding Reporting To Client by RFI Prior To NDT. o Check And Verified Consumable with Humidity, Backing Temp. Holding Temp And Maintenance Temp.
o Assessment And Reviewed Tools Safety Devices/ Lifting Gear And Registered Certification To DISNAKER by Third-party.
o Meeting Coordination With Client Weekly Meeting Progress With PT. Vale Indonesia And JO Company.
o Check And Verified Material Already For DHT And PWHT. o Make-sure Material Will be PWHT Refer To Material Specification. o Making Graph And PWHT Data Base by Material Specification. o Check Welding, Hardness After PWHT Material And Compare To Material Specification.
o Request NDT After Welding And After PWHT With Client Specification And Code. o NDT Circumferential With 100% No Defect In Material Include Lamination Material. o Reviewed And Making Working Method For Dryer Feed End Shell From Start To Finishing/Commissioning.
o Compile Data And Document After Commissioning For MDR Fabrication With Client Representative.
o Alignment Bull-gear And Shell Kiln.
o Poly-scan Shell Dryer#3 And Alignment Related To Manual ThyssenKrupp Specification.
o Conducted Welder Test For Alloy Steel Material With Client Spec. o Conducted /Verified NDT And PWHT to be done with properly as like as Project Specification and Related to AWS D14.6 And ASME B31.1; ASME IX;ASME II . o Meeting With Client To Make sure Welding Electrode; PWHT Performance that To be used in Dryer#3 Project.
o Conducted And Coordinated Manpower Volume Regarding To Working Plan. Gugun Sihombing
- 7 of 22 -
04. Company : PT. Powertech Indonesia
Period : June 04, 2021– Sept 04, 2021.
Beginning Classification : QA/QC Coordinator Manager. Project : Pertamina RDMP SMP Package#5 Balikpapan- Kaltim. Client : PT. Pertamina RU-V Balikpapan Kalimantan Timur. Location : Balikpapan – East Kalimantan
Reason For Leaving : Finish Contract
Duties And Responsibilities :
o Making And Implementation Fabrication Document Reporting To Pertamina RU-V Balikpapan.
o Making And Implementation Method Of Statement Work And Installation Piping Related To Client Specification.
o Conducted Of Welder Test And Welding Procedure Specification Material Carbon Steel, Low Temp. And Normal Temp.
o Prepared Equipment And Tools For RFI Client Related To MIGAS Requirement. o Verified And Request For RFI Non-destructive As Client Specification. o Estimate Welding Consumable To Used Pe-month On The Project Activity o Verified Material ETA on site area
o To Regulate material will be Used on site
o Welding Reporting To Client With PICS System
o Check And Request/RFI Inspection With C-SPACE System To Contractor And Client. o Assessment And Reviewed Tools Safety Devices And Registered Certification To DISNAKER.
o Meeting Coordination Progress With Client And JO Company. 05. Company : PT. Bajatama Djaya Lasindo
Period : March 10,2021 – May 25, 2021
Beginning Classification : QA/QC Manager
Project : 1. PT. Amman Mineral 2. PT. MIFA Coal
Client : PT. Sanggar Sarana Baja Jakarta
Location : Jakarta - Indonesia
Reason For Leaving : Finish Contract
Duties And Responsibilities :
o Verified, Inspection And Check Material Completion. o Inspection Material And Verified Tools Used For Activity Working. o Estimate Schedule per unit Chute And Structural Fabrication. o Reporting Progress on Weekly Project
o Verified Material ETA on Worksop area.
Gugun Sihombing
- 8 of 22 -
o To Make sure Material To Used Related To Position Unit Material Working Area o Meeting coordination With Fab. Manager And Client. o To Order Material For Install on Unit.
o Inspection Material Painting according to Client specification and ISO requirement o Check And Verified Dimension Chute And Equipment Related To Drawing Engineering.
o Check and verified Material Tools For Machining. o Measure Material Prior And After Fabrication.
