Michel Arria
Altamonte Springs, FL *****
*****************************@***********.***
Professional Summary
Solutions-focused, motivated Project Coordinator with a comprehensive architectural background utilizing AutoCAD. Ability to juggle several projects simultaneously while working under pressure in fast-paced environments. Highly versatile; quickly masters new roles, responsibilities, technologies and environments. Reputation for integrity, problem solving abilities, work ethic and analytical skills. Willing to relocate: Anywhere
Work Experience
Crew Leader/Driver
PRT Staffing-Orlando, FL
September 2024 to Present
As crew leader I was responsible for staging used car for Mechanical Shop, Detail, or Certified Inspection. I was assigned a group or 2 people to direct the destination per Assignment using a TC (Terminal Computer).
Senior Cad/BIM Lead
SEBREE Architects, Inc.-Avon, IN
October 2022 to March 2024
I am in charge to oversee the procedures and standards. Troubleshooting and training for CAD/BIM, created cad palettes for efficiency. And experience is Multifamily, mix use, height rise and. Hotels/Resort
Projects:
BMO bank: T&W Design & Build
Blain Apartments: Carr Property Group
Riley Gateway Park: Equity Property Management
Madison View: Equal Development
Good Shepherd Baptist Church: the owner is the church Architectural Job Captain
Forum architecture-Altamonte Springs, FL
March 2020 to September 2021
I was in charged of creating Construction for various key projects throughout the United States. Developed designs, construction details. Using Auto cad and Revit Technical Specialist
Humphreys and Partnerts-Maitland, FL
January 2013 to March 2020
Contributed dynamic leadership skills in managing a team of contractors, architects, designers, production artists, in day-to-day activities. Consistently achieved and surpassed company goals and objectives in the development of various key projects throughout the United States. Developed designs, construction details and competent drawings for complete and complex engineering systems, structures and plants. Created assembly drawings with required assembly notes, detail views and section views. Key Projects:
• Westshore Student housing (Tampa, fl)
• Shadow Lake
• Heron Sky (Missouri)
• The Standards At Athens (Ga)
• Aurora (Richman Group) (Tampa Fl)
• Grady (Richman Group) (Tampa FL)
Project Manager/3D Cad Detailer
Team Design Shop-Orlando, FL
January 2012 to December 2013
Created assembly 3D drawings with required assembly notes, detail views and section views. For Custom pieces for Convention center
Document Control Contractor
Disney
June 2010 to May 2012
Responsible for scanning documentation, compilation of PDF files, and preparation of the digital documentation for entry into a database.
Responsible for fixing and correcting missing links from cad drawings. Adobe Acrobat Professional
Experience with Architectural and/or Mechanical Drawings Understanding of configuration management (revision control) Database query experience Senior CAD Drafter
Nassal-Orlando, FL
January 2009 to December 2010
Create details for shop drawings for theme parks and museum. Network Technician
Synapse360-Orlando, FL
March 2009 to February 2010
Part time - Setup office networks, installing network cables to every future workstation, testing connectivity and setting up the main server.
Project Coordinator
Fugkeberg Koch Architecs-Maitland, FL
January 2006 to December 2009
Designed a broad range of 3D for concept design and converted 2D models into 3D detailed drawings. Developed designs, construction details. Created assembly drawings with required assembly notes, detail and section views. Extensively researched and analyzed Consultant Requests and created artwork for concept presentation using Adobe Photoshop Key Projects:
• Lighthouse Key Project (Osceola County)
• Glenwood, and Oxford Ridge Project (New York)
• The Fountains (Preview center)
• Blue Green Renovation
• Bloomingdale Project (Tampa Florida)
Project Coordinator
The Scott’s Partnership Architecture-Maitland, FL
January 2005 to December 2006
Spearheaded project design and management of architectural interior projects, including converting 2D models into 3D models with marketing proposals, rendering building elevations, developing constructions details, and creating component drawings to internal standards with appropriate dimensioning. Collaborated directly with architects and clients to establish objectives as well as formulate design plan and cost estimates.
Reviewed and checked calculations, design models, drawings and design documents for quality, accuracy, neatness, functionality and satisfactory completion. Key Projects:
• Herndon Plaza renovation Kmart Building
• Bellagio Resort and Spa
• Uptown Altamonte Project
Senior CAD Drafter
Fugleberg Koch Architects
January 2001 to December 2005
Converted 2D models into 3D detailed drawings and created constructions details and component drawings. Analyzed Consultant Requests to determine feasibility and recommended process changes. Helped with administrative work in the print room scanning drawings to be reproduced.Created assembly drawings and designed innovative artwork for concept presentations. Key Projects:
• The Royal pacific (Universal Studios), Lowe's Hotel West Church Street Project
(known as City View), Downtown Orlando
• Blue Green Resort Group
Education
College Degrees in Information Technology
Seminole State
Seminole Community College
Skills
• Project Management (4 years)
• CAD Management (10+ years)
• 3D Rendering (2 years)
• Design (1 year)
• RFIs (6 years)
• IT support (9 years)
• Construction (10+ years)
• AutoCAD (10+ years)
• Microsoft Windows (10+ years)
• Document Management (10+ years)
• Adobe Acrobat (3 years)
• CAD
• AutoCAD
• Construction
• Drafting
• Document management
• Adobe Photoshop
• Windows
Certifications and Licenses
CAD Certification