Post Job Free
Sign in

Program Manager Production Supervisor

Location:
Valencia, CA
Posted:
April 10, 2025

Contact this candidate

Resume:

SKILLS

*Team Player Excellent People Skills.* Committed To On Time Performance. * New Product Implementation with user training. * PC Material / Inventory from Cradle To Grave.

STRENGTHS

Sr. Planner F15/F16 Fly By Wire Stick Force Sensors. Lear Sigler

• Sr. Project Planner KC-135 Boom Refueling Controller. Curtis Wright

• Program Manager Boeing C.E.S.L. Radio Program. Sr. Systems EXPERIENCE HIGHLIGHTS:

1/24 to 4/24 AviBank (Entegee Contractor), North Hollywood — Sr. Planner Order Release “Tier One & Tier Two” assemblies jobs packet. Schedule Level Three Component to meet MRP/ERP requirements. Level Load machine shop with priority one/ two on daily dispatch list. ECO / ECR and daily shop order splits as required.

8/2023 to 1/24 Sunvair, Valencia CA — Program Manager (Contractor) Manage landing gear for Boeing 717, Canada Q400 ensuring timelines are being met, monitor status of gears and components to assure schedules are met. Point of contact with customers daily and weekly. 2/22 to 6/2023 Virgin Galactic (RCM Contractor), Mojave — Sr. Planner Sr. Production / Material Planner Friday - Sunday Shift 36 Hr. Master scheduler / Order release scheduler machine shop Mon - Tue VMSS Eve Mothership Engineering Modification Project Team.

5/10 to 2/22 KELLER WILLIAMS VIP PROPERTIES, Valencia CA, 661-***-**** Independent Contractor: Real Estate Agent: Buyers, Sellers, 10/07 to 4/10 CURTISS WRIGHT ELECTRONICS, Santa Clarita CA, 661-***-**** Sr. Production Program Planner: Order Release scheduler, generate MRP requirements Via SAP /ERP system. Follow up and follow through all program material shortages. Process rejected level 1 and level 2 assemblies though MRB. ECO disposition at CCB meeting weekly. Generated Line of Balance reports, Estimated Time of Completion StopLight Reports, monthly program production review meetings. Generated rework instruction in Routers (EMQ) for manufacturing. Process (FACAR) for all return assemblies for repair Warranty and Non- Warranty product for MRO Repairs department.

04/04 – 10/07 SIERRACIN/SYLMAR / PPG, Sylmar CA 818-***-**** Production Supervisor ``Armor Division" 2nd Shift: Production Supervisor for 61 employees in the Trans Tech / Armor division. Charged with detailed resource capacity planning for five production output start centers. Cross train employees for each start center. Charged with reporting production output and efficacies via stoplight reports. Implementing 5S concepts throughout all the production work centers. Charged with conflict resolution and day to day supervision responsibilities.

Work With Following Systems

SAP, EMQ, MRB,ORACLE,AGILE,DATA FLOW.POWER BI,K-BOX,QUANTUM,TEAMS, & SIGHTLINE EDUCATION

Kennedy High, Granada Hills — Diploma

Class Of 1981

Mathematics Major

California State University Northridge — Studied

(APICS) Production Overview Master Planning 1987 (APICS) Production & Inventory Control 1987

(APICS) Material Requirements Planning 1988 (APICS) Just In Time Manufacturing 1988



Contact this candidate