06. Company : PT. Bumi Agung Perkasa Indah
Period : Nov 07, 2020 – Feb 07,2021
Beginning Classification : QA/QC Coordinator/Welding Inspector Project : Upgrade PERTAMINA Tiung Biru Bojonegoro Jatim Client : PT. Rekayasa Industry – Jakarta
Location : Jakarta - Indonesia
Reason For Leaving : Finish Contract
Duties And Responsibilities :
o Verified And Check Material Completion On Unit
o Expediting Fabrication Material On Sub-Contractor. o Estimate Schedule per unit area working
o Reporting NDT And Visual Progress on Weekly Project o Verified Material ETA on Workshop area
o To Regulate material will be on site
o Reporting Progress, Outstanding, and working plan o Meeting coordination With Team Manager And Client. o Verified Material according to Project specification. o Inspection Piping before, during and after Fabrication. o Joint Inspection Piping After Fabrication With Client. o Check and verified Painting Performance In Workshop And Sub-Contractor. o Verified Painting Performance As Client Requirement. 07. Company : PT. Jakarta Prima Cranes
Period : March 05, 2018 – March 04, 2020.
Beginning Classification : Project Coordinator.
Project : Upgrade BLC Beyond 44 MTPA Bunati Port Kalimantan Client : PT. Borneo Indobara ( BIB Sinarmas Group ) Location : Angsana Tanah Bumbu South Kalimantan-Indonesia Reason For Leaving : Finish Contract
Gugun Sihombing
- 9 of 22 -
Duties And Responsibilities :
o Accurately forecast revenue goals set for Estimate Cost And Material To Installed On Unit
o Verified And Check Material Completion On Unit
o To Manage Manpower For Action Activity on Team
o Verified Manpower And Estimate Time Line Schedule o Estimate Schedule per unit area working
o Reporting Progress on Weekly Project
o Verified Material ETA on site area
o To Regulate material will be on site
o Reporting Progress, Outstanding, and working plan o Meeting coordination With Client on Office And Site o Verified Safety on the track regulation
o Maintain Safety on regulated No Accident
o Maintain Safety on No Lost Time Injury
o To Order Material For Install on Unit/Building
o Verified Material accord to Unit Skirt Board, Lining Chute Rotary etc. o Verified Material Painting accord to Client specification and ISO requirement o Estimate cost for refurbishments unit/chute surge bin and other material mining equipment/tools.
o Check and verified output and input unit cost operation project. o Estimate cost for next planning works and material on mining structural and mechanical.
o Estimate Time schedule for completed unit/area mining structural. o Reporting status and outstanding work structural/unit mining equipment. o Reporting all day activity to Mining Head Operation responsibility project. o Presentation progress and safety to Mining Head Area every month. o To maintain all manpower always fresh everyday with distribution Vitamin and mineral supply.
o Always to obey regulation and safety management standard ISO 18000 and ISO 14000. MSA Regulation, HIRAC And JSA.
o Develops a cost-effective plan and schedule to completion of project following a logical pattern for utilization of resources.
o Minimizes exposure and risk by implementing and audits safety standards and quality assurance control.
o Coordinates work of subcontractors working on various phases of multiple project. o Oversees performance of all trade contractors and reviews architectural and engineering drawing to make sure that all specification and regulation are being followed.
o Is responsible for proper administration of construction contracts and for obtaining all necessary permit and licenses. o Supervises assistant managers and superintendents, reviews their report checks any reported difficulties, and correct any safety violation or others reported deficiencies.
o Tract and controls construction schedule and associated cost to achieved completion of projects with in time and monies allocated. o Reports to owner, architects and portfolio manager about progress and any necessary modification of plans that seem indicated, plans, implements, tracts and closeout/turnover of construction projects, in supervisory role. Gugun Sihombing
- 10 of 22 -
o Manager day to day operational and tactical aspects of multiple construction projects in a supervisory role. o Manager day to day client interaction and expectation, directly or in a supervisory role projects.
o Generates and issues regular internal and external project reporting through company software (View Point).
o Proactively identifies changes in project scope and ensures appropriate measures are taken.
o Project changes in scope and revenue.
o Administers submittal review process between
subcontractors/suppliers and design team.
