Story
Line balancing in assembly
cell
Implement TPM steps
Languages
Tamil
English
DME (78)
MSPVL Polytechnic College
Jun 2014 - Apr 2017
Summary
Team Lead with 5 years of experience in the vehicle assembly division of the automobile industry. Skilled in managing around 150 workers, ensuring smooth operations and maintaining high-quality standards. Experienced in verifying processes to ensure all products are ready for delivery on time. Committed to meeting production goals and driving team e ciency
Work Experience
Team Lead, TVS Motor Company, Hosur
June 2018 - Present
Successfully lead a team of 150 operators, which helps to achieve the daily hit rate plan and able to deliver product on time
Conducting sunrise and sunset meeting along with line operators about previous days production and booking data Conduct daily FQI and AQI complaints, to reduce production error and improve customer satisfaction
E ciently handling hourly production and shift production hit-rates, consistently achieving targets and defect monitoring (MSN and PSN)
Daily audit of the hygiene parameters of a production line, to ensure always met audit standards
Machine maintenance as per daily checklist
Always keep tracking operator oriented defects to reduce minor stoppages in production line.
Conduct scrap parts review along with my team members, group leader, unit manager, engineering team and SQAD team and taking action to prevent the occurrence
CNC Machine Operator, TVS Sundaram Clayton Limited, Chennai May 2017 - May 2018
Operated CNC milling with precision to produce high-quality parts and components.
Ensured quality control standards were met by inspecting nished products and performing necessary tests.
Operated CNC machines to meet production deadlines and output goals.
Responsible for maintaining and troubleshooting CNC machines to ensure maximum e ciency.
Ramkumar S
Team Lead
Certifications
Pneumatic and Hydraulic system
CNC Machine training
Adhered to all safety protocols and procedures in the CNC machine shop.
Projects
Easy assembly line connection for productivity improvement In an assembly line, when product is moving from sub- assembly store parts where front position lamp and front panel bottom are assembled and move to production line where painted parts are getting assembled.
Here the distance from paint parts production to store parts is 350 meters distant, and sometimes store parts depends on paint parts.
Also the duration for paint part production is 1.45 hrs. To reduce the long distance between two store parts, I merged 2 store parts and brought one store part into the line. This helps to eliminate the manpower, zero stoppage of line, reducing parts usage like 1 xture is enough inplace of 5 xtures, that also reduces cost
Easy to handling due to store parts are getting merged, improved safety as no need to travel and move parts. Finally saving overall time of the production assembly.
Training attended
5's
KAIZEN
POKA YOKE
7QC Tools