08. Company : PT. Murinda Iron And Steel
Period : September 08, 2017 – February 28, 2018
Beginning Classification : QA/QC Painting Coordinator Final Classification : Supervisor Painting
Project : Batang Mitsubishi Power Plant Project
Client : PT. Mitsubishi Power
Location : Batang Central- Java Indonesia
Reason For Leaving : Finish Contract
Duties And Responsibilities :
o Make sure Material Will be Painting With Client Specification. o Inspection Material According To Painting Specification. o Reporting Material Painting As Client. Report Format o Verified Painting Preparation Related To SSP-10 With SA-2.5 or Client Spec.. o To Regulated/manage the Material Flow paining per project. o Inspection Painting Performance Prior, During And After painting Works. o Meeting With Client About Painting Progress And Performance. o Check Random Blasting Performance and Reviewed Reporting . o Reviewed And Verified The Standard And Code For Client Specification And Applied To Standard manufactured PT. Murinda Iron And Steel.. o Inspection Visual Painting Performance.
o Expedite Material For Subcontractor And To Manage Time Schedule Delivery. o Reporting Fabrication Progress Per Week To Construction Manager. o Meeting Progress With Subcontractor Fabricator Per Weekly. o Inspection Material Achieved Progress Everyday . o Verified The Painting To Be Used For Material As The SSPC, ISO,NACE,AS Such : 1. International Protective Coating “Technical Recommended” 2. Carboline Protective Coating “ Technical Recommended “ 3. Jotun Protective Coating “ Technical Recommended “ 4. Giros Coating Inspector Indonesia “ Inspection Quality Control “ 5. SSPC PA-2 Measurement Of Dry Film Thickness With Magnetic Gauge
Gugun Sihombing
- 11 of 22 -
09. Company : PT. Bumi Suksesindo
Period : June 16, 2016 – April 15, 2017
Beginning Classification : QA/QC Fab. Inspector
Final Classification : QA/QC Fab. Inspector
Project : Tujuh Bukit Copper And Gold Banyuwangi - East Java Client : PT. Bumi Suksesindo
Location : Banyuwangi East Java - Indonesia
Reason For Leaving : Finish Contract
Duties And Responsibilities :
o Verified Incoming Material as The Engineer/Client Specification. o Inspection Welding Performance Refer To Client And AWS D1.1 Ed. 2010. o Reporting Welding And Progress Data Refer To MOM Weekly Report.. o Inspection Welding After Completed Fabrication,. o Conducted And Review Worksheet Report Prior To Summarized To QA/QC Coordinator.
o Verified Material To Be used on Installed.
o Inspection Welding And Welder Performance,
o Check And Verified Welder And welding Performance Prior To Applied For Work..
o Reviewed And Check Painting Performance After Finish Painting. And Accord To Standard Specification By Premiero Consultant
o Monitoring Working Performance Welder, Painter And Delivery Material Member To Site.
o Check And Verified DFT Painting Accordance to Painting Schedule. o Meeting With Client about Progress Fabrication.
o Push And Monitoring Progress Fabrication And Shall be Follow-Up To Fabrication Manager To Speed Up Progress.
o Joint With Expeditor To Monitoring Delivery Progress And Push The Fabricator To Make Urgent First Priority For Delivery.
o Inspection And Verified Such as : Adsorption Pressure Vessel Tank 01 – 06 And Adsorption Column Refer To ASME VIII ; Elution Column; Carbon Kiln Feed Bin; Carbon Quench Tank; Acid Wash Column; Electowinning Cell; EWC Anode/Cathode Wash Box; Mercury Scrubber. Filter Feed Bin And Mining Structural Steel Building.
Gugun Sihombing
- 12 of 22 -
10. Company : PT. Sepuluh Sumber Anugrah
Period : November 05, 2015 – December 31, 2015
Beginning Classification : QA/QC Coordinator
Final Classification : QA/QC Eng. And Coordinator
Project : Fertilizer Project Luwuk West-Sulawesi Indonesia Client : PT. Panca Amara Utama
Location : Luwuk West Sulawesi Indonesia
Reason For Leaving : Resign
Duties And Responsibilities :
o Coordination With All QC Site Personal How To Manage Piping Works, Refer To Client Regulation.
o Reporting Welding Data After Data Welding Completed To Client. o Inspection Welding as General After QC Reported To Me And Review Historical Welding Data Sheet.
o Review Welder, After Welder Test Conducted And To Ensure Data From Background Experience Welder previously.
o Make Welder Coupon Test As Refer To Client Specification And Base On ASME B31.3.
o Verified And Make sure Material For Fertilizer Accorded To Client Spec. ( KBR Consultant) have been same as application on Site. o Meeting With Client About Piping Progress Especially Quality Progress. o To Manage Flow Welding Process From Prepared up to Heat-Treatment Process.
o To Make sure Welding Process accorded to Client Spec Especially For Choice Welding Rod.
o Make sure Material Eng, And Design Refer To ASME B31.1 And KBR Consultant. o To Manage Heat-Treatment Flow Progress.
o Conducted And Make WPS And PQR Test Performance such as Carbon Steel P1, Stainless Steel P8 And Alloy Steel Heat Resisting P5A, P5B. P21, P22 And P91. o Decision maker For Take Off Welding for X’Ray Application after Visual Inspection With Client Random And 100% Test Application. o Determine Welding X’ray Application as according to Welding Map. 10. Company : PT. Bajra Mandala Sakti Jakarta-Indonesia Period : July 02, 2015 – October 31, 2015
Beginning Classification : QA/QC Piping
Final Classification : QA/QC Eng. And Coordinator
Project : P15013 Tembang Gold Project (Sumatra Copper And Gold ) PT. Dwinad Nusa Sejahtra Musi Rawas-Sumsel Indonesia Client : PT. Dwinad Nusa Sejahtra
Location : Musi Rawas South - Sumatra Indonesia
Reason For Leaving : Finish Contract
Gugun Sihombing
- 13 of 22 -
Duties And Responsibilities :
o Inspection Material Prior To Use With Client.
o Inspection Welding Performance Refer To Piping Process And Client Specification. With ASME B31.3
o Reporting Welding Data After Data Welding Completed To Client. o Input And Review Data Historical Data Sheet.
o Conducted And Review Client Specification/Project Specification. o Verified Material To Be used on Installed.
o Inspection Welding And Welder Performance,
o Check And Inspection Welding Fusion And Compressed Joint HDPE Pipe P10. o Verified Line Pipe And Rute According to P & ID And Standard Specification Process.
o Inspection Painting application refer To Client Specification. o Inspection Mining Joint Hose With Other Joint Material. o Check And Verified DFT Painting and Reporting to Client. o Meeting With Client about Progress And Piping Quality. o Verified And Completion of Punch List With Client Refer To Mining Plant Process Specification.
o Joint With Client to execution Wet And Dry Commissioning Mining Plant such as Hydro-Test And Pneumatic Test.
o Verified All Process regarding to Project Specification And P A& ID Piping Route.
o Compile QA/QC Document Including Manufacture Data Report. o Make NDT Map And NDT Report Refer To Client And Engineering Specification Project.
o Conducted NDT Application with Dye Penetrant Test. o Line Check Prior To Commissioning And Hydrotest. 11. Company : PT. Apeco Kencana
Period : February 23, 2015 – June 31, 2015
Beginning Classification : QA/QC Eng . Insp.
Final Classification : QA/QC Manager
Project : Coal Fired Boiler Power Plant 2 X 135 MW Babelan Bekasi Babelan Bekasi West – Java.
Client : PT. Cikarang Listrindo Indonesia
Location : Babelan Bekasi West Java Indonesia
Reason For Leaving : Finish Contract
Duties And Responsibilities :
o Inspection And Verification Material C/S;S/S; And Alloy Steel. o Submitted And Make the Fabrication Procedure And Specification Piping Plant And Project.
o Reviewed Piping Drawing Prior To Piping Execution on Construction. o Inspection Piping Progress And Quality With Client. Gugun Sihombing
- 14 of 22 -
o Reviewed Painting Schedule Application.
o Check And Reviewed Painting Site Application And Reporting To Client. o Conducted Welder Test For C/S; S/S And Alloy Heat Resisting. o Reviewed And Assessment Welder Performance base on Productivity And Quality Refer To Power Piping ASME I Sec-25 For Acceptance Criteria. o Decision Maker For Welding Application base on WPS Power Piping C/S; S/S And Alloy Steel.
o Reviewed And Check Client Specification For Site Application. o Meeting With Client For Quality And Welding Progress. o Verified Material C/S; S/S; And Alloy Steel Refer To Spec. Material For Welding Application Such As : P1 Gr.1 To P1 Gr.1( GTAW And SMAW Process ). P4 Gr.1 To P4 Gr.1 (GTAW And SMAW Process ) ; P5A Gr.1 To P5A Gr.1 ( GTAW And SMAW Process ); P No.8 To Pno.8 ( GTAW Process ); P No.1 To P No.8 GTAW Process ); P No.4 To P.No.8 GTAW And SMAW Process ) o Inspection Painting And Reporting Application And Submitted To Client. o Hydrotest Review And Application For Power Plant base on Power Piping B31.3.
o Reviewed and Interpreter Film Gamma Ray With Random Requirement. o Decision maker For Take Off Welding for X’Ray Application after Visual Inspection With Client.
12. Company : PT. FLSmidth Indonesia
Period : December 2011 – December 2014
Beginning Classification : QA/QC Eng And Fab.Inspector Project : 1. Coal Mobile Stacking Conveyor Tutupan Project 11-022 2. Review And Refurbishment Flotation; Filter And Thickener Unit Dairi Prima Mineral Zinc/Lead Eng.Data
Client : PT. Adaro Indonesia
PT. Freeport Indonesia
PT. Dairi Prima Mineral
Location : South Kalimantan ; North Sumatra; Jakarta Indonesia Reason For Leaving : Finish Contract
Duties And Responsibilities :
o Fabrication Review specification and Manufacture welding standard and specification.
o Witnessed and Inspection Material Structural steel JIS 3106 ;S235 JR;S355 J2 G3; Grade SM 490Y and Bisplate-400 material wear liner. o Conducted to witnessed material welding performance for Bogies MSCT
(Mobile Stacking Conveyor Tripper)
o Conducted to witnessed and assessment fabricator Crushing station and Overland Conveyor.
o Conducted To Witnessed and Supervised of Welding And Welder Qualification Test.
o Reviewed Welding Procedure Standard Related To AWS D1.1 Ed.2010 And Client Specification.
Gugun Sihombing
- 15 of 22 -
o Monitoring Welding Activity As the Client specification and ANSI/AISC 360-05 Code Of Standard Practice For Steel Building & Bridges. o Conducted To Verification of NDT application with 100% UT And 25% Magnetic Particle For Structural Steel.
o Reviewed Hardening Material Specification for Induction surface Hardening for Bogies Shaft and Wheels.
o Supervised and reviewed Shrink-Fit Installation Process For Shaft-Wheel And Roller Guide Material AISI 4140 or SCM 440 or DIN 42 CrMo4 1.7225. o Reviewed And Supervised Case Hardening ( Induction Hardening ) For Wheel And Guide Roller Material AISI 4140/ DIN CrMo4 1.7225 With Hardness 460-550 min.
o Submitted Welding Activity daily to Construction Manager or QA/QC Manager. o Conducted Witnessed Painting Inspection of Material Carbon Steel Brand Jotun; International.
o Reviewed Document Main contractor such as WPS/PQR, MOS And Procedure Specification And Welder Test.
o Verification Material Installation according to Engineering Dwg specification o Review and advised to make MOS (Methode Of Statement ). o Conducted And Inspection Repair Frame MSC (Mobile Stacking Conveyor) TR- 920 With NDT Application.
o Supervised And Reviewed (NDT) application such as MT,UT And Penetrant Test Engineering And Application.
o Supervised Rectification Welding material Structural Overburden Crushing Station; Confined Space And Overland Conveyor.
o Witnessed And Verified Inspection Casting Material A 532 Class-III A/ DIN G-X For